HomeMy WebLinkAboutPermit Building 1987-10-30 (2)
/
-4
Rece-:.pt # /0 'ISJ...
.. RESI.TIAL..
APPLICATION/PERMIT
225 North 5th Street
SpringfieZd, Oregon 97477
BuiZding Division
726-3753 .
v
Job Location:
~(pc,o
ASGesGors Map #
SPRINGFIELD
()~
d
.:rI- 7 /
Tax Lot #
.M:.v-~ rA'/A/
- ~ . , -, ~ .
8't VL~ ~///€ cE5R7~':;:',
~~eMJ-,() /
Address: d r 0 IJJ t11J:h 1 T /-(
~fnVLfj) f)1I0C1~
~ d
Subdivision: / /Yr.5? ~ 7?LA'" ~
OWner:
City:
J
I "
NP.LJ
I Addi tion
I I Remodel
fYl Mobile Harne ,
,
,(o-{ q'":y1,
Date of AppZi=f;icn
Contractors
1// E W"
Phone:
c
tyJ
Zip:
Df};;;;J;- d//- rU /t) 1/
W- Vf
I /1/ ff1~
Value II /I {J V
Address
Sigr:ed: }v
Date: 10-30-[7
Lisc.#
Expires
Phone
General ~CLR. cI m fI~'j-
Plwnbing - d~-S~
I, Electrical S:--liA,...e - 1)./11. J
I Mechar.ical
I . Constl'Uction Lender
It is the responsibility of the pel'l'llit holder to see that all. inspections are made at the' proper time, that each ~ess is readabZe
from ths street, and that the permit card is located at the front of the property.
"Building Divi::ion approved plan s,hc.ll remain on thE Building sit::: at all times.
PROCEDURE FOR INSPECTION REQPEST:CALL 726-3769 (recorder) state your City designated job nwr.ber, job address, type of inspection
requested and when you will, be ready for inspection, Contractors 01' OWners name and phone nwnbcr. Requests received before 7:00 am
r.nZZ be made the same day, requests made after 7:00 am will be made the n=t :xJrking day.
, '. ",' , .' . c:; 1 () 7 q /
' 'YOUI' C'l-ty Des'l-gr.ated Job Nwnber Ia:
Reaui~ed TnSDp.ctions
D' SITE INSPECTION: To be made after
e.xcavation, but prior to set up of
, ,forms.
D ' UNDERSLAB PLUMBING. ELECTRICAL &
, MECHANICAL: To be made before any
. work is aovered.
,.." .
fl71 FOOTING & FOUND,1TION: To be made
I6J after trenches are e.xcavated and
" ,forms are erected, but prior to
pouring concret.::.
Ix I' UNDERGROUND PLUMBING~ SEWER. W.1TER,
,DRAINAGE: To be made prior to fiZ-
.Zir.g trenches.
0, UNDERFLOOR PLUMBING & MECHANICAL:
.. .' To be made prior to installation of
floor insulation or decking. .., , ,
D POST AND BEAM: To be made prior to
:; installation of floor insulation or
, decking.
D ROUGH PLUMBING. ELECTRICAL & MECH-
, ANICAL: No work is to be covered
,until these inspections have beer.
made and approved. '
I:~ FIREPLACE: Prior to placir.g facing
---.J materials and before framing inspec-
tion.
I'~ FRAMING: Must be requeated after
D approval of rough plwr.bing, electri-
,cal & mechanical. AlZ rOOfing
" bracing &' chimneys, etc. mU.st be
, .: completed. No work is to be con-
,.,,~.cealed until thia inspection has
~.been made and approved.
,.'.---- .
1::=1 FINAL PLUMBING
I =:J FINAL MECHANICAL
i
=:J FINAL ELECTRICAL
o
(2)
I INSULATION/VAPOR BARRIER INSPECTION:
---1 To be made after all insulation ar.d
, ' required vapor barriers are in place
,.: ',but before any lath, gypsum board or
waU covering is applied, and before
.. . "any insulation is concealed.
DEMOLITION OR ;'.JOVED BUILDINGS
~ Sanitary seuer aapped at p~op~r~~ line
~ Septia tank p~ed and fille~ with gra~el
O DRYWALL INSPECTION: To be made
after all drywall is in place,
but prior to any taping.
I Final - fl'hen above items are compZeted
---1 and when demolition is complete or stl'Ua-
ture moved and premises oleaned up.
O MASONRY: Steel location, bond
beams, grouting or verticals in
accordance with U.B.C. Section
2415.
D WOODSTOVE: After installation is
completed.
Mobile Hemes
.... ~ Blocking and Set-up
_ ><1 Plumbing connections -- scwer and water
'\:71 Electrical Connection,- Blocking, set-up
~ and plumbing connections nr~st be approved
before requesting electrical inspection
D
CURB & APPROACH APRON: After forms
are erected but prior to pouring
concrete.
D SIDEWALK & DRIVEWAY: For all con-
. crete paving within street right-
.of-wc:.y, to be made after all exca-
vating complete & form work & sub-
, base material in plaoe.
.xl Acoessol"d Building
'gfFinal - Aftar porches,
etc. are completed.
"
skirting, decks,
D
PENCE: r.'hen compl.::te Provide"
gates or movable sections through
P.U.E.
~
o
All project conditions, auch as the installation of street trees, c~~letion of the
required landscaping, etc., must be satisfied before the BUILDING FINAL can be rsquested.
FINAL BUILDING: The Final Building Inspection mUst be requeGted af~er the Final Plumbing
Electrical, and Mechanical Inspections have been made and approved.
~ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUST/rENT TO. BE ~MDE AT NO cost TO CITY Page 1 of 2
JOB No.~0 0 I)q (
I Zone: jYJ~/POZ/
Lot Sq. F'tg.
~ of 'lot Coverag~
# of Stories
Tota'l Height
Topography
SOL A R A ~ C E S S R E Q.-
Occupancy G~t:..'~ if,c.{JE .pm
LOT TYPE Lot Faces -
I
I ITEM SQ. FTG I X
IMair/~h"~;-~~)
I Gar~e '
I Carport ';;? 8$
I Accessorl/ .'-::S-2
I r~r/lYc;,.sf4cc~~S.
I TOTAL VAWE
I IvaiueJ
S.D.C. 1.5 x
Bui'lding Perrrrit
State SUI'charge
TotaZ Cha....ges
lITEM
I.FimtnW9S -#t?P/1~
Residentia'l (1 bath) I
II
II
I
NO.
Sanitary Sewer
Water
P'lumbing Perrr:i t
State SUI'cr.arge
Tota'l Charqes
ITEM
NO.
Res. Sa. fta.
I New/Extend Circuits
I ~"P'.""':J Service
I ~/:f ~p
III
III
EZeatrica'l Permit
, ' State SUI'aha:rge
Tota'l Charqes
lITEM
NO.
Furnace ETU' S
E:z:haust Hood
Vent Fan
I Woodstove
I
Permit Issuance
Meahanica'l Permit
State SUI'cha:rqe
TotaZ Charaes
-- ENCROACHMENT --
Security Deposit
Storage
Maintenance
Permi t
Tota'l Charges
FEE
FEE
FEE
Curbcut
I SidewaZk
I Fence
I E'lectricaZ Labe'l
I Mobi'le Home ~z;'~ W /ZJ:C
I ~-?~
I
TOTAL AMOUNT DUE: ~
I
" I HAVE CAREFULLY EXAMINED the comp'leted appLication for permit, and do
'I' hereby certify that, a'l'l info~ation hereon is true and correct. and I
further certify that any ar.d aZZ work performed shaZZ be done in accor-
{dance with the Ordinances of the city of Springfie'ld, and the L~~s of the
~ State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY wiZZ be made of any structUI'e without permission of the BuiZding Di-
vision. I further certify that on'ly contractors arKi e~pZoyees who are in
ca~pZiance with ORS 701.05S will be used on this project
Interior
Corner
Panhand'le
CuZ-de-sac
Va'lue
7~~""
I
I
/~.~l
&~~1.
I /'7a ~
/?.-~ I
. fGJZ!> I
/9... 3~ I ~
CHARGE
~5;:0C>
:4:::? f -e>
/'5: --- c..-
I
I ~~r--t)
I -:2-~
,11Y2.-sc:> I ~
CHARGE I
I
I
I /5. c:rt:>
liS: .-&>
I 50r ~
/.$61
5/~ SO I ~
CliARGE I,
I
I
I
I
I
I
I
I
I
I
I
tl 27~..5/
~;s-:~f
/.?S- r
t'age G
Type/Cor.8t:
.
L -CO G~
Setbacks
P.L. House Carage Access.
North
East
South
West
Bedrooms:
Enerqy Sources
H.eat
Water H.eater>
Range
Fir>epZace
Woodstove
TUDe
-- Fees
Building Val,ue & Permit
This permit is granted" on' the express condition that the' said construction
sha'l'l, in alZ respects, conform to the Ordinance adopted by the City of
Springfie'ld. incZuding the Zoning Ordinance. regu'lating the construction
and use of bui'ldings, and m~y be suspended or r>evoked at ~ny time upon vio-
Zation of any provisions of said Ordir~nces.
~
P'lan Check Fee: I./. =:?~
Date Paid: I b/3b /b'l
Receipt #: ,I 6 <.f C;;-L..-
I Signed: p ~
Plumbing Permit
No person sha'll construct, insta'lZ, aZter or change any new or existing
pZumbing or drainage system in who'le or in part, un'less such person is the
Zega'l possessor of a va'lid p'lumber's 'license, except that a person may do
pZumbing wor>k to proper>ty which is owned. 'leased or> oper>ated by the appZi-
cant.
...'
Electrical Permit
Where State LaLJ requires tr~t the eZectricaZ work be done by an E'lectricaZ
Contractor, the e'lectrica'l portion of this permit shaZ'l not be va 'lid unti'l
the Zabe'l has been signed by the EZectricaZ Contractor.
Mechanical Permit
~
a
p~ xaminer
~
/(:;?~2~~
uate
~