Loading...
HomeMy WebLinkAboutPermit Building 1996-12-31 COMM ERCIALlI N DUSTRIAL PERMIT APPLICATION ~ 225 Fifth Street, Sprlnglleld, Oregon 97477 LOCATION OF PROPOSED WORK /7/LJ /~.&"'7'~A//AZ-~ - - - ASSESSORS MAP I '?~~ '::? -.:;-, ~ Y. - - -... r JOB NUMBER ~h/7..b INSPECTION LINE 7263769 OFFICE 7263759 TAX LOT ~ 3~ OWNER #C:~,... ,(~y"~~~ ~. PHONE ADDRESS -:2~ ~~ ..__~ ~.7 4?-.-?-9-- CV4/~ ~z->.~';';; ---' ~,. ~ ~ ~?"7'd>/ CITY ~ _ _- _ __ STATE ZIP JsfY" 1- DESCRIPTiON OF WORK M"(.,, n""'&?,~~~~_~ ?~-,/,7'~___ ~::::r- NEW REMODEL ~#'.{..?o'~'~~~E~~" OT;ER .,n . - r ~;LU;""'-"';~ NAME ADDRESS ARCHITECT CONTRACTOR S NAME ADDRESS.,...p~ . GENERAL/.--Y ~>2~/,~~~.~::n 0~ , - ---/";' I . /' PLUMBING PHONE CONST CONTRACTOR' EXPIRES PHONE 7~,a,S' .<~~_ , , --:J"";>- ~~ - - MECHANICA' ELECTRICAl PLlJMAING I In 1 I 1 NO I FI=I= r.Ha~r,1= Single Fixture Relocated Bldg (new fiX addtl) Water Service II Sanitary Sewer II Storm Sewer II Backflow DeVice TOTAL PERMIT MECHANIr.AI Furnace/burner & vent <: 100.000 BTUs Furnace/burner & vent >100,000 BTUs I=EI= rl-l,llRr.1= Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Statlonaryevap cooler Vent Fan/Single ducl Vent System aIJ3r1 from AC or htg Mechanical exhaust hood and duct Permit Issuance $1000 TOTAL PERMIT - OFFICE USE - OUAD AREA LAND USE 'OF BLDGS # OF UNITS OCCY GROUP CONSTR TYPE , OF STORIES HEAT SOURCE SO FT $/SO FT SO FTG MAIN SO FTG ACCESS SO FTG OTHER X '- - > X X PLAN CHECK FEE 2~.o ~ RCPT' OAF , DEMOLITION I BUILDING PERMIT [5% Stale 1-2: Surcharoe r ..7 I MECHANICAL 15% Stale Surcharoe I PAVING 789- f'fZ , PLUMBING 5% State Surcharqe FENCE VA llJE S ----- -- SIDEWALK FT CURBCUT FT HANDICAP ACCESS FLOOD PLAIN ZONING LIGHTING POWER BUDGET WATER HEATER VALUE TOTAL VALUE OF PROJECT BY SUBTOTAL PERM ITS SYSTEMS . DEVELOPMENT 7" /. 9p- TOTAL PERMIT FEES EXCLUDING ELECTRICAl 66. ~ 2. REQUIRED INSPECTIONS It IS the re~ponSlbllltY of the permit holder to see that all Inspections are made at the proper time To request an Inspection, call 7263769 (recorder), state your City designated Job number, Job address, type of Inspection requested and when you will be ready for Inspection Requests received before 7 00 a m will be made the same working cJay, requests made after 7 00 a m will be made the following work day SITE INSPECTION To be made after excavation, but pnor tO,setup of forms v ROUGH PLUMBING, ();llCTRICA'\'t& MECHANICAL No work IS to be covered until these I nspectlons have been ma.de and approved PAVING After gravel IS In place but prior to placmg a,.sphalt or concrete UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL To be made before any work IS covered t/ I FIREPLACE Prior to placing facing matenals and before framing Inspection , FRAMING .To be made after the roof, all frarT-lIng, fire blocking and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumb[ng and mechanical are approved SPECIAL INSPECTIONS In accordance Section 306~of the Stelte Specialty Code a special [nspector.shall be employed by the Owner! Contractor dUring construction of the following work A copy of the special testing reports shall be furnIshed \0 the BUIldIng DIVISion ATTIC DRAFT STOPS & CURTAIN WALLS FOOTINGS & FOUNDATIONS To be made after trenches are exca~vated and forms are erected, all steel In place, but prior to plaCing concrete STRUCTURAL CONCRETE In exceSS of 2500 PS I (306 a 1) CONCRETE SLAB To be made after all Inslab bUilding service equipment, conduit, piping, accessories and other anCillary equipment Items are In place but before any concrete is placed STRUCTURAL WELDS Performed on the Job (2722 f) UNDERGROUND PlumbIng, electrical, gas, sanitary sewer, storm sewer, water and drainage lines To be made prior to covering or filling trenches INSULATION &-VAPOR BARRIER To be "made after all Insulation and required vapor' barners are In place but before any lath or gypsum board Intenor wall covering IS applied HIGH STRENGTH BOLTING Dunng all bolt Installation and tightening operations (306 a 6) SPRAYED ON FIREPROOFING Standards 438 UBC UNDERFLOOR PlumbIng, electrical, mechanical To be made prior to Installation of floor Insulation, decking or floor sheathing FIRE & SEPARATION WALL Located and constructed according to plans SPECIAL GRADING, EXCAVATION AND FILLING Dunng earthwork (306 a 11 & Chapter 29) .r , \ LATH AND/OR GYPSUM BOARD To be made after all lathing and gypsum board, Intenor and exterior, [S In place but before any plastenng Is applied or before gypsum board JOints and fasteners are taped and finished GLU LAM BEAMS InspectIon Certificate by an approved agency, furnished to the City's BUilding DIVIsion before beams are placed (2501 U BC STDS 2510,11) POST & BEAM To be made prIor to Installation of floor Insulation, decking or floor sheathing STRUCTURAL MASONRY (306 a 7) FLOOR INSULATION & VAPOR BARRIERS To be made prior to installation of decking or floor sheathing MASONRY Steel location, bond beams grouting or verticals In accordance with UBC 2415 SIDEWALK & DRIVEWAV ReqUired for all concrete paving within street right of way, to be made after all excavating complete and form work and sub base material In place ROOF SHEATHING AND NAILING Prior to Installing any roof coverl ng CURB AND APPROACH APRONS After forms are erected but prior to plaCing concrete * In addition to the Inspec tlons specified, the BUilding OffiCial may make or require other Inspections of any construction work to ensure compliance with the Building, City or Development Code FINAL PLUMBING v FINAL ELECTRICAL SITE PLAN REVIEW BOARD Must be requested 2 days In advance of the date you Wish inspectIon All project conditions such as landscapmg, parking lot striping, etc must be completed before requesting this inspection .v FINAL BUILDING Requested after the final plumbing, electrical, mechanIcal and Fire Department Inspections are made and approved No occupancy of the premises can be made until a CertifIcate of Occupancy has been Issued by the BUilding DIVISion and posted on the premises FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS , PLANS REVIEWED BV//~ ~~ (1!'-.- f' "/ DAT',/2-~....~ By signature, I state and agree, that I have carefully examined the completed appl[catlon and do hereby certify that all Information herein [s true and correct, and I further certify that any and all work performed shall be done In accordance With the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertainIng to the work described flereln, and that NO OCCUPANCY Will be made of any structure Without perm[sslon of the BUlldtng Safety DIVISIon I further certdy that only contractors and employees who are In compliance With ORS 701055 will be used on this project I further agree to ensure that all required inspections are requested at the proper time, that project address IS readable from the street, that the permit card IS located at the front of the property, and the approved sel of pldns Will remain on the site at all times dk::t'2tlon SIgnatr;A _~_ f- f- --4~~ - Date ~ 2. -.. 1- ~? ~OUNT RECEIVED (,/1 ~ ~ _ DATE PAID I (}/'3/- "70 RECEIPT # P '-f/q{7 RECEIVED BY ~ VALIDATION