HomeMy WebLinkAboutPermit Building 2016-10-25Ir'l-N.
I
CONC. DRIVEWAY
— — — — — — — — — — —
,X. FENCE LINE--_,_�.-----
,
-95.00-- .. - .. t_ .. - . .
CONSTRUCT 5TANDARD
RF-51DENTIAL CON5TRUCTION
ENTRANCE
2M
25-0"
Z Com 3 /lam Jop
C)CCUPAN-.,
0 C
,_
C
1!2-R 1 _---�S7
HERE
C"�
INDIC4 z 'F
TIONS p,1
C Tl
TfIL ccjl; 7.4 E
1 D,`,TE E3 E r, CES
I -DING OFFICIAL.
Ce OF P., E3 y
PPROVE0
'
S?O,
IN5TALL 5TRAIeN YqATTLE5 OR EQUIVALENT1
PERIMETER 5EVIMENT CONTROL BEST
MANAGEMENT PRACTICE
Ln
HT PUMP rMN
COMPRE55OR U
:OX. FENCE LINE
170
WALK
10'P.U.E. AND
5LOPEEASEMENT
\�
64.30'-
MOUNTAINGATE DR.
NOTICE:
THIS PERMIT SHALL EXPIRE IF THE WORK
AUTHORIZED UNDER THIS PERMIT IS NOT
MAMENCED OR IS ABANDONED FOR
ANY 180 DAY PERIOD.
�
ATTENTION: Otegon!aw Vol0
L-'
C: Grp �i,
follow ru!eF,, ado+�_! 1)_\!!�e
iY
Not:,f;,-ution Center. Those rules ale s,�-t iofth
in OAF; 052-001-0010th,,ouch OAR 952-001-
0090. yoLt M,,my',orhain -copes of the rules by
calling the.center. (No!-,: the telephone
number for the Oregon Utility Notification
Centel is 1 F_,,&J-332 2344).
M
Dr
, ; IE WED fOR
CODE COMPL 1A NCE
FIN15H FLOOR
ELEV 601'
LDAP STANDARD NOTES
1. Prior to any ground disturbance on the site one inspection with LDAP staff is required.
Issuance of this plan does not relieve the permit holder and or the contractor from all other
permitting requirements. Prior to beginning construction activities, all other necessary approvals
shall be obtained.
2. The erosion and sediment control measures shown on the plan are the minimum requirements
for anticipated site conditions. During the construction period, these measures shall be upgraded
as needed for unexpected storm. events and to ensure that sediment and sediment -laden water does
not leave the site.
3. The implementation of the ESC11 and the construction, maintenance, replacement, and
upgrading of the erosion and sediment control measures is the responsibility of the permit holder
and or the contractor until all construction is completed and accepted and vegetation / landscaping
is established.
4. The boundaries of the clearing limits shown on this plan shall be clearly flagged in. the field by
the engineer prior to construction. During the construction period, no disturbance beyond the
flagged clearing limits shall be permitted. The flagging shall be maintained by the pen -nit holder
and or the contractor for the duration of construction.
5. The erosion and sediment control measures on active sites shall be inspected and maintained
daily and within the 24 hours after any storm event of greater than 0.5 inches of rain per 24 hour
period. Measures small be inspected. by the permit holder and or the contractor after each rainfall
and at least daily during prolonged rainfall. Any required repairs or adjustments shall be made
immediately. The erosion and sediment control measures on inactive sites shall be inspected a
minimum of once every two (2) weeks or within 48 hours following a storm event.
L)
6. All erosion and sediment control measures shall be protected fi-om damage at all times. Control
measures shall remain in. place until permanent re -vegetation has been stabilized. Any measure
that is damaged or destroyed shall be repaired or replaced immediately.
7. Any areas of exposed soils, including roadway embankments, that will not be disturbed for two
days during the wet season (October I to .April 30) or seven days during the dry season (May I to
September' _30) shall be immediately stabilized with an approved ESC method (seeding &
mulching with straw, bark, compost, or plastic covering, ect.).
S. Street sweeping shall be performed as needed or when directed by the City inspector to insure
public right-of-ways are kept clean and free of debris. Street flushing is prohibited.
9. When trucking saturated soils from the site, either water -tight trucks shall. be used or loads
shall be drained on site -until dripping has been. reduced to no more than one gallon per hour.
Sediment laden water will not be allowed to enter the storm water systern
10. Extracted ground water from excavated trei icbes shall be disposed of in a suitable manner
without damage to adjacent property, City's storm water system, water .features, and related
natural resources. Approval of a dewatering system does not guarantee that it will meet
compliance or be acceptable for use in all situations. Modifications to the dewatering system will
be required if compliance can not be met. At no time will sediment laden water be allowed to
leave the constructioi-.t site.
11. A supply ofmaterials necessary to meet compliance and implement the LDAP or other best
management erosion practices under all weather conditions shall be maintained at all times on the
construction site,
12. No hazardous substances, such as paints, thinners, fuels and other chemicals shall be
released onto the site, adjacent properties, or into water features, the City's stone water system, or
related natural resources.
13, The ESC facilities shall be inspected daily by the contractor and maintained to ensure
continued proper functioning. Written records shall be kept of weekly reviews of tile ESC
facilities during the wet season (October I to April 30) and of monthly reviews during the dry
season (Mayl to Szpternber 30).
WASTE
Connect Sanitary Sewer to existing service connection
Field verify location.
STORM
Connect Stormwater to existing service connection
Field verify location.
The proposed development will be at maximum
allowable impervious area. NO ADDITIONAL
IMPERVIOUS ARE WILL BE ALLOWED
ACCESS
Driveway via private drive.
SIDEWALK
Construct curbside sidewalk per City Standard 3-12
TREES
New street trees shall be at least 2 inches in caliper.
Street trees shall be selected from the City Street Tree
List and installed as specified in the City's Engineering
Design Standards and Procedures Manual.
PROP05ED RE51DENCE
ON LOT I
MOUNTAINGATE 5UBDIV15I0N
SPRINGFIELD, OR
Z
0 <
Z
(D
W 0Y
� 0
LU
0Z
Z
1
(n
Its)
C) Ln
tV
LU
LL
LU
<
Z LU t—
> d3
C1
< d3
A
<
JU (n
101 lu ru-
<
< V
n T_ LIJ,
LU
0Z
Z
1