HomeMy WebLinkAboutPermit Building 1987-8-21
,>ol___.....I\:'W,..:'~~\~~~~......--
1lII-... .~.
't -. ~....o:go.1-V
-- -y-
-_."~'-~- ..........
~-
...".~.-.
.. RESID~TIAL"
APPLICATION/PERMIT
225 North 5th Street
SpringfieZd~ Oregon 97477
BuiZding, Division
726-3753 '
..
:-
Job Location: J!,.;lJ'O
,
~ ~:'~
,..--J
Asoes80rs Map 1/
Subdivision:
.
Owner: ~
t7 .;,
Address: a !J-.:r~
~t74 /
t?'.2)c<' ~ ~ <'I
, ~
/J~)
City:
~: -"-"
/~
"1m,)
Addi tion
Remodel
General
PZwnbing
Electrical
"h1~.d, ~//
Describe Ivor7<:,... .4_ ~./.
r~~ /~.8t-..;;t
~<<"'4f"'t? ~ ~
~/.~~
h ~-, V )?/~
Value c-; . ~ )
SPRINGFJ~I n
- ,
,\/
Tax Lot 1/
Phone:
Zip: ?74~
Receipt #-
/0IJ&>7
~Oll
, ,\ I
() ((\-;!
Address
~n~d,.~-
;?/?I.f >>..JtF
r
"~ed:
Date:
Le-
<1(-- .;U -~ "7
Lisc.1I
.(. "7'c-q
....... - "",-
Exoires
Phone
c?# t)~c(
;>?r-j/ ~ ~8'
Mechanical.
Conatruction Lender
It is the responsibiLity of the permit holder to see that aH irwpectiona are made at the propel' time~ that each ~ess is reaaaiiZe
f1'011l the street. and that the permit card is 'Located at the front of the property.
*Bui!ding Divicion. approved pLan shaH remain on thE BuiZding Sit$ at aU times.
PROCEDURE FOR INSPECTION REQUEST:CALL 726-3769 (recordeI') state your City designated job nwnber. job add:N!SS~ type of inspection
requested and when you will be ready for inspection~ Contractors or Owners name and phone nwnber. Requests received befoI'e 7:00 CQ:l
1J.>iZZ be made the same day. I'equests made afteI' 7:00 am wiZZ be made the n(;Xt :')()I'king day.
Reauiped Insvecticns
D SITE INSPECTION: To be made afteI'
excavation~ but prior to set up of
.foI'TTls.
O UNDERSLAB PLUMBING. ELECTRICAL &
: MECHANICAl,: To be made befoI'e any
work is covered.
,.
o
FOOTING & FOUNDATION: To be made
afteI' trenches are excavated and
foI'TTls are erected. but prioI' to
pouring concrete.
D. .' UNDERGROUND PLUMBING~ SEWER. WATER.
DRAINAGE: To be made prior to fil-
.U.,..g trenches.
0, UNDERFLOOR PLUMBING & MECHANICAL:
, To be made pI'ioI' to installation of
/ZOOI' insuLation OI' decking.
O POST AND BEAM: To be made prioI' to
installation of f100I' insuLation 01'
decking .
D ROUGH PLUMBING. ELECTRICAL & MECH-
ANICAL: No work is to be covered
.until these inspections have been
made and approved.
D FIREPLACE: PriOI' to pZaci.,..g facing
materials and before framing inspec-
. tior:. I J
~NC: Mdbt be requested after
L.:1 appI'oval of rough pZwnbing, eZectri-
caZ & mechanical. Au.. rOOfing
bracing & chimncys~ etc. rrrvl.st be
:' compZeted. No work is to be con-
,~,,"',.cealed until this inspection has
~be~n made and approved.
.-',~'-
.
YOUl' City Desigr.ated Job NwnbeI' Is:
D INSULATION/VAPOR BARRIER INSPECTION:
To be made after aU insula.tion CP.'.d
'. I'equired vapor barriers are in pLace
'. but before any Lath. gypswn board 01'
wall coveI'ing is applied, and before
any insuLation is conoealed.
I DRYWALL INSPECTION: To be made
-.J afteI' aU dr>ywaZZ is in pZace.
but prior to any taping.
0, MASONRY: Steel location~ bond
beams, grouting 01' verticaZs in
accordance with U.B.C. Section
2415.
D WOODSTOVE: AfteI' instaUation is
ccmpleted. .
D CURB & APPROACH APRON: After foms
are erected but prior to pouring
concrete.
D SIDEWALK & DRIVEWAY: For aU con-
crete paving within street right-
pf-way~ to be made afteI' aU exca-
vating complete & fom work & sub-
. base material in pZace.
D PENCE: When complete -- Provide.
gates 01' movable sections through
P.U.E. .
o
~7()~JO
DEMOLITION OR gOVED BUILDINGS
~ Sani tary sC'..Jer aapped ::xt p:r:.opert":i Ur:e
~ SeptiC! tank pumped and filZed with gpavel
--, Final - I,'hen above items are compLeted
---l and when demolitior: is complete OI' strua-
ture moved and premises aleaned up.
I MobiZe Hemes
::J Blocking and Set-up
::J PZwnbing connections s~er and water
~ EZectricaZ Connection - Blocking~ set-up
~ and plwnbing connections m'vl.st be appI'oved
before requesting electricaZ inspection
:=J Acaesso1"d Building
.... ..
--, FinaZ - After porches. skiI'ting. decks.
~ etc. are completed.
D
"'
D FINAL PLUMBING
D FINAL MECHANICAL
\~
AZZ project conditions. such as the installation of street trees. c~~Zetion of the
required Landscapir:g~ etc. ~ must be satisfied befoI'e the BUILDING FINAL can be I'equested.
~AL BUILDING: The FinaZ Building Inspection must be requested afteI' the Final Plwnbing
\Q Electrical, and Mechanical Inspections have been made and approved.
8-flNAL ELECTRICAL
\l~
o
~ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE. ADJUST!fENT TO BE J.L1DE AT NO COST TO CITY I'p::xge 1 of 2
SOLAR_CESS
Occupancu Group:
JO B NO.
Zone:
Lot Sq. Ft{;.
S of lot Coverag~
# of Stories
Total Height
Topography
ITEM
SQ.FTG
Main
Garaae
Carport
Accessoru
TOTAE VAWE
S.D.C. IvatueJ
1.5 :z:
Building Permi t
State Surchcnoge
Total Cha.~ges
lITEM NO. FEE
I Fixtures
I Residential (1 bath)
I Sanitary SeLJer
I Water
I
Plumbing Perrr:i t
State Surcr.arge
Total Charaes
ITEM NO. FEE
Res. Sa. rta.
New/E:z:tend Circuits
Temporary Service
Eleatrical Permit
State SurahaI'ge
Total Charqes
ITEM
NO.
FEE
Furnace ETU'S
&haust Hood I
I Vent Fan I I
I Woodstove I I
I I I
Permit'Issuanca
Meahanical Permit
State Surcharae
Total C'haraes
-- ENCROACHMENT --
Se~~rit~ Deposit
Storage
I Maintenanae
I Permi t
Total Charges
I CUrbcut
I Sidewalk
I Penae
I Electrical [,abel
Mobile Home
TOTAL AMOUNT DUE: ~
, ~
I
I
(' z:. 2. ty.J I
I .
I
I7-L~
I \ ,\2 '-\...-\
I ~ 3 . (p 2-1 ~
I
LOTTYFE
Interior
Corner
Panhandle
Cul-de-sac
x
Value
I
I
I
I
)") D V
, ...")<? .6-6
I. q3
t./-l) .4-,-?
CHARGE
I
I
I
I
CHARGE
CliARGE
I
I
I
I
I
I
I
I
lotf~
r-age z
REQ.-'
L-COG~
'. e
Type/Cor.st: -
., I
Bedrooms:
I Lot Faces
I EnerC1u Sources
I .~eat
I Water Heater
I I Range
I Fireplace
I Woodstove
I
Tl/r:Je
P.E.
North
.East
South
West
Setbacks
House' Gcnoaqe
Access.
-- Faes
Building Value & Permit
This permit is granted on the e:z:press condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning Ordinance, regulating the construction
and use of buildings, and may be suspended or revoked at cny time upon vio-
lation of any provisions of said Ordinances.
~
p\j\Y'
-2
Plan Check Fee:
Date Paid:
Receipt II:
I Signed:
~
Plumbing Permit
No person shall construct, instal?, aUer or change any new or e::isting
plumbing or drainage system in whole or in pcnot, unless such person is the
legal possessor of a valid plumber's license, e:z:cept that a pel"son may do
plumbing work to property which is owned, leased or operated by the appZi-
cant.
.,
,
,.
Electrica I
Permit
Where State EOJJ requires t;..at the electrical work be <kme by an Eleatrical
Contractor, the electrical portion of this permit shall not be valid. until
the Zabel has b~en signed by the Electrical Contractor.
Mechanical
Permit
~
Plan E:z:aminer
I
r I HAVE CAREFULEY EXAMINED the completed application for permit, and do
I hereby certify that aZZ infor'111ation hereon is true and correct, and I
' further certify that any ar.d all work perfo!':7led shall be done in accor-
f dance with the Ordinances of the City of Springfield, and th~ ~s of the
~ State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY wiZZ be made of any structure without permission of the Building Vi-
I vision. I further certify that only contractors ar.d,e~loyees who cnoe in
I ca~pliance with ORS 701.055 will be used on this project
uar;e
"
??~;)fr-,? 7
Date
~
~