HomeMy WebLinkAboutPermit Building 1989-7-25
.. RESIDaNTIAL..
- APPLICA1./PERMIT
225 North 5th Street
SpringfieZd, Oregon 97477
BuiZding Division
726-3753
SPRINGFIELD
lllD r.AA..R~ WC<.t_~.
J I O~:J Iv, '~~ Os<-:yy~ rU #
\f'(\QOo~ ~ (' ~b.AW~lvv .
. ) I \ 0 ( J. ~~ \ A9l'Aot_ Phone: -r~t".- ql) J
~. OQ OZiP: OlL/7j
.-
Job Location:
Assessors Map #
Subdivision:
Ol.mer:
Address:
Ci ty :
"=
Addi tion
Remodel
Mobile Home
Date of Application
Contractors
, General
! Plumbing
i Hechanical
EJ,ectrical
Super~i~ing Electr~cian
Describe '>'01'7<:
.
Receipt #
J LJ L,f L.,--;
.~ CJ;v-Y'<' ~
Value
~
~/
C}y")-
I \ I \
Address
'. -Lisc. II
Bldrs Board Reg.
Ex6ir€s Fnnnp
Signed:
Date:
~
J -::l <;-~C1
It is the responsibility of the permit ho~er to see that all inspections are made at the propel' time, that each ~ess is readabZe
f1'OTTl the street, and that the permit card is located at the front of the property.
*Bui!ding Divicion approved plan shall remain on the Building Sit3 at all times.
.
PROCEDURE FOR INSPECTION RE'QPEST:CALL 726-3769 (recorder) state your City designated job nwnber, job a.dd:r>ess, type of inspectien
requested and when you will be ready for inspection, Contractors 01' Ol.mers nwme and phone number. Requests received before 7:00 am
1J.'ill be made the same day, requests made after 7:00 am wiZZ be made the next :JOrking day.
Reauiped InsDecticns
O SITE INSPECTION: To be made after
excavation, but prior to set up of
. forms.
O UNDERSLAB PLUMBING. ELECTRICAL &
: MECHANICAL: To be made before any
work is aovered.
O FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring concrete.
UNDERGROUND PLUMBING. SEWER. WATER,
DRAINAGE: To be made prior to fil-
.Zir.g trenches.
o
o
UNDERFLOOR PLUMBING & MECH.ANICAL:
To be made prior to instal ration of
f100r insulation or decking.
POST AND BEAM: To be made prior to
installation of f100r insuration or
decking .
ROUGH PLUMBING. ELECTRICAL & MECH-
ANICAL: No work is to be covered
,untiL these inspections have beer.
made and approved. -
FIREPLACE: Prior to placir.g facing
materials and before framing inspec-
tion.
D FRAMING: Must be requested after
approvaL of rough plwnbing, electri-
.cal & mechanical. All roofing
bracing & chimneys, eta. nr~st be
:" comp Leted. No work is to be con-
.~ cealed untit this inspection has
'be~n made and approved.
o
D
D
Your City Desigr.ated Job Nwnber Is:
D INSULATION/VAPOR BARRIER INSPECTION:
To be made after aLL insul~tiQn ~~
. .' _ - required vapor barriers are in place
.. ,(. '. but before any lath, gypswn board or
!JaZZ covering is applied, and before
'. an.y insulation is concealed.
I DRYWALL INSPECTION: To be made
--.J after all drywall is in prace,
but prior to any taping.
O MASONRY: Steel location, bond
beams, grouting or verticals in
accordance with U. B. C. Section
2415.
D WOODSTOVE: After installation is
eompleted.
D
CURB & APPROACH APRON: After forms
are created but prior to pouring
co~rete.
QO)()jLj 111
DEMOLITION OR MOVED BUILDINGS
:J Sani tary Se'Jel' Clapped ~t px:.opert':i Une
~ Septic tank v~ed and fiZled with graveZ
I Final - [{hen above items are completed
--.J and when demolition is complete or struc-
ture moved and premises c:leaned up.
Mobile Hemes
~ Blocking and Set-up
~ Plumbing connections s~er and Water
~ Electrical Connection - Blocking, set-up
--.J and plwnbing connections nr..st be approved
. before requesting elec;rical inspec;ion
~ Acc:essoI"d Building
.'.. .,
I Pina l - After porches,
---3 etc. are completed.
skirting, decks,
D
SIDEWALK & DRIVEWAY: For all con-
crete paving within street right-
of-way, to be made after aZZ exca-
vating complete & form work & sub-
. base material in plac:e.
D
All project conditions, such as the installation of street trees, c~~letion of the
required landscaping, etc., must be satisfied before the BUILDING FINAL can be requested.
o FINAL PLUMBING
/ ').p)
~ FINAf MECHANICAL
o FINAL ELECTRICAL
o
o
FINAL BUILDING: The Final Building Inspection must be requested after the Final numbing
Electrical, and Mechanical Inspections have been made and approved.
D FENCE: fI'hen complete -- Provide-
gates or movable sections through
P.U.E. .
o
*ALL MANHOLES AND CLEANOUTS lfUST BE ACCESSIBLE, ADJUST!fENT TO BE MADE /!T NO COST TO CITY I P~ge 1 of 2
JOB NO.
Zone:
Lot Sq. Ftg.
S of lot Coverage
# of Stories
Total Height
Topography
ITEM
SQ.FTG
Main
Ca:raae
Carport
Accessory
TOTAT:, VAWE
S.D.C.
1.5 x
(va:~ue)
Building PeI'mit
State SUI'charge
Total Charges
lITEM
I Fixtures
I Residential (1 bath)
I Sanitary Sewer
Water
Plwnbing Perrr:it
State SUI'cr.arge
Total Charoes
ITEM
Res. Sa. fto.
I New/Extend Circuits
I Temporary Service
Electrical Permit
State SUI'charqe
Total Charges
lITEM
Furnace ETU' S
E:I:haust Hood
I Vent Fan
I Woodstove
r~~
Perna Issuance
Mechanical Permit
State SUI'charae
To"tal Charoes
I -- ENCROACHMENT --
I SeC"..lritt{ Deposit
I Storage
I Maintenanae
I Permit
I Total Charqcs
I Curbcu:;
I Sidewa lk
Fen:::e
Electrical Label
Mobile Home
TOTAT:, AMOUNT DUE: *
SOL A RAe C E S S R E Q.-
Occupancy' Gr~
LOT TYPE
NO.
FEE
NO.
FEE
NO.
FEE
Interior
Corner
Panhandle
Cul-de-sac
x
Value
I. '
CHARGE
CHARGE
1
CHARGE
rage G
L-COG~
I Lot Faces -
I
I P.L.
'North
East
South
West
~ Bedrooms:
- I Enerqy Sources
I ,Iieat
Access. I Water Heater
I Range
I Fireplace
I Woodstove
I
T;.roe
Type/Const:
Setbacks
House Carage
Fees
Building Value & Permit
This permit is granted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, incZuding the Zoning Ordinance, regulating the construction .
and use of buildings, and may be suspended or I'evoked at cny time upon vio-
Lation of any provisions of said Ordinances.
*
I
I. *
Plan Check Fee:
Date Paid:
IRecdpt #:
I Signed:
Plumbing Permit
No person shall construct, install, alter or change any new 01' e=isting
plumbing or drainage system in whole or in part, unless such person is the
legal possessor of a valid plumber's license, except that a person may do
plumbing work to property which is owned, leased or operated by the appli-
cant.
I
I *
../
Electrical Permit
Where State Law requires tr~t the electrical work be done by an Electrical
Contractor, the electrical portion of this permit shall not be valid until
the Zabel has been signed by the Electrical Contractor.
I
I *
Meche nical Permit
I
I
Is.cO I
J_DlP
.-J~
I~/" *
d )~.J)
PZan E:rarm..ner
uate
I HAVE CAREFULLY EXAMINED the completed application for permit, and do
hereby certify that all information hereon is true and correct, and I
further certify that any ar.d all work performed shall be done in accor-
dance with the Ordinances of the City of Springfield, and the ~s of the
* State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY will be made of any structUI'e without permission of the Building Di-
vision. I further certify that only contractors ar.d employees who are in
compliance with ORS 701.055 will be used on this project
~gned
7h.J( 1
Date
*