HomeMy WebLinkAboutPermit Building 2003-9-10
.
..... CITY VI< ~rKll~GFIELD
Building/Combination Permit
Status
Issued
PERMIT NO: COM2002-01229
ISSUED: 09/10/2003
APPLIED: 10/18/2002
EXPIRES: 03/10/2004
VALUE: $ 66,855.00
225 Fifth Street, Springfield, OR
541-726-3753 Phone '
541-726-3676 Fax
541-726-3769 Inspection Line
SITE ADDRESS: 5170 Franklin Blvd
ASSESSOR'S PARCEL NO.: 1803034000500
Eugene
TYPE OF WORK: Warehouse
TYPE OF USE:
New
Commercial
PROJECT DESCRIPTION: Mini-Warehouse
Owner: FRANKLIN PARK LLC
Address: PO BOX 1548 EUGENE OR 97440
I CONTRACTOR INFORMATION I
Contractor
KEATING ENGINEERING
WILDlSH CONSTRUCTION COMPANY ....U ,\
,:, '::0-.-'
MITCHS ELECTRIC INC 146745..,0 OIJ18/2005
POAGE ENGINEERING & SURVEYING, INC ,,,00 ~~'V_e;.'-}:)o "
~UlLDlNG INFORMATION I ~ <.00<0<.0'" ~~Q:- OJ":>:.s0~~0 >:-
~<:::s R) \ ,'rf '$'0 .s0C, o'?' _-<::-0 ~o itO
# of Buildings: 1~ ~ ~ # of Stories: . . O~ 'Q~ AJ <; ~I.:otS~~:?>~~Ci
Primary Occupancy Group: .{(~~ <",~<<:- Height of Struetnre O<.0:,001~~60~0--:5 .~Jr~!ls~.:!'1'?~r:
Secondary Occupancy Group: ~ ~~~,~ Type of Heat: ~. oo~ ~ ~ 0 >S' cP<;~l! F~.;,~_iJl\Jloor:
Primary Constructio? Type ~ ok,> <y~~ Water Type: "'{) <:> 'Ii' ~0 }:)O" qf ~Sq.t~1gement:
Secondary ConstructIon T~ ~~ # Range Type: <v~ .s0 00!::l'" &~ ~~~!I~!:rcGarage/Carport
# of Bedrooms: C;;,~ 'i;)4J:' ~ Energy Path;" ~ <; ,,,O~ ':);<::5 'b-~ ~00<.eSfI;ft Other:
~. _~ ~~ 0.. ~ ",,>' ~ ($:-0. di- OJ'" ,:,.s' 0(,0 0 oIrii'pervious Surface Area:
..~.. /,~....^ N"( ;-...."OJ ~ .:~ ()...."'" "'I"'\; ,."(:\. ',G:;
~~" ~~~~'V<S> ~ q,'<>' I DEVELOPMENT INF'ORMA TION"1~0~0'
st~~~~ ">~ 0" c,v ~v U
Front yard Seth'f~~4.. ....<0<:::. Overlay Dist: ~-S
Side 1 Setback: .f' # Street Trees Rqd:
Side 2 Setback: Paved Drive Rqd:
Contractor Type
Architect
General
Electrieal
Engineer
License
Expiration Date
Phone
541-726-9995
541-485-1700
541-747-4483
541-485-4505
51,414
10,355
,5,080.00
REQUIRED PARKING
Total:
Handicapped:
Compact:
Rearyard Setbaek:
Solar Setbacks:
% of Lot Coverage:
Street Improvements:
Storm Sewer Available:
Special Instrnction:
I PUBLIC IMPROVEJ\o,,,,,, '" I
Partiallv Improved
No
Sidewalk Type:
DownspoutslDrains:
Notes:
Paeelof5
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-37691nspeetion Line
Description
Tvpe of Construction
Bid Amount
Estimate
Use Bid Amount
Estimate
Fee Description
Plan Review CommJIndlPublic
-Mechanieal Issuance Fe.....
+ 10% Administrative Fee
+ 7% State Surcharge
Addressing Assignment
Annexed 1999
Backflow Deviee
Building Permit
Copies - Ea AddtJ @ 50 Cnts Ea
Copies - Ea AddtJ @ 50 Cnts Ea
Copy 1st @ 75 cents
Fixture
MinimnmlAdjustment Mechanical
Planning Final Occy Inspection
Sanitary Sewer - 1st 50 Feet
Sanitary Sewer - Improvement
Sanitary Sewer - Reimbursement
Sanitary Sewer Eaeh AddtJ 100'
SDC MWMC Administration
SDC MWMC Improvement
SDC MWMC Reimbursement
SDC Sanitary/Storm Admin
SDC Transpo Admin
SDC Transpo Improvement
SDC Transpo Reimbursement
Storm Drainage Impervious Area
Storm Sewer - 1st 50 Feet
Storm Sewer Each AddtJIOO'
Vent Fan
Water Line - 1st 50 Feet
Water Line - Each AddtJI00'
+ 10% Administrative Fee
+ 7% State Surcharge
Add, Alter, Extend Circ Ea Add
Perm Serv/Fdr 200 amps or less
.
. CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2002-01229
ISSUED: 09/10/2003
APPLIED: 10/18/2002
EXPIRES: 03/10/2004
VALUE: $ 66,855.00
I Valuatinn Descrintion I
$ Per Sq Ft
. or multiplier
$1.00
$1.00
Square Footage
or Bid Amount
180,000.00
66,855.00
Value
Date Calculated
$180,000.00
$66,855.00
$246,855.00
10/18/2002
09/0812003
Total Value of Project
FpP~, tiWiLI
Amount Paid
$536.67
$10.00
$122.97
$86.08
$8.00
$-15.67
$14.00
$825.65
$2.50
$6.00
$0.75
$84.00
$39.00
$110.00
$45.00
$117.53
$154.63
$28.00
$10.00
$61.85
$591.15
$238.13
$122.95
$1,824.95
$413.61
$4,063.62
$45.00
$56,00
$6.00
$45.00
$42.00
$109.20
$76.44
$36.00
$756.00
Date Paid
Receipt Number
1200200000000000091
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
, 1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000819
1200200000000000848
1200200000000000848
1200200000000000848
1200200000000000848
10/18/02
3/12/03
3/12/03
3/12/03
3/12/03
3/12/03
3/12/03
3/12/03
3/12/03
3/12/03
3/12/03
3112/03
3/12/03
3/12/03
3/12/03
3112/03
3/12/03
3/12/03
3/12/03
3112/03
3/12/03
3112/03
3/12/03
3/12103
3/12/03
3/12/03
3112/03
3/12/03
3/12/03
3/12103
3/12/03
3/18/03
3/18/03
3/18/03
3/18/03
Paee 2 of5
.
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Perm ServlFdr 401 to 600 amps
Temp Power 200 amps or less
+ 10% Administrative Fee
Paving
SDC Sanitary/Storm Admin
Storm Drainage Impervious Area
$250.00
$50,00
$43,70
$436.95
$90.77
$1,815.40
Total Amount Paid
$13,359.83
3/18/03
3/18/03
9/10/03
9/10/03
9/10/03
9/10/03
I Plan Reviews I
Fire Department Review
10/1812002
12/10/2002
Fire Department Review
09/05/2003
09/09/2003
Initial Review
Plan nine Review
10/18/2002
10/18/2002
10/18/2002
03/07/2003
Plan nine Review
09/05/2003
Public Works Review
10/18/2002
01/31/2003
Public Works Review
01/31/2003
02/2812003
Publie Works Review
03/06/2003
03/06/2003
Public Works Review
Structural Review
09/05/2003
10/18/2002
09/05/2003
OK GRG
OK GRG
APP LLH
APP EMM
APP
WE PJO
WE PJO
APP PJO
APP EW
WE DLM
Paee 3 of5
. CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2002-01229
ISSUED: 09/10/2003
APPLIED: 10/18/2002
EXPIRES: 03/10/2004
VALUE: $ 66,855.00
1200200000000000848
1200200000000000848
1200200000000002093
1200200000000002093
1200200000000002093
1200200000000002093
Plan Review-New
Construction- "Mini-Warehouses";
S-I: Type II-N construction: 2
buildings on site.
Provide "No Parklpg-Fire Lane
signs meeting requirement of
state-adopted Manual on Uniform
Trame Coptrol Devices spaced 25
feet apart along south curb parking
lot (Springfield Uniform Fire Code
901.4.5)
Revised final site plan. Original
comments frnm 12/10/02 stiU apply.
Waiting for Site Plan Review - in
progress - Colin Stephens planner.
Final Site plan OK on 3/5/03
Revised final site plan. Sarab
Summers Planner on this
modification.
Waiting for Site Plan Approval.
Counter conference regarding
requirements 1/31/03
Keating called wanting approval.
Keating called asking for SDC
charges. I gave them to him on
2/28/03. He wanted to pay them. I
said no, not until he has an approved
site plan and approved building
building permit.
Received final site plan 3/5/03.
Called and asked for building
permit copies. K said we had
enough.
Revised finat site plan
Plan Review comments were faxed
to engineer on 11-22-02.
. CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2002-01229
ISSUED: 09110/2003
APPLIED: 10/18/2002
EXPIRES: 03/1012004
VALUE: $ 66,855.00
.
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspeetion Line
Structural Review
12/13/2002
12/1312002
10 LLH
Structural Review
12/13/2002
WE JMP
Structural Review
03/0712003
03/07/2003
APP JMP
Structural Review
09/05/2003
09/05/2003
WE JMP
Structural Review
09/08/2003
09/08/2003
APP JMP
SUB Review
10/18/2002
10/18/2002
WE LLH
SUB Review
02/24/2003
02/17/2003
WE JF
SUB Review
02/28/2003
02/28/2003
APP JF
Steve Keating provided Fire
Department with new site plan
showing new fire hydrant location.
Please see fire department approved
plans for location.
Accepted Keatings resubmission on
items 1-4 but faxed him 12-10-02
that items 5--7 have not been
addressed satisfactorily.
Received final data from Public
Works end of the day. Left message
for Chuck Koehn that permit would
be assembled Wednesday, Marcb 12,
2003 and fees would be adjusted for
cbanges received end of the day.
Revised final site plan. Left
voicemail message for Chuck Koehn
on 9/5/2003 asking for contractor
and valuation data. Matt Warren at
Poage said that Wildish is the site
work contractor. He will fax site
work valuation data.
Received Matt's fax and entered
information.
Applicant stated at counter he
would be bringing in all required
energy forms. We will fax to SUB as
soon as they are received. Ih
Received Building Envelope code
form onty.
Pass energy code review
To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m.
will be made the same working day, inspections requested after 7:00 a.m. will be made the following work
day.
I !l'pnnv-prl In.nections I
I Site Inspection: To be made after excavation but prior to setting forms.
2 Erosion/Grading Inspection: After all erosion measures are in place.
3 Ufer Electrieal Ground: Install ground rod at footing and call for inspection in conjunction with footing and/or
foundation inspection.
4 Foundation: After forms are erected but prior to concrete placement.
5 Shear Wall Nailing: Before covering sheathing with finish materials.
6 Framing Inspection: Prior to cover and after all rough in inspeetions have been approved.
7 Wall Insulation: Prior to cover.
8 Ceiling Insulation: Prior to cover.
9 Roofing: Prior to installing any roof covering.
10 Drywall: Prior to taping.
11 Firewall: Located and constructed according to plans.
Paee4of5
-,
.
. CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2002-01229
ISSUED: 09/10/2003
APPLIED: 10/18/2002
EXPIRES: 03/1012004
VALUE: $ 66,855.00
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
12 Roof SheathinglNailing: Before covering sheathing with finish material.
13 Final Fire Department. After all requirements of the Fire Department have been met.
14 Final Bnilding: After all Conditions have been completed as required on Development Agreement.
15 Final Building: After all required inspections have been requested and approved and the building is complete.
16 Rough Grading: After gravel is in place but prior to placing concrete.
17 Final Paving: After paving is complete.
18 Underground Plumbing: Prior to filling the trench and including required testing.
19 Rough Plumbing: Prior to cover and ineluding required testing.
20 Water Line: Prior to filling trench and including required testing.
21 Sanitary Sewer Line: Prior to filling trench and including required testing.
22 Line to Septie Tank: Prior to filling trench and required testing.
23 Storm Sewer Line: Prior to filling trench.
24 Final Plumbing: When all plumbing work is complete.
25 Backflow Device: Prior to covering and provide a copy of the test report on site at the time of inspection.
26 Rough Mechanicat: Prior to Cover
27 Final Mechanical: When all mechanical work is complete.
28 Ufor Electrical Ground: Install ground rod at footing and call for inspection in conjuction with footing and/or
foundation inspection.
29 Rough Eleetric: Prior to Cover
30 Electric Service: Approval required prior to utility company energizing service.
31 Final Electric: When all electrical work is complete.
32 Sidewalk - Curbside: After forms are erected but prior to placement of concrete.
By signature, I state and agree, tbat I have carefully examined the completed application and do hereby certify tbat all
information hereon is true and correct, and I further eertify that any and all work performed shall be done In accordance with
the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and
that NO OCCUPANCY will be made of any structure without permission ofthe Community Services Division, Building Safety.
I further certify that only contractors and employees who are in complianee with ORS 701.005 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction4 .
Owner or contr:or~
~ II C/O-3
Date
Pa2e 5 of5
.'
225 Fifth Street
Springfield, Oregon 97477
541-726-3759 Phone
Job/Journal Number
COM2002-01229
C0M2002-01229
COM2002-01229
COM2002-01229
Payments:
Type of Payment
Check
Paid By
NOHAIR LLC
1Ii~ J,:;'~'.',";."'.',}.~""" '.. ...!.
" ..,..... i
.;. .,
,
> . ".,,: ... i
Receipt #: 1200200000000002093
Description
Stonn Drainage Impervious Area
SDC Sanitary/Stonn Admin
Paving
+ 10% Administrative Fee
Received By
jmp
Check Number
Batch Number Authorization Number
135
City of Springfield Official R-eceipt.
Development Services Department
Public Works Department
Date: 09/10/2003 10:23:39AM
Amount Paid
1,815.40
90.77
436.95
43.70
$2,386.82
Item Total:
How Received
In Person
Payment Total:
Amount Paid
$2,386.82
$2,386.82 '
.
.
. ATfACHMENT A .
CITY O~GFIELD SYSTEMS DEVELOPMENT CHARGE SHEET
JOURNAL OR JOB NUMBER C0M2002-01229
NAME OR COMPANY: FraokIin Stor.,e. LLC
LOCATION: 5170 FraokIin Blvd
MAP & TAX LOT NUMBER: M!'I'.18 03 03 03 40. Tax Lots 200. 400. & 500
DEVELOPMENT TYPE: Site Plan Modification
NEW DEVELOPED AREA (S.F.): 35.080.00
EXISTING DEVELOPED AREA (S.F,): 28.820,00
TOTAL IMPERVIOUS SURFACE (S,F,): 6.260
lTE:
lTE:
LOT SIZE (S.F.):
I
I STORM DRAINAGE
IMPERVIOUS SQ, IT.
$ 0,290 PER SF
6,260
x
TOTAL STORM DRAINAGE SDq $ 1,815.40
2_ SANITARY SEWF.R-CITY
A. REIMBURSEMENT COST:
NUMBER OF DFU's 0
B. IMPROVEMENT COST:
NUMBER OF DFU's 0
(SEE REVERSE SIDE)
x $ 22.64 PER DFU , $
x $ 17,21 PER DFU , $
TOTAL LOCAL W ASTEW A TER SDC:' $
3 TRANSPO~TATION
BWG AREA TGSF x TRIP RATE x COST PER ADT x NEW TRIP FACTOR
NEW
A. REIMBURSEMENT COST:
35.08 x 0 x $ 17.23 PER TRIP x 0 NTF 1$
B, IMPROVEMENT COST:
35.08 x 0 x $ 76.01 PER TRIP x 0 NTF 1$
EXISTING
A, REIMBURSEMENT COST:
.28.82 x 0 x $ 17,23 PER TRIP x 0 NTF 1$
B, IMPROVEMENT COST:
-28,82 x 0 x $ 76.01 PER TRIP x 0 NTF 1$
TOTAL TRANSPORTATION REIMBURSEMENT SDq $
TOTAL TRANSPORTATION IMPROVEMENT SDq $
TOTAL TRANSPORTATION SDC:, $
4. SANIT ARY SFWFR - MWMC
NEW:
A. REIMBURSEMENT COST:
NUMBER OF FEU's 35.08 x $0.00 PER FEU 1$
B. IMPROVEMENT COST:
NUMBER OF FEU's 35.08 x $0.00 PER FEU 1$
EXISTING:
A. REIMBURSEMENT COST:
NUMBER OF FEU's -28.82 x $0.00 PER FEU 1$
B. IMPROVEMENT COST:
NUMBER OF FEU's -28,82 x $0.00 PER FEU 1$
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
I
I
$
TOTAL MWMC REIMBURSEMENT FEE: $
TOTAL MWMC IMPROVEMENT FEE: $
MWMC ADMINISTRATIVE FEE: $
TOTALMWMCSDC:, $
SUBTOTAL (ADD ITEMS 1,2,3, &4)
, $
1,815.40 I
5r[c A.wolter 9/5/2003
sISOORmlM:jllllil:l'(jllllnklin Park LLC, 5170 Franklin.xQATE
TOTAL SDC CHARGES
1$
90.77
.
1078
1079
5. ADMINISTRATIVE FEES'
BASE CHARGE (SUBTOTAL ABOVE)
$ 1,815,40 x 5% $ 90,77
TOTAL TRANSPORTATION ADMINISTRATION FEE:I $
TOTAL SEWER ADMINISTRATION FEE:I $
1,906.17 ~
JULY 2001
,.11
$8,127.24 I
TOTAL STORM DRAINAGE SOC:' $ 4,063.62 10 O.
,
.
ATTACHMENT A
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE WORKSHEET
JOURNAL OR JOB NUMBER C0M2002.01229
NAME OR COMPANY: FRANKLIN PARK L.L.C.
LOCATION: 5180 FRANKLIN BLVD
MAP & TAX LOT NUMBER: 18-03.03-40 500
DEVELOPMENT TYPE: MINI WAREHOUSE
NEW DEVELOPED AREA (S,F,): 10.360,00
EXISTING DEVELOPED AREA (S.F,):
TOTAL IMPERVIOUS SURFACE (S.F,):
28.820.00
ITE:
lTE:
LOT SIZE (S,F,):
151
1 STORM ORATNAGF
Ur.lr.l~lhJNBASIN
IMPERVIOUS SQ, IT,
DISCOUNT 50%
28,820
x
$ 0.282 PER SF
2 SANI1I\Jl..Y SFWER-Crrv
A. REIMBURSEMENT COST:
NUMBER OF DFU's
B, IMPROVEMEr-rr COST:
NUMBER OF DFU's
(SEE REVERSE SIDE)
413.61
1.824.95
7 x $ 22.09 PER DFU , $ 154.63
7 x $ 16,79 PER DFU I $ 117.53
TOTAL LOCAL W ASTEW A TER SDC:' $ 272.16 ~
~ANSPORT~
BLOO AREA TGSF x TRIP RATE x COST PER ADT x NEW TRIP FACTOR
NEW
A. REIMBURSEMENT COST:
10.36 x 2.5 x $ 16,81 PER TRIP x 0,95
B, IMPROVEMENT COST:
10.36 x 2.5 x $ 74,17 PER TRIP x 0,95
NTF 1$
NTF 1$
413.61 I
1.824.95 I
TOTAL TRANSPORTATION REIMBURSEMENT SOC:' $
TOTAL TRANSPORTATION IMPROVEMENT SOC:' $
TOTAL TRANSPORTATION SDC:I $ 2.238.56 I
4 SANITARYSFWFR-MWMC
NEW:
A. REIMBURSEMENT COST:
NUMBER OF FEU's 10.36
B. IMPROVEMENT COST:
NUMBER OF FEU's 10.36
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
1$
591.151
x
$57.06 PER FEU
x
$5.97 PER FEU I $ 61.85 I
$
TOTAL MWMC REIMBURSEMENT FEE: $
TOTAL MWMC IMPROVEMENT FEE: $
MWMC ADMINISTRATIVE FEE: $
TOTALMWMCSDC:, $ 647.33 ~
(15.67)
591.15
61.85
10.00
SUBTOTAL (ADD ITEMS 1,2,3, & 4)
7,221.67 ,
, $
~ AnMI1\IT~T1U TIVE FEES-
BASE CHARGE (SUBTOTAL ABOVE)
$ 7,221.67 x 5% $ 361.08
TOTAL TRANSPORTATION ADMINISTRATION FEE:I $
TOTAL SEWER ADMINISTRATION FEE: $
pa"",elaJ. owV\.b efj
SOC COORDINATOR
1/3112003
DATE
TOTAL SDC CHARGES
COM2002-01229. FRANKLIN PARK LLC, 5170 FRANKLlN.x1s
.
m~1
238.13 107
,
, $
7.582.751
JULY 2001
.
,
DRAINAGE FIXTURE UNIT (DFU) CALCULATION TABLE
NUMBER OF NEW FIX11JRES x UNIT EQUIVALENT - DRAINAGE FIX11JRE UNITS
(NOTE: FOR REMODELS. CALCULATE ON!. Y THE NET ADDmONAL FIX11JRES)
FIXTURE TYPE
BATHTUB
DRINKING FOUNTAIN
FLOOR DRAIN
INTERCEPTORS FOR GREASElOIUSOLIDSIETC.
INTERCEPTORS FOR SAND/AUTO WASHlETC.
LAUNDRY TUB
CLOTHES WASHER/MOP SINK
CLOTHES WASHER - 3 OR MORE (EA)
MOBILE HOME PARK TRAP (I PER TRAILER)
RECEPTOR FOR REFRIGERA TOR/W A TER ST A TIONIETC.
RECEPTOR FOR COMMERCIAL SINKJ DISHWASHERlETC.
SHOWER. SINGLE STALL
SHOWER. GANG (NUMBER OF HEADS)
SINK: COMMERCIAL, RESIDENTIAL KITCHEN
SINK: COMMERCIAL BAR
SINK: WASH BASIN/IXJUBLE LAVATORY
SINK: SINGLE LAVATORYIRESIDENTIAL BAR
URINAL, STALUWALL
TOILET, PUBLIC INST ALLA nON
TOILET, PRIVATE INSTALLATION
MISCELLANEOUS:
FIXTURES
NEW OLD
NUMBER OF EDU'S'
UNIT
EQUNALENT
3
I
3
3
6
2
3
6
12
I
3
2
2
3
2
2
I
5
6
3
TOTAL DRAINAGE FIXTURE UNITS~
.EDU (Equivalent Dwelling Unit) is a discharRe eauivalent to a sinlrle familv dwellifll~ (20 DFU) set at 167 ~lIons per day
DRAINAGE
FIXTURE
UNITS
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
I
o
6
o
o
o
o
7
CREDIT CALCULATION TABLE: BASED ON ASSESSED VALUE
IF IMPROVEMENTS OCCURRED AFTER ANNEXATION DATE IN TABLE, CALCULATE CREDITS SEPARATELY
YEAR RATE PER $1,000 YEAR RATE PER $1,000
ANNEXED ASSESSED VALUE ANNEXED ASSESSED VALUE
1979 or before $ 4.92 1990 $ 2.06
1980 $ 4.83 1991 $ 1.64
1981 $ 4.77 1992 $ 1.45
1982 $ 4.64 1993 $ 1.31
1983 $ 4.47 1994 $ 1.13
1984 $ 4.30 1995 $ 0.97
1985 $ 4.09 1996 $ 0.82
1986 $ 3.78 1997 $ 0.63
1987 $ 3.41 1998 $ 0.41
1988 $ 2.98 1999 $ 0.22
1989 $ 2.52 2000 $ 0.04
CREDIT FOR PARCEL OR LAND ONLY IF APPLICABLE $ 0.22 X 71.241 $15.67
IMPROVEMENT (IF AFTER ANNEXATION DATE) X $0.00
CREDIT TOTAL $15.67
COM2002-01229. FRANKLIN PARK LLC, 5170 FRANKlIN,xI.
JULY 2001