Loading...
HomeMy WebLinkAboutPermit Building 2003-3-12 . ~G tt:~-..iji"" ........., ,..'.,'..,,1 1JIr...1I .. ~. ... - '.,...,,-_.,".,"__,._._~..,~ ..~...-^_ '.W.,.,.,"" .".) Status: Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line . . CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: COM2002-01229 ISSUED: 03/12/2003 APPLIED: 10/18/2002 EXPIRES: 09/12/2003 VALUE: $ 180,000.00 SITE ADDRESS: 5170 Franklin Blvd ASSESSOR'S PARCEL NO.: 1803034000500 Eugene TYPE OF Warehonse PROJECT DESCRIPTION: Mini-Warehouse TYPE OF USE: New Commercial Owner: FRANKLIN PARK LLC Address: PO BOX 1548 EUGENE OR 97440 Contractor Type Arehiteet Owner # of Buildings: Primary Oceupaney Group: Secondary Occupancy P'rimary Construction Type Secondary Construction # of Bedrooms: SETBACKS Front yard Setback: Side I Setback: Side 2 Setback: Rearyard Setback: Solar Setbacks: Street Storm Sewer Available: Special Instruction: Notes: Description 'CONTRACfOR INFORMATION I Contractor KEATING ENGINEERING FRANKLIN PARK LLC , BUILDING INFORMATION I License # of Stories: 1 Height of ~Q'1\~ Type of Heat: \~ '\\\'t. S ~c;j, VN Water TYPR\'\~'t. 't.~~\'\ \~ ~. R~~~~\~\S \' ~'t.~ ~ ~f\}\\f\; 't.~,,:<lt\n~\~~~~'ib~'tlt-.~~\) ,\',\\S \' Ao.\l't.~ ~ (\~ \S_ \~4)t\.),,~d\Wl(d~ORMA nON, ... '1. it' \)~' \'OIJ" t-.~'\ Overlay Dist: # Street Trees Paved Drive Rqd: 10 B Expiration Date Phone 541-726-9995 Lot Size: Sq Ft 1st Floor: Sq Ft 2nd Floor: Sq Ft Basement: Sq Ft Garage/Carport: Sq Ft Other: Impervious Surface Area: 10,320 REQUIRED PARKING Total: Handieapped: Compa-ct: \}\~eS ':1'0\\\\\'1 , lee; <\0\\ 'O~' ()\' \'a.'l'l e Ole" e se\ ~)" ...,,>.0.: ..d \'(\ _~ 2.( _~"..O IPUBLlC IMPROVEME)~I'J'S.\~~o~,e~~ose ~;~ Ol>-~; I\}\es;' ~,. ",vS ,,'(31. ~ '!c"0~ 0' '" ~O\\ ,. '" Iv ee SiilewalR Type'S \e~ . 0\\ Partially Improved ,o\\~ '!i.\O\\ ~,\-\Jv .\\e"'~' :\~e\e '!i.\~\ea.\\ No ~\o'!i.\,\e~ t'\S'V'IJ Do~.ls""~outsIDtainsi ~OA' . \~ 1>-'<," ~(j.1 el.'" \)""" nA."',. \\\ 0 'l0\) ee\\\! e9>O\\ ~~_'t.:r e'?/:J. t'\ \~e e 01 ee-?; () a.\X\<;i" 'O~ \~ . ,\-'0 e ~e~ :tel \'0 o.\}~ ee\\ I Valuation Descrintion I % of Lot Coverage: Type of Construction Square Foota2e $ Per Sq Ft I of 5 Vatue Date Calculated Status: Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Bid Amount Use Bid Amount . . CITY OF SPRINGFIELD' Building/Combination Permit PERMIT NO: COM2002-01229 ISSUED: 03/1212003 APPLIED: 10/18/2002 EXPIRES: 09/12/2003 VALVE: $ 180,000.00 $1.00 180,000.00 Total Value of Project $180,000.00 $180,000.00 10/18/2002 I Fees Paid I Fee Description Amount Paid Date Receipt Number Plan Review Comml1ndlPublic $536.67 10/18/02 1200200000000000091 -Mechanical Issuance Fee- $10.00 3/12/03 1200200000000000819 + 10% Administrative Fee $122.97 3/12/03 1200200000000000819 + 7% State Surcharge $86.08 3/12/03 1200200000000000819 Addressing Assignment $8.00 3/12/03 1200200000000000819 Annexed 1999 $-15.67 3/12/03 1200200000000000819 Baekflow Device $14.00 3/12103 1200200000000000819 Building Permit $825.65 3/12/03 1200200000000000819 Copies - Ea Addtl @ 50 Cnts Ea $2.50 3/12/03 1200200000000000819 Copy 1st @ 75 eents $0.75 3/12/03 1200200000000000819 Fixture $84.00 3/12/03 1200200000000000819 Minimum/Adjustment Mechanical $39.00 3/12103 1200200000000000819 Planning Final Occy Inspection $110.00 3/12/03 1200200000000000819 Sanitary Sewer - 1st 50 Feet $45.00 3/12/03 1200200000000000819 Sanitary Sewer - Improvement $117.53 3112/03 1200200000000000819 Sanitary Sewer - Reimbursement $154.63 3/12103 1200200000000000819 Sanitary Sewer Each Addtl1 00' $28.00 3/12/03 1200200000000000819 SDC MWMC Administration $10.00 3/12/03 1200200000000000819 SDC MWMC Improvement $61.85 3/12/03 1200200000000000819 SDC MWMC Reimbursement $591.15 3/12/03 1200200000000000819 SDC Sanitary/Storm Admin $238.13 3/12/03 1200200000000000819 SDC Transpo Admin $122.95 3112/03 1200200000000000819 SDC Transpo Improvement $1,824.95 3/12/03 1200200000000000819 SDC Transpo Reimbursement $413.61 3/12/03 1200200000000000819 Storm Drainage Impervious Area $4,063.62 3/12103 1200200000000000819 Storm Sewer - 1st 50 Feet $45.00 3/12/03 1200200000000000819 Storm Sewer Eaeh Addtll 00' $56.00 3/12/03 1200200000000000819 Vent Fan $6.00 3/12/03 1200200000000000819 Water Line - 1st 50 Feet $45.00 3/12/03 1200200000000000819 Water Line - Each Addtl100' $42.00 3/12/03 1200200000000000819 Totat Amount $9,695.37 Plan Reviews , 2 of 5 . . CITY OF SPRINGFIELD Building/Combination Permit Status: Issued PERMIT NO: COM2002-01229 225 Fifth Street, Springfield, OR ISSUED: 0311212003 APPLIED: 10/18/2002 541-726-3753 Phone EXPIRES: 09/1212003 541-726-3676 Fax 541-726-3769 Inspection Line VALUE: $ 180,000.00 Fire Department Review 10/1812002 12/10/2002 OK GRG Plan Review-New Construction-II Mini- W arehousestl; S-I; Type lI-N construction; 2 buildings on site. Provide "No Parking-Fire Lane signs meeting requirement of state-adopted Manual on Uniform Traffic Control Devices spaced 25 feet apart along south curb parking lot (Springfield Uniform Fire Code 901.4.5) Initial Review 10/18/2002 10/18/2002 APP LLH Planninl! Review 10/18/2002 03/07/2003 APP EMM Waiting for Site Plan Review - in progress - Colin Stephens planner. Final Site plan OK on 3/5/03 Public Works Review 10/18/2002 01/31/2003 WE PJO Waiting for Site Plan Approval. Counter conference regarding requirements 1/31/03 Publie Works Review 01/31/2003 02/28/2003 WE PJO Keating called wanting approval. Keating called asking for SDC charges. 1 gave them to him on 2/28/03. He wanted to pay them. 1 said no, not until he has an approved site plan and approved building building permit. Public Works Review 03/06/2003 03/06/2003 APP PJO Received final site plan 3/5/03. Called and asked for building permil copies. K said we had enough. Structural Review 10/18/2002 WE DLM Plan Review comments were faxed to engineer on 11-22-02. Structural Review 12/13/2002 12/13/2002 10 LLH Steve Keating provided Fire Department with new site plan showing new fire hydrant location. Please see fire department approved plans for location. Structural Review 12/13/2002 WE JMP Accepted Keatings resubmission on items 1-4 but faxed him 12-10-02 that items 5-7 have not been addressed satisfaetorily. Structural Review 03/07/2003 03/07/2003 APP JMP Reeeived final data from Public Works end of the day. Left message for Chuck Koehn that permit would be assembled Wednesday, March 12, 2003 and fees would be adjusted for changes received end of the day. SUB Review 10/1812002 10/18/2002 WE LLH Applicant stated at counter he would be bringing in all required energy forms. We will fax to SUB as soon as they are received. lh 3 of 5 ~~":";~".',.,' :.i Wt:,....." ,. . ~ ~ ,~ .... fl ,. '. .'~ . " " ,'" ,', -.' . "-"..~ . ,-" '''''.'.~ -..- ..,--". ^.... . . . CITY OF SrKmhl'lJ!.LIJ Building/Combination Permit Status: Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line PERMIT NO: COM2002-01229 ISSUED: 03/12/2003 APPLIED: 10/18/2002 EXPIRES: 09/1212003 VALUE: $ 180,000.00 SUB Review 02124/2003 02117/2003 WE JF Received Building Envelope code form only. Pass energy code review SUB Review 02128/2003 02/28/2003 APP JF To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. I. Reouired Insnections I I Site Inspection, To be made after excavation but prior to setting forms. 2 Erosion/Grading Inspection: After all erosion measures are in place. 3 Ufer Electrical Ground: Install ground rod at footing and call for inspection in conjunetion with footing and/or foundation inspection. 4 Foundation: After forms are erected but prior to conerete placement. 5 Shear Wall Nailing: Before covering sheathing with finish materials. 6 Framing Inspeetion: Prior to cover and after all rough in inspections have been approved. 7 Wall Insulation: Prior to cover. 8 Ceiling Insulation: Prior to cover. 9 Roofing: Prior to installing any roof eovering. 10 Drywall: Prior to taping. II Firewall: Located and constructed aceording to plans. 12 Roof SheathinglNailing: Before covering sheathing with finish material. 13 Final Fire Department. After all requirements of the Fire Department have been met. 14 Final Building: After all Conditions have been completed as required on Development Agreement. IS Final Building: After all required inspections have been requested and approved and the building is complete. 16 Rough Grading: After gravel is in place but prior to placing conerete. 17 Final Paving: After paving is complete. 18 Underground Plumbing, Prior to filling the trench and including required testing. 19 Underlloor Plumbing: Prior to insulation or decking. 20 Underlloor Drain: Prior to cover or placement of concrete. 21 Rough Plumbing: Prior to cover and including required testing. 22 Water Line: Prior to filling trench and including required testing. 23 Sanitary Sewer Line: Prior to filling trench and including required testing. 24 Line to Septic Tank: Prior to filling trench and required testing. 2S Storm Sewer Line: Prior to filling trench. 26 Final Plumbing: When all plumbing work is complete. 27 Backllow Device, Prior to eovering and provide a copy of the test report on site at the time of inspection. 28 Rough Mechanieal: Prior to Cover 29 Final Mechanical: When all mechanieal work is complete. 30 Ufor Electrieal Ground: Install ground rod at footing and call for inspection in eonjuction with footing and/or foundation inspection. 31 Rough Electric: Prior to Cover 32 Electric Service, Approval required prior to utility company energizing service. 33 Final Eleetric: When all electrical work is complete. 34 Sidewalk - Curbside: After forms are erected but prior to placement of eoncrete. 4 of 5 . . CITY OF ~rKlNGFIELD Building/Combination Permit PERMIT NO: COM2002-01229 ISSUED: 03/12/2003 APPLIED: 10/18/2002 EXPIRES: 09/1212003 VALUE: $ 180,000.00 By signature, I state and agree, that I have carefully examined the completed application and do hereby certifY that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certifY that only contractors and employees who are in compliance with ORS 701.005 will be used on this project. I furtber agree to ensure that all re 'red inspections are requested at the proper time, that each address is readable from ~~ea::~~:;st~~tr~; :::;~ is cated at the front of the property, and the ap;i;:sj ~~Ians will remain on the site Owner or Contractors ~re Date 5 of 5 225 Fifth Street Springfield, Oregon 97477 541-726-3759 Phone Line Items: Job/Journal Number COM2002-0 1229 COM2002-01229 COM2002-01229 COM2002-01229 COM2002-01229 COM2002-01229 COM2002-01229 COM2002-01229 COM2002-01229 COM2002-0 1229 COM2002-01229 C0M2002-01229 COM2002-0 1229 COM2002-01229 COM2002-01229 3/12/2003 2:43:20PM City of Springfield Development Services Department Public Works Department Official Receipt Receipt #: 1200200000000000819 Date: 03/1212003 . Amount Paid 8.00 4,063.62 154.63 117.53 413.61 1,824.95 591.15 61.85 . 10.00 238.13 122.95 (15.67) 825.65 45.00 28.00 Description Addressing Assignment Storm Drainage Impervious Area Sanitary Sewer - Reimbursement Sanitary Sewer - Improvement SDC Transpo Reimbursement SDC Transpo Improvement SDC MWMC Reimbursement SDC MWMC Improvement SDC MWMC Administration SDC SanitarylStonn Admin SDC Transpo Admin Annexed 1999 Building Pennit Sanitary Sewer - 1st 50 Feet Sanitary Sewer Each Addtl 100' Page 1 00 cReceiptrpt '!!l~~~~=~ _..~___,._.,.~ ~: Wi~.""'..... ........".......'.. - ' " , ~""'.,-.' ~ ; t, II "......_"';:.___".C,'~,-'"':-.... _f.'-"",~,~ 225 Fifth Street Springfield, Oregon 97477 541-726-3759 Phone COM2002-01229 COM2002-0 1229 COM2002-01229 COM2002-01229 COM2002-01229 COM2002-01229 COM2002-01229 COM2002..01229 COM2002-01229 COM2002-01229 COM2002-01229 COM2002-01229 COM2002-01229 COM2002-01229 COM2002-01229 Receipt #: 1200200000000000819 Date: 03/12/2003 Water Line - 1st 50 Feet Water Line - Each Addtl 100' Vent Fan Minimum! Adjustment Mechanical Planning Final Occy Inspection Stonn Sewer.. 1st 50 Feet Stonn Sewer Each Addtl 100' Backflow Device -Mechanical Issuance Fee- Fixture + 7% State Surcharge + 10% Administrative Fee Copy 1 st @ 75 cents Copies - Ea Addtl @ 50 Cnts Ea Copies - Ea Addtl @ 50 Cnts Ea Page 2 of3 3/12/2003 2:43:20PM City of Springfield Development Services Department Public Works Department Official Receipt 45.00 . 42.00 6.00 39.00 11 0.00 45.00 56.00 14.00 10.00 84.00 86.08 122.97 0.75 2.50 6.00 . Line Item Total: $9,158.70 cReceipt.rpt 225 Fifth Street Springfield, Oregon 97477 541-726-3759 Phone Payments: Type of Payment Check Receipt #: 1200200000000000819 Date: 03/1212003 Paid By Received By Check Number Confirm No NOHAIR lLC djb Page 3 00 3/12/2003 2:43:20PM , City of Springfield Development Services Department Public Works Department Official Receipt . How Received Amount Paid In Person 9,158.70 $9,158.70 Payment Total: . cReceipt.rpt . . ATTACHMENT A CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE WORKSHEET JOURNAL OR JOB NUMBER COM2002-01229 NAME OR COMPANY: FRANKLIN PARK L.L.c. LOCATION: 5180 FRANKLIN BLVD MAP & TAX LOT NUMBER: 18-03-03-40 500 DEVELOPMENT TYPE: MINI WAREHOUSE NEW DEVELOPED AREA (S.F,): 1O,360,OQ EXISTING DEVELOPED AREA (S.F,): TOTAL IMPERVIOUS SURFACE (S.F,): 28,820,OQ ITE: ITE: LOT SIZE (S,F,): 151 L STORM ORAINAGF. DETENTION BASIN IMPERVIOUS SQ. FT. DISCOUNT 50% $ 0,282 PER SF $8,127,24 TOTAL STORM DRAINAGE SDq $ 4,063.62 28,820 x 2_ SANITARY SEWER-CITY A, REIMBURSEMENT COST: NUMBER OF DFU's B. IMPROVEMENT COST: NUMBER OF DFU's (SEE REVERSE SIDE) 7 x $ 22,09 PER DFU 7 x $ 16.79 PER DFU TOTAL LOCAL WASTEWATER SDC,' $ 272.16 ~ ,,_ TRANSPORTATION BLOG AREA TGSF x TRIP RATE x COST PER ADT x NEW TRIP FACTOR NEW A. REIMBURSEMENT COST: 10,36 x 2.5 x $ 16,81 PER TRIP x 0,95 B, IMPROVEMENT COST: 10.36 x 2.5 x $ 74.17 PER TRIP x 0,95 NTF 1$ 413.61 1 1.824.951 NTF 1$ TOT AL TRANSPORTATION REIMBURSEMENT SDq $ TOTAL TRANSPORTATION IMPROVEMENT SOC:' $ TOTAL TRANSPORTATION SDq $ 2,238.56 ~ , $ , $ 154.63 117.53 4_ SANITARY SEWER. MWMC: NEW: A. REIMBURSEMENT COST: NUMBER OF FEU's 10.36 B. IMPROVEMENT COST: NUMBER OF FEU's 10.36 MWMC CREDIT IF APPLICABLE (SEE REVERSE) 1$ 591.151 x $57.06 PER FEU x $5,97 PER FEU 1 $ 61.85 1 $ TOTAL MWMC REIMBURSEMENT FEE: $ TOTAL MWMC IMPROVEMENT FEE: $ MWMC ADMINISTRATIVE FEE: $ TOTAL MWMC SDC" $ 647.331 SUBTOTAL (ADD ITEMS 1,2,3,&4) , $ 7,221.671 . ~, ADMINISTRATIVE FEES, BASE CHARGE (SUBTOTAL ABOVE) $ 7.221.67 x 5% $ 361.08 TOTAL TRANSPORTATION ADMINISTRATION FEE:I $ TOTAL SEWER ADMINISTRATION FEE: $ pa""-flaJ. ow""b el-J SOC COORDINATOR 1131/2003 DATE TOTAL SDC CHARGES COM2002..o1229. FRANKLIN PARK lLC, 5170 FRANKLlN.xls 413.61 1,824.95 (15.67) 591.15 61.85 10.00 "''' I 238.13 107 J - I $ 7,582. 75 ~ JULY 2001 . . DRAINAGE FIXTURE UNIT (DFU) CALCULA TION TABLE NUMBER OF NEW RXTURES x UNIT EQUIVALENT'" DRAINAGE FIXTURE UNITS (NOTE, FOR REMODELS. CALCU~TE ONLY THE NET ADDITIONAL AXTURES) FIXTURE TYPE BATHTUB DRINKING FOUNTAIN FLOOR DRAIN INTERCEPTORS FOR GREASE/OIUSOLlDS/ETe. INTERCEPTORS FOR SAND/AUTO WASH/ETe. LAUNDRY TUB CLOTHES WASHER/MOP SINK CLOTHES WASHER - 3 OR MORE (EA) MOBILE HOME PARK TRAP (I PER TRAILER) RECEPTOR FOR REFRIGERA TOR/WATER ST A TION/ETe. RECEPTOR FOR COMMERCIAL SINK! DISHW ASHER/ETe. SHOWER, SINGLE STALL SHOWER, GANG (NUMBER OF HEADS) SINK, COMMERCIAL, RESIDENTIAL KITCHEN SINK, COMMERCIAL BAR SINK, WASH BASIN/OOUBLE LA V A TORY SINK, SINGLE LAVATORY/RESIDENTIAL BAR URINAL, ST ALUW ALL TOILET, PUBLIC INSTALLATION TOILET, PRIVATE INSTALLATION MISCELLANEOUS, FIXTURES NEW OLD NUMBER OF EDU'S' UNIT EQUIVALENT 3 I 3 3 6 2 3 6 12 I 3 2 2 3 2 2 I 5 6 3 *EDU (Equivalent Dwelling Unit) is a dischar~e eauivalent to a single family dwel1in~ (20 DRJ) set al 167 ~Ilons ner day TOTAL DRAINAGE FIXTURE UNITS~ DRAINAGE FIXTURE UNITS o o o o o o o o o o o o o o o o I o 6 o o o o 7 CREDIT CALCULA nON TABLE, BASED ON ASSESSED VALUE IF IMPROVEMENTS OCCURRED AFTER ANNEXA TION DATE IN TABLE, CALCULATE CREDITS SEPARATELY YEAR RATE PER $1,000 YEAR RATE PER $1,000 ANNEXED ASSESSED VALUE ANNEXED ASSESSED VALUE 1979 or before $ 4.92 1990 $ 2,06 1980 $ 4.83 1991 $ 1.64 1981 $ 4.77 1992 $ 1.45 1982 $ 4.64 1993 $ 1.31 1983 $ 4,47 1994 $ 1.13 1984 $ 4.30 1995 $ 0.97 1985 $ 4.09 1996 $ 0.82 1986 $ 3.78 1997 $ 0.63 1987 $ 3.41 1998 $ 0.41 1988 $ 2.98 1999 $ 0.22 1989 $ 2.52 2000 $ 0.04 CREDIT FOR PARCEL OR LAND ONLY IF APPLICABLE $ 022 x 71.241 $15,67 IMPROVEMENT (IF AFTER ANNEXATION DATE) x $0.00 CREDIT TOTAL $15.67 COM2002-01229, FRANKLIN PARK LLC, 5170 FRANKLlN.xls JULY 2001