HomeMy WebLinkAboutPermit Plumbing 1999-10-20
"
,~
,,~l '"<
CO MM ERCIAL/I N DUSTRIAL
PERMIT APPLICATION
~
&~r;- #.</J JJ/.-l
JOB NUMBER
f9/'-I)"r)
225 Fifth Street, Sprlngfreld, Oregon 97477
INSPECTION LINE 7263769
OFFICE 7263759
ASSESSORS MAP
LOCATION OF PROPOSED WORK Z 0 b.s-
116)'2.. ') '-/3
TAX LOT 1?190()
OWNER R; 'ltp/ .1<,er1i/'" d-rt'
ADDRESS 1'=-1?65- _ _(''''r7e,,",'-:~J
CITY y-"~ j.;~{f
DESCRIPTION OF WORK //o.5l""#,,
6~j}
;6 / vol_
PHONF
7C(b - C rrJ' 2...
STATE
?JIf
ZIP
~7<r 77
~e. Te,
13 4:.<=-1: J-fvw j)el/(::: €-
a ,j! h-"'
NEW
REMODEL
ADDITION
DEMOLISH
OTHER
VALUE
NAME
ADDRESS
PHONE
ARCHITECT
CONTRACTOR'S NAME
ADD RESS
CONST
CO NT RACTO R #
EXPIRES
PHONE
GENERA\
PLUMBING
Lw...,~
f?I.. '" h, :,
<:"0/02'('9)
MECHANICAl
ELECTRICAL
,
\
PLUMBING
I MECHANICAL
NO
FEE CHARGE
Single Fixture
Relocated Bld9
(new ftx addU)
Water Service
It
Sanitary Sewer
It
Storm Sewer
It
Backflow DeVice / ~ fjr
N(1
I I=FI= I ~I-fA RnF
I
Furnace/burner & vent
< 100.000 BTUs
Furnace/burner & vent
>100.000 BTUs
Floor furnace and vent
Suspended wall or floor
mounted unIt heater
ApplIance Vent
separate
Stationary evap
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg
Mechanical exhaust
hood and duct
/ S"
Permit Issuance
$1000
TOTAL PERMIT
If, SO
TOTAL PERMIT
- OFFICE USE..- HANDICAP ACCESS
NOTICE: ATTENTION Oregon law rC;JUlres you 10
OUAD AREA .J.AIlIa.1J& - f(1I1",.. ."In~ njopled I5,LOOD,P.LAIN . . ~
IMl::lt'I:HIVlII ::IHI\LLI:II....IREIF I HI: WUHI\ - -- -- ,."~v'''ll'JI.u",,,y
# OF BLDGS _ J ~ ..eF.l-lWJ"'" NollflcallonCenler Thzo'Nfriiij'S are selforth
AtfltI",f;IZEEI ~rID[;;l .. ilS PER,vlfI I;:mlO r In UAH ~:>~-uul-001 0 tlJrough OAR 952-001-
OCCY GROU(X)MMENCEDORIS.I\BANDONlmJflOOl TYPE 'nDan Vn"rM~'obtalnt!W..IjfJ!f\!9. ft~L\I\(If.'i'&~UBfET
# OF STORIEANV1AOnAVPFRI0l1 HEAT SOURCE call rgU,;3center (~tiJ~'i'ER'1REAT1R"one
nurnoerwrme Oreaoil UlIII:V NotlfJr:l'ltJ0n
sa. FT $/so FT IJenter IS 1 >7AlilJEl32-2344)
SO FTG MAIN
sa FTG ACCESS
sa FTG OTH ER
X
X
X
TOTAL VALUE OF PROJECT
PLAN CHECK FF~
RCPT#
DAT"
~Y
I BUILDING PERMIT
I ""State
SurCharQ.8
MECHANICAL
- 7%State \
Surcharae') ~ - \ ,\.
PAVING
PLUMBING
DEMOLITION
/70, State
burcharge
FENCE
. VALUE $
SIDEWALK
,
FT
..J
,.r
SUBTOTAL
PERMITS _' J
SYSTEMS
DEVELOPMENT
,
,
CURBCUT
FT
TOTAL PERMIT FEES I
EXCLUDING ELECTRlcpr
REQUIRED INSPECTIONS
,
It Is the responsibility of the permit holder to see that all Inspections are made at the proper time To request an Inspection, call
7263769 (recorder), state your City designated job number, job address, type of inspectIon requested and when you will be ready
for Inspection Requests received before 7 00 a m will be made the same working day, requests made after 7 00 a m WIll be made
the following work day
SITE INSPECTION To be
made after excavation, but
prror to setup of forms
UNDERSLAB PLUMBING,
-' ELECTRICAL &\ '
M-ECHANICAL To be made
before any work Is covered
<:-" ' '\
"FOOTINGS'& FOUNDATIONS
To be made after trenches are
excavated and forms are
erected, all steel In"'place, but
prior to placing concrete
ROUGH PLUMBING.
ECECT-RICAL &
MECHANICAL No work Is to
be covered until these
inspections have been made
and approved
PAVING After gravel IS In
place but prior to placing
asphalt or concrete
FIREPLACE Prior to placing
facing materIals and before
framIng InspectIon
SPECIAL INSPECTIONS In accordance
Section 306 of the State Specialty Code
a special Inspector shall be employed
by the Ownerl Contractor dunng
constructlon of the follOWing work A
copy of the special testing reports shall
be furnished to the Building DIvIsion
ATTIC DRAFT STOPS &
CURTAIN WALLS
CONCRETE SLAB To be
made after all lnslab building
Gervlee equipment, conduit,
pi ping, accessories and other
ancillary equipment Items are
In place but before any
concrete Is placed
FRAMING To be made after
the roof, all framing, fire
blocking and bracing are In
place and all pipes, chimneys
and venta are complete and
the rough electrical, plumbIng
and mechanical are approved
INSULATION & VAPOR
BARRIER To be made after all
Insulation and required vapor
barriers are In place but
before any lath or gypsum
board InterIor wall covering Is
applied
STRUCTURAL CONCRETE In
excess of 2500 PS I (306 a 1)
STRUCTURAL WELDS
Performed on 1he lob (2722 f)
HIGH STRENGTH BOLTING
During all bolt Installation and
tightening operations (306
a6)
UNDERGROUND' Plumbing.
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines To be made
prior to covering or fillIng
trenches
SPRAYED ON
FIREPROOFING
Standards 438
UBC
UNDERFLOOR Plumbing. I
electrical, mechanical To be
made prror to Installation of
floor insulation, decking or
floor sheathing
FIRE & SEPARATION WALL
Located and constructed
according to plans
SP,ECIAL GRADING,
EXCAVATION AND FILLING
During ear1hwork (306 a 11 &
Chapter 29)
POST & BEAM To be made
prior to Installation of floor
Insulation, decking or floor
sheathing
LATH AND/OR GYPSUM
BOARD To be made after all
lathing and gypsum board,
Interior and exterior, is In
place but before any
plastering is applied or before
gypsum board Joints and
fasteners are taped and
finished
GLU LAM BEAMS Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed (2501 U BC
STDS 25 10.11)
STRUCTURAL MASONRY (306
a 7)
FLOOR INSULATION &
VAPOR BARRIERS To be
made prior to Installation of
decking or floor sheathing
SIDEWALK & DRIVEWAY
ReqUired for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub base material In
place
\
*In addition to the Inspec
tlons specifIed, the Building
Official may make or require
CURB AND APPROACH other Inspections of any
ROOF SHEATHING AND APRONS After forms are cons1ructlon work to ensure
NAILING Prior to Installing erected but prIor to placing compliance with the Building,
~~: oof covering concrete City or Development Code
~---- ------------------------------------------------
. F AL PLUMBING SITE PLAN REVIEW BOARD Must be requested 2 days In advance
of the date you wish InspectIon All project conditions such as
landscaping, parking lot stripIng, etc must be completed before
FINAL ELECTRICAL requesting this Inspection
MASONRY Steel location.
bond beams grouting or
verticals In accordance WIth
UBC 2415
FINAL MECHANICAL
FINAL BUILDING Requested after the. final plumbing, electrrcal,
mechanical and Fire Department Inspections are made and
approved No occupancy of the premises can be made untIl a
Certificate of Occupancy has been Issuedlby the BUilding Division
and posted on the premIses
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS
PLANS REVIEWED BY
OAT"
By sIgnature, I state and agree, that I have carefully examined the completed application and do hereby certIfy that alllnformatlon
herein Is true and correct, and r further certIfy that any and all work performed shall be done In accordance with the Ordinances
of 1he City of Springfield, and the Laws of the State of Oregon pertaining to the work deSCribed herein. and that NO OCCUPANCY
WIll be made of any structure without permission of the Building Safety Division I further certify that only contractors and employees
who are In compliance with ORS 701055 will be used on this project
I further agree to ensure that all required Inspections are requested at the proper tIme, that project address is readable from the
street, that the permit card Is located at the front O~hJ property, and the approved set of plans will remain on the site at all
times dUrlng-f'ctlon G"/ /)-==)), ~r-
Slgnaturo /'IL~ c&....- V;;:? ~ Date /0 -.<0 - '(?
VALIDATION
AMOUNT RECEIVED
/) 1 )'7 l..{ )
I ~. s-v
DATE PAID lulu. /11, /I
RECEIVED BY ..nf IJ~
I
RECEIPT'