HomeMy WebLinkAboutPermit Building 1998-9-17
,
,
Page 1
COMMERCIAL/INDUSTRIAL PERMIT APPLICATION
CITY OF SPRINGFIELD Job Number: 980928
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
225 North Fifth Street
Springfield, OR 97477
Office, 726-3759
Inspection Line, 726-3769
Location of Proposed Work: 3365 GAMEFARM RD
Assessors Map #: 17032200
Tax Lot #, 00901
Owner: SPRINGFIELD UTILITY
Address, 250 A STREET
Phone #,
City/State/Zip: SPRINGFIELD, OREGON 97477
Description Of Work, SUBSTATION CONTROL HOUSE
NEW
Value,
0.00
PLUMBING
No.
Fee
Charge
25.00
Storm Sewer
ft.
TOTAL PERMIT
25.00
MECHANICAL
No.
3
Fee
Charge
9.00
6.00
10.00
Vent Fan/Single Duct
UNIT HEATER
Permit Issuance
NOTICE:
THIS PERMIT SHALL EXPIRE IF THE WORK
AUTHORIZED UNDER THIS PERMIT IS NOT
COMMENCED OR IS ABANDONED FOR
ANY 180 DAY PERIOD.
25.00
TOTAL PERMIT
HANDICAP ACCESS, N
OFFICE USE
QUAD AREA, 5CNW
LAND USE, 5300
Item
Sq. Ftg Main
Square Feet
796
x $/Square Feet Value
ATIENTION:Oregon law requirEWfoU'~ . 00
follow rules adopted by the Oregon Utility
Notification Center. Those rules al~';.,\~;:.oo
in OAR 952-001-001 0 through OAn"",,"
0090. You may obtain copies of the rules by
calling the center. (Note: the tele.pho~e
- . l. 't~I;n., f\!nhf'f"!:lItlon
numoer lor Ill" VI "llu" '" "T<T""""
Center is 1-800-332-2344).
TOTAL VALUE OF PROJECT
BUILDING
Surcharge/Admin
MECHANICAL
Surcharge/Admin
PLUMBING
Surcharge/Admin
PLAN REVIEW FEE
453.25
36.26
25.00
1. 20
25.00
2.00
294.61
SUBTOTAL PERMITS
837.32
TOTAL PERMIT FEES EXCLUDING ELECTRICAL
837.32
Job Number, 980928
Receipt Number:
Date Paid,
Amount Received:
Received By'
--- VALIDATION
-Sfl/(P ?
l(n(9f
'9- s 7. 32 /J
~?J~
Page 3
/
Job Number, 980928
Page 2
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are
made at the proper time. To request an inspection, call 726-3769
(recorder), state your City designated job number, job address, type of
inspection requested and when you will be ready for inspection. Requests
received before 7:00 a.m. will be made the same working day, requests made after
7,00 a.m will be made the following work day.
Special Inspections: In accordance with
a special inspector shall be employed by
construction of any following 11*11 work.
shall be furnished to Building Safety.
Section 306 of the State Specialty Code
the Owner/Contractor during
A copy of the special testing reports
In addition to the inspections specified, the Building Official may make or
require other inspections of any construction work to ensure compliance with
the Building, City or Development Code.
FOOTING - After trenches are excavated.
SLAB - To be made after all ins lab building service equipment, conduit
piping, and other equipment items are in place but prior to concrete
STORM SEWER LINE - Prior to filling trench.
MASONRY - Steel location, bond beams grouting or verticals in
accordance withUBC 2415.
STRUCTURAL MASONRY - To be done during constr by State Certified
Special Inspector. Provide results to City Building Inspector.
ROUGH MECHANICAL - Prior to cover.
ROUGH ELECTRICAL - Prior to cover.
ELECTRICAL SERVICE - Must be approved to obtain permanent power.
FRAMING - Prior to cover.
INSULATION - Floor; prior to decking wall/Ceiling; Prior to cover
FINAL MECHANICAL - When all mechanical work is complete.
FINAL ELECTRICAL - When all electrical work is complete.
FINAL FIRE - When all Fire Department requirements have been met.
been met.
FINAL BUILDING - When all required inspections have been approved and
the building is complete.
--- ADDITIONAL COMMENTS ---
DRC 96-06-118, PLANNER-LYDIA NEILL
Plans Reviewed By, LORNE PLEGER
Building Site Reviewed By, LISA HOPPER
Date: 09/10/98
By signature, I state and agree, that I have carefully examined the completed
application and do hereby certify that all information hereon is true and
correct, and I further certify that any and all work performed shall be done
in accordance with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described herein, and that
NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety. I further certify that only
contractors and employees who are in compliance with ORS 701.055 will be
used on this project.
I further agree to ensure that all required inspections are requested at the
proper time, that project address is readable from the street, that the
permit card is located at the front of the property, and the approved set
of plans will remain on the site at all times during construction.
~\J,,~
Signature LJT-
cr//7/C}fs
Date I (
r
,
JOURNAL OR JOB NO. ~~y~~
. ATTACHMENT A . .
CITY OF SPRINGFIELD SYSTEMS DEVELO~ENT CHARGE
WORKSHEET
..,_r- :.
NAME OR COMPANY:
5{j Ii
LOCATION: 3ri'r:..'- (;1'1-.1_ h./.H ~
DEVELOPMENT TYPE: ~AI-,0/ A.ou!d. F:. /Ju2~ ~6~,f/o~
}, .JJ'. .if"
BUILDING SIZE: :17 -Y ,:Jj-=-. h>t:':---, OT SIZE SQ. Ft.
1. STORM DRAINAGE - ,4r c-,f-~d /'!U-.t_ - /Vt (<~N"e-....f,,;,.., ~ c"'fYY;?/A,
IMPERVIOUS SQ. FT.
...--
X $0.227 PER SQ. FT. $ ~
2. SANITARY SEWER-CITY
NO. OF PFU'S ~
(See Reverse Side)
X $47.14 PER PFU
$ ~
3. TRANSPORTATION.
NO OF UNITS X TRIP RATE X COST PER TRIP
X
X $475.32
$ -r9-
X
X $475.32
$
4. SANITARY SEWER-MWMC
A. REIMBURSEMENT COST:
NO. OF FEU'S
X
PER FEU
$ -C3-
B. IMPROVEMENT COST:
NO. OF FEU'S
X
PER FEU
$ -G=--
MWMC CREDIT IF.APPLICABLE (SEE REVERSE)
MWMC ADMINISTRATIVE FEE
<$-&-- >
$ 10.00
TOTAL -MWMC SDC $ '---
~
SUBTOTAL (ADD ITEMS 1,2,3 & 4) $ ~
5. ADMINISTRATIVE FEES:
BASE CHARGE (SUBTOTAL ABOVE) X .05 $
k tf.y........ Date: ~/~Ag
// $'1ly:C'oordinator TOTAL SDC $ &
AITACH'A.WPD
I
FIXTURE UNIT CALCULA TION TABLE: Number of New Fix_s' X Unit Equivalent = Fixture yrfits ','
(NOTE: For remodels, calculate onee NET additional fixtures) .
NUMBER OF UNIT FIXTURE
FIXTURE TYPE NEW FIXTURES EQUIVALENT UNITS
Bathtub...................................................................... .
Orinking Fountain.....................................................
Floor Drain.........................:.......... ............................
Interceptors For Grease/Oil/Solids/Etc.... .............
Interceptors For Sand/Auto Wash/Etc..................
Laundry Tub/Clotheswasher..:................................
Clotheswasher - 3 Or More.....................................
Mobile Home Park Trap (1 Per Trailer)..................
Receptor For Refrigerator/Water Station/Etc........
Receptor For Commerciai Sink/Dishwasher/Etc..
Shower, Single Stall..............:.................... .:............
Shower, Gang,................................... ......................
Sink: Bar, Commercial. Residential Kitchen........................
Urinal, Stall/Wall...,..,................................................
Wash Basin/Lavatory, Single..................................
Toilet. Public Installation........................................
Toilet, Private.......................................................
Miscellaneous:
2
1
2
3
6
2
6
6
1
3
2
1/Head
2
2
1
6
4
TOTAL FIXTURE UNITS
=
CREDIT CALCULATION TABLE:
calculate credits separates.
r- Year
I Annexed
II
I
Based on assessed value. If improvements occurred after annexation date in table,
Rate per $1.000
Assessed Value
'iI
I
i
Rate per $1,000
Assessed Value
Year
Annexed
l
1979 or before
1980
1981
1982
1983
.1984
1985
1986
1987
1988
$4.27
4.18
4.12
3.99
3.83
3.68
3.48
3.18
2.82
2.42
1989
1990
1991
1992
1993
1994
1995
1996
1997
Credit for Parcel or Land Only If Applicable
X $ =
(Rate X Assessed Value)
X $ =
IRate X Assessed Value)
CREDIT TOTAL = $
Improvement (if after annexation date)
RUNOFF COEFFICIENTS FOR STORM DRAINAGE
(For Estimating Purposes Only)
Residential........................... 0.4
Commerical......................... 0.9
Industrial............................ 05
Governmental...................... 0.5
FIXUNIT.WPD
IMPERVIOUS AREA = TOTAL LOT SIZE X RUNOFF COEFFICIENT
$1.98
1,55
1.15
0.96
0.83
0.67
0.52
0.38
0,21
'I'
,
...... ~
VOGENEY Ken
.
.
From:
Sent:
To:
Cc:
Subject:
JACOBSON Alexander J
Thursday, August 06, 19987:36 AM
'VOGENEY Ken'
MEDUNA Ray; L1NAHAN Bob
RE: SUB's Gateway Substation Control House, Building Permit NO.9 80928
Ken:
This project belongs to Tom Weller, but he is on vacation for a couple
weeks so I will tell you what I know. .
In conjunction with our transformer's oii containment system, we have
installed 150 foot sections of slotted 6" PVC along the east and west
fencelines of the substation. The yard is crowned with a two percent
slope running to the east and west. These slotted PVC's act as
industrial sized french drains, which work because of the soil profile.
At 2 foot depth. the site has medium dense sandy silt, and at 5 feet, a
cobbly, sandy gravel layer.
We have installed the drains at a depth penetrating two feet into the
cobbly/gravei layer. We intend to utiiize these drains to continue to
capture the runoff from the control house roofs tributary area.
This system proved more than adequate for the heaviest storm rains this
last winter, The site never exhibited standing water and maintained its
bearing capacity at all times, reinforcing my belief that the site is'
very well drained.
Please call me direct at 744-3717 or 954-2465 (cell) with any questions.
> -m-Original Message-----
> From: VOGENEY Ken [SMTP:kvogeney@cLspringfield.or.us]
> Sent: Wednesday, August 05, 1998 11:45 PM
> To JACOBSON Alexander J (SUB)
> Cc: PLEGER Lome W
> Subject: SUB's Gateway Substation Control House, Building Permit
> No. 980928
>
> AJ:
>
> I was looking through your submittal for the new Control House at the
> Gateway Substation, and I didn't see any information about site storm
> drainage except a reference in the specifications to provide splash
> blocks.
>
> Does this site have a developed drainage system? If not, where does
> the
> water go?
>
> I'll be out of the office until Monday, 8/10. so maybe you could call
> me
> then and we can discuss the drainage in more detail.
>
> Thanks,
> Ken Vogeney
> Springfield Public Works