Loading...
HomeMy WebLinkAboutPermit Building 2003-6-24 Status Issued . . CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: COM2003-00419 ISSUED: 06/24/2003 APPLIED: OS/28/2003 EXPIRES: 12/24/2003 VALUE: $ 133,770.00 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line SITE ADDRESS: 4256 Daisy St 4258 ASSESSOR'S PARCEL NO.: 1702323300601 Springfield TYPE OF WORK: Duplex TYPE OF USE: New Residential PROJECT DESCRIPTION: Duplex Owner: GYANENDRA PRASAD Address: 3274 LAKESIDE DRIVE EUGENE OR 97401 Contractor Type General Electrical Mechanical Owner Plumbing 'Phone Number: 541-681-9538 I CONTRACTOR INFORMATION. Contractor DUANE A KNIGHTS BATEMAN ELECTRIC INC MARSHALLS INC GY ANENDRA PRASAD SURRETTS PLUMBING INC License 12112 151911 25790 Expiration Date 07/10/2003 06/21/2004 12/23/2003 Phone 541-726-2960 541-995-4757 541-747-7445 541-681-9538 541-741-3553 121687 01/14/2004 BUILDING INFORMATION. # of Buildings: 2 # of Stories: 1 Lot Size: Primary Occupancy Group: R-3 Height of St~udure. 16.50 Sq Ft 1st Floor: . . '\' Secondary Occupancy Group: U-l Type of Heat: \ :' ..; Wall Heat Sq Ft 2nd Floor: . ~ , . - " .. Primary Construction Type VN Wa~r.':~ype:" " ' ' Electric Sq Ft Basement: Secondary Construction Type: \,Rahge..Type:, .' , ".' Electric Sq Ft Garage/Carport ..,/" ;,; ~ - # of Bedrooms: 4 . ,\ ,'~,-; , ,. Path 1 Sq Ft Other: ,J-...r Energy,Path: . ' )'--.-" ,." ~)'j ". .'. ' , , . Impervious Surface Area: . .\.1' . , ,.~ /,>0 'p'" . .,,'J .. , . .:. .'\~;.~ ,..\. . ',J. ." . ~ . ,. . " . SETBACKS Frontyard Setback: Side 1 Setback: Side 2 Setback: Rearyard Setback: Solar Setbacks: Street Improvements: Storm Sewer Available: Special Instruction: Notes: 1,666 484 ',.~~'.J...I DEVELOPMENT INF0RMATION . ,,\ ,.. , ,,,',.' REQUIRED PARKING \,""", )~.. 1 I, .,f ~ . . , ,,'18.00 , \:.. ....,.'Overlay Dist: Total: 2 , ."... . .".' -. . '. ,... 1~.QO . " '~' .. # Str,eet Trees Rqd: 13 ~icapped: .:60.00, .' .' < ~: : . Paved Drive Rqd: Y e~ "\\\~ ~~act: 2~~:~~' \'\ '\ % of Lot Coverage: ~~~\~\.~~\\ ~~~ .....i~.:.. . ':.\.\~\r\r~ ~~\~ ~~~f\) . PUBLIC 1M . 'W - it ~~~ Co. ~CQ~\'\ . . ~ \'oJ " . '\ u...(j~ c.~ ~ R~CWalk Type' Partially Improved ~~,\,'..\~~C\. ~ ~~,,\\\'I" Curbside 5' No c.()~\'4' 0..\'\ '\)~ Downspouts/Drains: Curb and Gutter City Engineer is not requiring a streeirt{Qbio~ment at this time, instead owner will sign improvement agreement. r Paee 1 of4 . , . CITY OF SPRINGFIELD Status Issued Building/Combination Permit PERMIT NO: COM2003-00419 ISSUED: 06/24/2003 APPLIED: OS/28/2003 EXPIRES: 12/24/2003 VALUE: $ 133,770.00 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line I Valuation Description I Description Dwellines Garaee Tvpe of Construction V Wood Frame Garaee $ Per Sq Ft or multiplier $74.60 $19.60 Square Footage or Bid Amount 1,666.00 484.00 Value Date Calculated Total Value of Project $124,283.60 $9,486.40 $133,770.00 OS/29/2003 OS/29/2003 ~ Fee Description Amount Paid Date Paid Receipt Number Plan Review Residential $439.50 5/23/03 1200200000000001316 -Mechanical Issuance Fee- $10.00 6/24/03 1200200000000001614 + 10% Administrative Fee $105.82 6/24/03 1200200000000001614 + 7% State Surcharge $74.07 6/24/03 1200200000000001614 1 Bath One & Two Family $290.00 6/24/03 1200200000000001614 Addressing Assignment $16.00 6/24/03 1200200000000001614 Building Permit $676.15 6/24/03 1200200000000001614 Curbcut Permit $75.00 6/24/03 1200200000000001614 Dryer Vent $12.00 6/24/03 1200200000000001614 Exhaust Hoods $18.00 6/24/03 1200200000000001614 Plan Review - Planning $59.00 6/24/03 1200200000000001614 Sanitary Sewer - Improvement $436.54 6/24/03 1200200000000001614 Sanitary Sewer - Reimbursement $574.34 6/24/03 1200200000000001614 SDC MWMC Administration $10.00 6/24/03 1200200000000001614 SDC MWMC Improvement $69.66 6/24/03 1200200000000001614 SDC MWMC Reimbursement $665.72 6/24/03 1200200000000001614 SDC Sanitary/Storm Admin $107.41 6/24/03 1200200000000001614 SDC Transpo Admin $105.54 6/24/03 1200200000000001614 SDC Transpo Improvement $1,419.61 6/24/03 1200200000000001614 SDC Transpo Reimbursement $321.74 6/24/03 1200200000000001614 Storm Drainage Impervious Area $761.40 6/24/03 1200200000000001614 Temp Power 200 amps or less $50.00 6/24/03 1200200000000001614 Vent Fan $12.00 6/24/03 1200200000000001614 Willamalane Attached (duplex) $1,848.00 6/24/03 1200200000000001614 Total Amount Paid $8,157.50 I Plan Reviews I Initial Review OS/27/2003 OS/29/2003 APP LLH Paee 2 of 4 . . CITY OF SPRINGFIELD Building/Combination Permit Status Issued PERMIT NO: COM2003-00419 225 Fifth Street, Springfield, OR ISSUED: 06/24/2003 APPLIED: OS/28/2003 541-726-3753 Phone EXPIRES: 12/24/2003 541-726-3676 Fax 541-726-3769 Inspection Line VALUE: $ 133,770.00 Planninl! Review OS/29/2003 06/03/2003 APP AID Lot, as shown on plot plan, has not been legally created. The duplex was reviewed as existing on the original lot with a configuration of 143 x 310. Minor Partition 315 was approved by the City March 7, 1972. The partition must be recorded with the County prior to any future construction on the lot. Tree Felling Permit shall be required if more than 5 trees (5 dbh) are removed. Public Works Review 06/03/2003 06/11/2003 APP DJW Property owner must sign improvement agreement and write a check for the recording fee of $36 to Lane County Deeds '& Records. Return signed and notorized agreement to Don Rogers. Structural Review OS/29/2003 06/16/2003 APP TCM To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. 1 Curbcut - Standard: After forms are erected but prior to placement of concrete. 2 Ufer Electrical Ground: Install ground rod at footing and call for inspection in conjunction with footing and/or foundation inspection. 3 Footing: After trenches are excavated. 4 Foundation: After forms are erected but prior to concrete placement. 5 Post and Beam: Prior to floor insulation or decking. 6 Floor Insulation: Prior to decking. 7 Shear Wall Nailing: Before covering sheathing with finish materials. 8 Framing Inspection: Prior to cover and after all rough in inspections have been approved. 9 Wall Insulation: Prior to cover. 10 Ceiling Insulation: Prior to cover. 11 Drywall: Prior to taping. 12 Final Building: After all required inspections have been requested and approved and the building is complete. 13 Underground Plumbing: Prior to filling the trench and including required testing. 14 Rough Plumbing: Prior to cover and including required testing. 15 Water Line: Prior to filling trench and including required testing. 16 Sanitary Sewer Line: Prior to filling trench and including required testing. 17 Storm Sewer Line: Prior to filling trench. 18 Final Plumbing: When all plumbing work is complete. 19 Rough Mechanical: Prior to Cover 20 Final Mechanical: When all mechanical work is complete. 21 Temporary Electric: Approval required prior to Utility Company energizing pole. 22 Rough Electric: Prior to Cover Pal!e 3 of 4 . . . CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: COM2003-00419 ISSUED: 06/24/2003 APPLIED: OS/28/2003 EXPIRES: 12/24/2003 VALUE: $ 133,770.00 Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line 23 Electric Service: Approval required prior to utility company energizing service. 24 Final Electric: When all electrical work is complete. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made ofany structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times ~g construction. L b _ d.- rr ~ OJ. Owner i{ Contractors Signature Date Pal!:e 4 of 4 City of Springfield Official Receipt Development Services Departmene Public Works Department .,1 Date: 06/24/2003 9:19:29AM Amount Paid 16.00 1,848.00 50.00 59.00 75.00 761.40 574.34 436.54 321.74 1,419.61 665.72 69.66 10.00 107.41 105.54 676.15 290.00 12.00 18.00 12.00 10.00 74.07 105.82 $7,718.00 225 Fifth Street Springfield, Oregon 97477 541-726-3759 Phone Receipt #: 1200200000000001614 Job/Journal Number COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 COM2003-00419 Description Addressing Assignment Willamalane Attached (duplex) Temp Power 200 amps or less Plan Review - Planning Curb cut Permit Storm Drainage Impervious Area Sanitary Sewer - Reimbursement Sanitary Sewer - Improvement SDC Transpo Reimbursement SDC Transpo Improvement SDC MWMC Reimbursement SDC MWMC Improvement SDC MWMC Administration SDC Sanitary/Storm Admin SDC Transpo Admin Building Permit 1 Bath One & Two Family Vent Fan Exhaust Hoods Dryer Vent -Mechanical Issuance Fee- + 7% State Surcharge + 10% Administrative Fee Item Total: Payments: Type of Payment Check Check Number Batch Number Paid By GY ANENDRA PRASAD Received By djb Authorization Number How Received In Person Payment Total: Amount Paid $7,718.00 $7,718.00 . .