Loading...
HomeMy WebLinkAboutPermit Building 2016-12-22OCCUPANCY LOAD _--LI-02—P..sw ��Sfri ATTENTION: Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001- 0090. You may obtain copies of the rules by calling the center. (!vote: the telephone number for the Oregon Utility Notification Center is 1-800-332-2344). NCITIC'E: THIS PERMIT SHALL EXPIRE IF THE WORK AUTHORIZED UNDER THIS PERMIT IS NOT COFOMENCED OR IS ABANDONED FOR ANY 180 DAY PERIOD. ---------- WASTE Connect:sanita.ry sewer to 6" service connection. Field.,Verify location STO R IVI Connect storm sewer to weephole(s) in curb per City Standard 3-6. Pipe constructed within Right -of --Way must be perpendicular to Right -of -Way. ACCESS Construct driveway per City Standard 3-19.Maximum width is 24 feet SID_ EWALK Construct curbside sidewalk per City Standard 3-12 TREES New street trees shall be at least 2 inches in caliper. Street trees shall be selected from the City Street Tree List and installed as specified in the City's Engineering Design Standards and Procedures Manual SfD�NG�: ':;IE CA1"li=5ELL �)UNTAIN GATE _D, OR. 97478 RrViEWED` FOR CODE COMPLIANCE