HomeMy WebLinkAboutPermit Building 2016-12-22OCCUPANCY LOAD
_--LI-02—P..sw ��Sfri
ATTENTION: Oregon law requires you to
follow rules adopted by the Oregon Utility
Notification Center. Those rules are set forth
in OAR 952-001-0010 through OAR 952-001-
0090. You may obtain copies of the rules by
calling the center. (!vote: the telephone
number for the Oregon Utility Notification
Center is 1-800-332-2344).
NCITIC'E:
THIS PERMIT SHALL EXPIRE IF THE WORK
AUTHORIZED UNDER THIS PERMIT IS NOT
COFOMENCED OR IS ABANDONED FOR
ANY 180 DAY PERIOD.
----------
WASTE
Connect:sanita.ry sewer to 6" service connection.
Field.,Verify location
STO R IVI
Connect storm sewer to weephole(s) in curb per City
Standard 3-6. Pipe constructed within Right -of --Way
must be perpendicular to Right -of -Way.
ACCESS
Construct driveway per City Standard 3-19.Maximum
width is 24 feet
SID_ EWALK
Construct curbside sidewalk per City Standard 3-12
TREES
New street trees shall be at least 2 inches in caliper.
Street trees shall be selected from the City Street
Tree List and installed as specified in the City's
Engineering Design Standards and Procedures
Manual
SfD�NG�:
':;IE CA1"li=5ELL
�)UNTAIN GATE
_D, OR. 97478
RrViEWED` FOR
CODE COMPLIANCE