HomeMy WebLinkAboutPermit Building 1996-2-20
SPRINGFIELD
~-
Page 1
COMMERCIAL/INDUSTRIAL PERMIT APPLICATION
CITY OF SPRINGFIELD Job Number: 951870A
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location of Proposed Work: 1045 GATEWAY LP
Assessors Map #: 17032220
Tax Lot #: 02300
OWner: RAYKO SPEC ADVERTISI
Address: 1045 GATEWAY LOOP
Phone #:
City/State/zip: SPRINGFIELD, OREGON 97477
Description Of Work: PHASE 2 REMODEL
REMODEL
Value:
18,000.00
Contractor
Const,
Contractor #
Expires
Phone
General: HOOVER 0054077
PO Box 7341 Eugene OR 974010000
Plumbing: CONTRACTORS PLU 0101624
1590 Bogart Lane Eugene OR 97401000
Mechanical: CRYSTAL CLEAN 0096878
197B Wallis Eugene OR 974020000
Electrical: EAGLE ELECTRIC 0027112
07/30/96
345-3319
08/15/96
343-0975
02/17/96
484-2286
04/02/97
343-3673
--- PLUMBING ---
No.
1
Fee
Charge
10.00
Single Fixture
TOTAL PERMIT
15,00
--- MECHANICAL ---
No.
Fee
Charge
15.00
10.00
ALTER DUCTWORK
Permit Issuance
TOTAL PERMIT
25,00
HANDICAP ACCESS: Y
- - OFFICE USE
QUAD AREA: 1CNW
LAND USE: 5300
Item
LEAN-TO ADDITION
REMODEL EXISTING
Square Feet
703
3640
x
$/Square Feet
Value
7,500.00
7,500.00
TOTAL VALUE OF PROJECT
15,000,00
BUILDING
Surcharge/Admin'
MECHANICAL
Surcharge/Admin
PLUMBING
Surcharge/Admin
110.50
8.85
25.00
1.20
15.00
1.20
Job Number: 951870A
Page 2
SUBTOTAL PERMITS
SYSTEMS DEVELOPMENT
161.75
865.97
TOTAL PERMIT FEES EXCLUDING ELECTRICAL
1;027,72
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are
made at the proper time. To request an inspection, call 726-3769
(recorder), state your City designated job number, job address, type of
inspection requested and when you will be ready for inspection. Requests
received before 7:00 a.m. will be made the same working day, requests made after
7:00 a.m will be made the following work day.
Special Inspections: In accordance with
a special inspector shall be employed by
construction of any following 11*" work.
shall be furnished to Building Safety.
Section 306 of the State Specialty Code
the Owner/Contractor during
A copy of the special testing reports
In addition to the inspections specified, the Building Official may make or
require other inspections of any construction work to ensure compliance with
the Building, City or Development Code.
FOOTING - After trenches are excavated.
FOUNDATION - After forms are erected but prior to concrete placement.
ROUGH PLUMBING - Prior to cover.
ROUGH MECHANICAL - Prior to cover.
ROUGH ELECTRICAL - Prior to cover.
FRAMING - Prior to cover.
DRYWALL - Prior to taping.
FIREWALL - Located and constructed according to plans.
FINAL PLUMBING - When all plumbing work is complete.
FINAL MECHANICAL - When all mechanical work is complete.
FINAL ELECTRICAL - When all electrical work is complete.
FINAL FIRE - When all Fire Department requirements have been met.
been met.
FINAL BUILDING - When all required inspections have been approved and
the building is complete.
- - - ADDITIONAL COMMENTS - - -
GREG FERSCHWEILER TO VERIFY EFFECT OF NEW FOOTING EXCAVATION ON EXISTING A
ARBORVITAE HEDGE ON NEIGHBORING PROPERTY TO THE SOUTH. IF HEDGE WILL NOT
SURVIVE, IT IS TO BE REPLACED AS PER THE ARCHITECTS NOTES.~
Plans Reviewed By: LORNE PLEGER
Building Site Reviewed By: LISA HOPPER
Date: 02/16/96
By signature, I state and agree, that I have carefully examined the completed
application and do hereby certify that all information hereon is true and
correct, and I further certify that any and all work performed shall be done
in accordance with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described herein, and that
NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety. I further certify that only
contractors and employees who are in compliance with ORS 701.055 will be
used on this project.
I further agree to ensure that all required inspections are requested at the
proper time. that project address is readable from the street, that the
permit card is located at the front of the property, and the approved set
of plans will remain on the site at all times during construction.
~^ ~I\I,)~OVlIJ
/"'i.:(nature
r1 -;:)t) -g ( D
Date
Job Number: 951870A
f\~,r VALIDATION ---
Receipt Number: rJ V:::T 30
Date Paid: . . I 0'h
Received By: l[)t'),
~
Page 3
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
(COMMERCIAL / INDUSTRIAL)
Name or Company: RAYKO SPEC ADVERTISI
Location: 1045 GATEWAY LP
Developement Type: C Building Size:
Job No.: 951870A
Lot Size:
1. STORM DRAINAGE
Impervious Sq Ft 1.0 X 564
0.210
Per Sq Ft =
X
2. SANITARY SEWER
Number Of PFUs
(see Page 2)
- CITY
1.0 X 0
43.43
Per PFU
X
3, TRANSPORTATION
Number Of Units
1.0 X .720 X
X Trip Rate
2.240 X
X
Cost Per Trip
437.93
$706.29
Transportation Total
4, SANITARY SEWER - MWMC
Number Of PFUs
o
X
X
Per PFU + MWMC Admin Fee
18.750
MWMC CREDIT If Applicable (see Page 2)
TOTAL - MWMC SDC
SUBTOTAL - (Add Items 1, 2, 3 & 4)
5. ADMINISTRATIVE FEES
Base Charge (Subtotal Above) X
0.50
TOTAL SDC
Reviewed By: TROY MCALLISTER
Date: 02/02/96
Page 1
Sq Ft
$118.44
$0.00
$706.29
$0.00
$0.00
f $0.00
$824.73
$41. 24
$865,97
SPRINGFIELD
~*'
,
Job Number: 951870A
.
~,
Page 2
FIXTURE UNIT CALCULATION TABLE
Fixture Type
Bathtub
Drinking Fountain
Floor Drain
Interceptors For Grease/Oil/Solids/Etc
Inteceptors For Sand/Auto Wash/Etc
Laundry Tub/Clotheswasher
Clotheswasher - 3 Or More
Receptor For Refrigerator/water Station/Etc
Receptor for Commercial Sink/Dishwasher/Etc
Shower, Single Stall
Shower, Gang
Sink, Bar, Commercial, Residential Kitchen
Urinal, Stall/Wall
Wash Basin/Lavatory, Single
Water Closet, Public Installation
Water Closet, Private
Miscellaneous
TOTAL FIXTURE UNITS =
Number of
New Fixture
Unit
Equivalent
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
2
1
2
3
6
2
6
1
3
2
2
2
1
6
4
CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured
after annexation date, credits are calculated separately.
(calculations are by $1000)
Year Annexed:
Credit For Parcel Or Land Only If Applicable:
Improvement (if after annexation date) :
o
X
0.00
Fixture
Units
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
0.00
0.00
$0,00
(If land value is multiplied by 1 then the parcel/land credit is not accurate.)
o
X
0.00
CREDIT TOTAL =