HomeMy WebLinkAboutPermit Building 1986-3-3 (2)
.. RESIDENTIAL'. SPRINGFIELD
. APPLICA./PERMIT
225 North 5th Street
SpringfieZd, Oregon 97477
BuiZding Division
726-3753
Job Location: S-~~~ J;?4/s U7: ~' #/7~
/
Ascescors Map # Tax Lot #
Subdivision: L~r/~~' 7l<.K 1,,, .Mp~/4/~ V/EJ,y
.'/1'ZE" Cjr,,, ~ ,., .
OlJner: r)'d~ Yt- /~:~;-h.
Address:J~~~S MA-/# ,,196 ::i!7B
- , '. - ,
City: <~~.~??
- 1 /
/~r;'" 2/f'y~2' )'de>~~ ffiPr~
w/T# /~ X Zt>' 4~~E #-h'P
I~')(~~' ~~r~'~~/"'51 ~Wh'//'P?
/tI1J/It'<~'~~~ ~'e:1._o
~...~~/. ~",,~€ -'IS/S...
0lIl[, , 4 ~O ' Value'
I
I
I I
IXI
Ne/J
Addition
Remodel
Nobile Home
Date of AppZication
Cont2'actors
I Genera l
"PZumbing ~WN'.e-~.
.
;,
, Electrical
,
d har." l
I, Mec .1..C'::
"
:i Constl"Uction Lender
~~
Phone: ?y /-/, 0/ ~
Zip: ~7 y;> e
Describe 11'01'1<:
Address
Receipt # (~(nO c::b
~~
Signed:
Date:
t.(l,
'J/-c3-5?"'=='
Lisc.#
Expires
Phone
It i.s the responsibility of the permit hoZder to see that aU inspections are made at the proper. time, that e,cch ~ess is readaoZe
from the street, and that the permit caI'd is Zocated at the front of the property.
*BuiZding Divicion approved plan shell 2'emain on th8 Building Sit$ at all times.
PROCEDURE FOR INSPECTION REQUEST:CALL 726-3769 (rccorder) state YOUI' City designated job nwr;ber, job adc.rcss, type of inspecticIl
requested ar-d /Jhen you /Jill be ready for inspection, Contractors or OWne~s name and phone numbcr. Requests received before 7:00 ~
~i ZZ be made the same dc.y, requests mc.de c.fte!' 7: 00 am 1Ji ZZ b$ made the next :xJrking day.
i Reoui~ed InSDecticns
'0 SITE INSPECTION: To be made after
j excavation, but prior tc set up of
;, fo'I711s.
. 0 ' UNDERSLAB p. LUf.fBING. ELECTRICAL &
, MECHANICAL: To 'be made before any
work is aovcred.
IZJ
FOOTING :1 FOUNDATION: To be made
after trenches are excavated and
forms aI'e erected, but prior to
pouring ccncret~.
UND8RGROUND PLUMBING,. SEliER. W.1TER,
DRAINAGE: To be made prior to fil-
Zir.g trenches.
~
[]
UNDERFLOOR PLUt,fBING & MECHANICAL:
To be made prior to installation of
12001' insulation or decking.
POST AND BEAM: To be made pnor to
installation of floor insklation or
decking .
ROUGH PLUMBING. ELECTRICAL & MECH-
ANICAL: No /Jork is to be covered
ur.til these inspections have beer.
made and approved.
FI.'?EPLACE: Prior to plaair.g fc.cing
materials and before framing inspec-
tior..
F~1ING: MUst be requected after
approval of rough plumbing, electri-
cal & mechanical. AU roofing
bracing & chimneys, etc. nr~st be
. completed. No /Jork is to be con-
" cec.led untiZ this inspection has
. been made and approved.
[J
[]
o
[]
Your City Desigr4ted Job Number Ic:
D INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulation ar~
.', required vapor ba.l'1'iers are in place
but before any lath, gypsum bOaI'd or
waZZ covering is appZied, and before
any insulation is concealed.
D
DRYWALL INSPECTION: To be made
after aU dIoY/JaU is in place,
but prior to c.ny taping.
R~(!:)tt:J 8?
DEf.iOLITIO!! OR !,fOVED BUILDIi.'GS
=:J Sani tary se'.Jer capped at p~opertil' Zir.e
=:J Septia tank p~~ed and filled with gra~el
-, Finc.l - I,'hen above ite:":1s aI'e ccnroleted
~ and /Jhen demolition is complete or stru~-
ture moved and premises cleaned up.
MobiZe Homes
~ Blocking and Set-up
~ Plumbing connections S&1Jer and /Jater
~ Electrical Connection - Blocking, set-u?
~'and plumbing connections nr~st be approved
, beforc requesting electrical inspectio~
~ Accessorii Building
~ Final - After porches,
~ etc. are completed.
skirting, decks,
o
MASONRY: Steel location, bond
beams, grouting or verticc.ls in
accordance IJith U.B.C. Section
2415.
D
All project conditions, cuch as the installation of street trees, c~~letion of the
required landscc.ping, etc., must be satisfied before the BUILDING FINAL call be rsquestsd.
=:J FINAL PLUMBING
~ FINAL MECHANICAL
=:J FINAL ELECTRICAL
~
o
FINAL BUILDING: The Final BuiZding Inspection must be requested after the Pinal Plumbi.ng
Electrical, and Mechanical Inspectionc have been made and approved.
D
WOODSTOVE: After instaZZation is
comp leted.
~ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUST/lENT TO BE /.t1DE AT NO COST TO CITY I Page 1 of 2
D
CURB & APPROACH APRON: After' foI'Tlls
are erected but prior to pouring
concrete.
D
SIDEWALK & DRIVEIvAY: For aZZ con-
crete paving /Jithin street right-
of-wc.y, to' bc made after all exca-
vating complete & form work & sub-
base material in place.
,
D
PENCE: ...'hen complete -- Provide'
gates or movable sections through
P.U.E.
o
JO B NO,
I Zone:
I Lot Sq.
Ftg.
% of lot Coverag~
1# of Stories
. Total Height
I
I Topography
I
lITEM
IMain
I Garaae ~ ~
I Carport I Z",
IAooessoru I
jt1,'S/t.€ #P~
SQ.FTG
S.D.C.
TOTAL VALUE
(vaLUe)
1.5 x
Building Permit
State SurchCII'ge
Total Char>ges
SOLAR ACCESS
Occupancy Gr~
LOT TYPE
Interior
Corner
Panhandle
Cul-de-sac
x
Value
1/~40
Is~-I
I I
I I 2Sj y,e>>
1~(>f8 I,
I /lS"t). 72 I *
~.SC>
2.62 I
'S2..~Z *
3'ZC6
J3~
lITEM I NO, I FEE CHARGE I
l..p.:...."':'t>v ~~"q7 r ~o.~I
Residential (1 bath) I I
I Sanitary Sewer II I I 2~. --I
I Water II I I 1'5. Clllal
IMDal(.E""~,~ I 64
PZwnbing Pem t I 70,,-0
State Surcr.arge I "2 .8~.
Total Charaes I ? ~.8e> I *
ITEM NO. FEE CHARGE I
Res. Sa. fta.
Naw/Extend Cirouits I
1~".!" '" ll'~ Seroioe I I
c'- erz..r. 1/-' - At ~ I
Eleotrioal Permit
State Suroharge
Total Charges
, ITEM
Furru:we ETU' S
I Exhaust Hood
I Vent Fan
I .
I Woodstove
I
Permit Issuanoe
Mechanioal Permit
State SuroharGe
Tot;aZ Charaes
, NO.' FEE
I 1'5. 4'Z> f
I ' r:~
I, ..
I ~.~
I /.4(>
I "'$1- ~~ *
CHARGE I,
I
I
I
I
I
I
-- ENCROACHMENT --
Se~~rity Deposit
I Storage
I Maintenanoe
,
Permit
Total Charqes
I Curbou~
I Sidewalk
! Fence
I Eleetrioa l Labe l
I Mobile Home ;:bp'~e7
I
I TOTAL AMOUNT DUE: *
;
I
I r
I I
I ( *
I I
I I
I I
I I
~ptl~~1
I I
I I
67:>- f!)7 *
REQ,-
L - co G~
Lot Faoes -
.
I Enerau Souroes
I Heat
Aooess. I
I
I
I I
II
TUDe
Type/Cor:.st:
Bedrooms:
P. L,
INorth
lEast
ISouth
IWest
Setbacks
House Carage
Water Heater
Range
Fireplaoe
Woodstove
Fees
Building Value &
Pe r m i t
-,
This permit is granted on the express condition that the said construction
shall, in all respeots, conform to the Ordinanoe adopted by the City of
Springfield, inaZuding the Zoning Ordinance, regulating the construction
and use of buildings, and may be suspended or revoked at any time upon vio-
lation of any provisions of said Ordinanoes.
, ,
Plan Cheok Fee: ~ .8'3
Date Paid: ""<51)0
IReceipt #: C3 lR (PO 5 V,
I Signed: ~~
Plumbing Permit
. ,
No person shall oonstruot, instal!, alter or change any new or e=isting
plumbing or drainage syste~ in whole or in part, unless such person is the
legal possessor of a valid plumber's lioense, except that a pe~son may do
plumbing work to property whioh is owned, leased or operated by the appli-
cant.
Electrica I Perm it
Where State Law requires tr~t the electrical work be done by an Eleatrioal
Contractor, the eleotrioal portion of this permit shall not.be valid until
the label has been signed by the Electrical Contraotor.
Mechanical Perm~t
,.
~. ,.~ -
, -
'I Exczllnner
.I_~
vate
I HAVE CAREFULLY EXAMINED the oompleted applioation for permit, and do
hereby certify that all info~ation hereon is true and oorrect, and I
further oertify that any ar~ all work performed shall be done in aoaor-
dance with the Ordin~nces of the City of Springfield, and th$ L~~s of the
State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY will be made of any structure without permission of the Building Di-
vision. I further oertify that only oontractors and e~plQyees who are in
compliance with ORS 701.055 will be used on this project
~
Signed
()
Date