HomeMy WebLinkAboutPermit Building 2016-11-01Construct driveway per City Standard 3-19.No
above -ground facilities (fire hydrants, power poles,
catch basins, valves, j -boxes, etc.) shall be permitted
within the apron or ramp area
Connect Sanitary Sewer to 6" service connection.
Field verify location.
[A
0
tz_
MINIMUM SETBACKS — INTERIOR LOTS
All measurements are from Property lines
-Front Yard to House 10 feet
-Front Yard to Garage 18 feet
-Side Yard to House or Garage 5 feet
-Rear Yard to House or Garage 10 feet
P.U.E. MAY CHANGE SETBACKS
-24' MAX
•
DAT: RECEIVED: 10.12.16 JOB NO. 516.02537
C� ZONE: LDR OCCUPANCYGROUP: R3
UNrr(S): 1 OCCUPANCY LOAD:
STORIES: 1 TYPECONSTRUCT(O4: VB
LEGAL DESCRIPTION: 18.02.05.33.00500
ADDRESS: 4199 RICHLAND ST
OWNER: BWCH
THE CONTENTS HERE ON HAVE BEEN R-EVIEWED, WITH ALTERATIONS
INDICATED IN RED_ CHANGES OR ALTERATIONS MADE TO THE APPROVED
DRAWINGS OR PROJECT AFTER THE DATE BELOW SHALL BE .APPROVED BY THE
BUILDING OFFICIAL_
tVV1
CITY OF SPRINGFIELD, 6REGON
APPROVED BY:Z� f
-Z
NOTICE: This permit shall expire if the work authorized under
this permit is not commenced or is abandoned for any 180 day
period.
ATTENTION: Oregon law requires you to follow rules adopted by the
Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through 952-001-0090. You may obtain copies of the
rules by calling the center. (Note: The administrative telephone
number for the Oregon Utility Notification Center is (800)332-2344.
New street trees shall be at least 2 inches in caliper.
Street trees shall be selected from the City Street Tree
List and installed as specified in the City's Engineering
Design Standards and Procedures Manual
Connect Storm Sewer to weephole(s) in curb per City
Standard 3-6. Pipe constructed within Right -of -Way
must be perpendicular to Right -of -Way.
Construct curbside sidewalk per City Standard 3-12.
yq
FOR
R
�J 1ANCE