Loading...
HomeMy WebLinkAboutPermit Building 1994-12-13 OWNER' "" ~'f\ t.1 \. \ \~ ~ PHONE' "",ffi'. \ \ rfY"j 1': 'M 1'.. V, ,1/) , \h ~ ~ ~' CITY- t ~ ')C)( J\ o. -, - '~TATE: 11 ~ DESCRIPTION OF WORK: _(I J1n ~ C11~~ 'NEW '\LJ REMODEL ADDITION DEMOLISH U) OTHER / ( ~OMMERCIAl/INDUSTRIAL. SPRINQFIELD -JOB NUMBER Cf4 I~{) PERMIT APPLICATION L~ INSPECTION LINE: 726.3769 225 Fifth Street, Springfield, Oregon 97477 ~ ~ OFFICE: 726.3759 LOCATION OF PRO PC/SED WORK: -09 ~ ill.n..d..mm d t:P Yn..J. I P rJ--, ASSESSORS MAP' I '1110 \ ~n() , TAx:2f161CO q~~. roCX) ZIP: crl4r\1 VALUE: NAME ADDRESS PHONE ARCHITECT: CONTRACTOR'S NAME ADDRESS CONST. CO NTRACTO R . EXPIRES PHONE GENERAl, PLUMBINf" MECHANICAl' ELECTRICAL: PLUMBING NO, I FEE I MECHANICAL J I CHARGE I .", ~~~ "U6Qr-e I I I Furnace/burner & vent I < 100.000 BTUs I I Furnace/burner & vent I > 100.000 BTUs 1f),ro I I Floor furnace and vent I I fl{)CO I I Suspended wall or floor I mounted unll heater I I I Appliance Vent I separate I I StatIonary evap. I cooler I I Vent Fan/SIngle I ducl I~~I I Vent System apart I Irom AC or htg. I I I Mechanical exhaust I hood and duct I I I I I I I Permit Issuance $10.00 I I' I I TOTAL PERMIT 0' I Single Fixture Relocated Bldg. !new Ilx. addUl. Water Service....f\~ lJr..r J fl. Sanitary Sewer' 1\0. c:. NDllt. Storm Sewer I I , I I I I I TOTAL PERMIT I I Backflow Device I I lllnl1tt n 1 l,h II frJ 1(' r\ " ~ I MJt'\ r .m.J i(')ti)"{' b.t.n. \ Mm()~d~ II. - OFFICE USE - HANDICAP ACCESS' aUAD AREA:-5Q~\\.)U ') LAND US.' FLOOD PLAIN' . OF BLDGS' · OF UNITS' ZONING: LIGHTING POWER BUDGET: WATER HEATER: OCCY GROUP' · OF STORIES: CONSTR. TYPF' HEAT SOURCF' sa. FT. $/ sa. FT, VALUE sa. FTG MAIN X X X sa. FTG ACCESS sa. FTG OTHER TOTAL VALUE OF PROJECT_ PLAN CHECK FE~ RCPT' DATE BY I BUILDING PERMIT ' PLUMBING I \SI::\p0 DEMOLITION /5% State 5% State I -4'~1 Surcha!{Je Surcharge I MECHANICAL I ~I~'JRK 15% State I I SUBTOTAL \ lo1 AD Surcharoe FT. PERMITS I PAVING, I CURBCUT I I SYSTEMS FT. DEVELOPMENT TOTAL PERMIT FEES I EXCLUDING ELECTRICA' \UflAD I , , It Is the responsibility of the permit holder to see that all Inspections are made at the prC!>per time. To request an Inspe~t1on, call 726.3769 (recorder), state your City designated job number,lob address. type of Inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day. requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. . REQUIRED INSPECTIONS . UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work Is covered. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work Is to be covered until these Inspections have been made and approved. PAVING: After gravel Is In place but prior to placing asphalt or concrete~ ~. FOOTINGS & FOUNDATIONS: To be made after trenches Bre excavated and forms are erected, all steel In place, bul prior to placing concrete, FIREPLACE: Prior to placing facing materials and before framing Inspection. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special Inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division, ATTIC DRAFT STOPS & CURTAIN WALLS CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, piping, accessories and other ancillary equipment Items are In place but before any concrete Is placed. FRAMING: To be made aller the roof, all framing, fire blocking and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 P.S.I. (306 a.1) STRUCTURAL WELDS: Performed on the Job, (2722 f) -+- INSULATION & VAPOR BARRIER: To be made aller all Insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering Is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. HIGH STRENGTH BOLTING: During all bolt Installation and tightening operations. (306 a.6) UNDERGROUND' electrical, gas, Itary sewer, storm sewer, a e ano drainage lines. 0 be made prior to covering or filling trenches. SPRAYED ON FIREPROOFING: UB,C. Standards 43,8. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor Insulation, decking or floor sheathing. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork, (306 a.11 & Chapter 29) FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made aller all lathing and gypsum board, Interior and exterior, Is In place but before any plastering Is applied or before gypsum board Joints and fasteners are taped and finished. GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.c. STDS. 25.10,11). POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing, MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415, SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material In place. v STRUCTURAL MASONRY: (306 a,7) . ~Itm ~t-ru. ~bo uff ID. 'I \ ;)\\~ (\ 1\tl.... ~'~fo. i~'i\aft\N~ 'In a Itlon to the Inspec. tlo peclfled, the Building Official may make or require other Inspections of any construction work to ensure compliance with the Building, City or Development Code. ------------------------------------------------------- ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. FINAL MECHANICAL SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this Inspection. FINAL BUILDING: Requested aller the final plumbing, electrical, mechanical and Fire Department inspections are made and. approved. No occupancy of the premises can be made until a Certificate of Occupancy has been Issued by the Building Division and posted on the premises. fl,,6,/,c /JiJrr.-.5 1"0 ,'y, ~t?ec-t- ~;/ .?~~n~A-7",,?;I- ~ ?'"~ 72.. 6 -So /S t:)"- ~YJ" :544-- FINAL PLUMBING FINAL ELECTRtCAL ADDITIONAL COMMENTS' FINAL FIRE DEPARTMENT >~,--.'r7'1 ~;,j/ "7'4;::/ /h 70 tJ,.,.7-"/ ~~// /-11/1 M/':C? ~;..,..?'<; J' 72...1'7- z: ~ +0 PLANS REVIEWED BY DATe By slgnature,l state and agree, that I have carefully examined the completed application and do hereby certify that all Information herein Is true and correct, and 1 further certify that any and all work performed shall be done in accordance with thE.Orstlnances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certlly that only contractors and employees who are In compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all limes during co~structlo . f$~ Signature' , - ~Z-- Date ~~~/ , -- , , , AMOUNT RECEIVED: \ \ Q,'1 41) \S'I5)\ VALIDATION: RECEIPT .' DATE PAID: ~(E~~ RECEIVED BY: