HomeMy WebLinkAboutApplication APPLICANT 11/21/2016 (2)I
,I
A
Qate
NU 7 i 2016
I
18-02-03-00I 18-02-03-00
TL 602 TL 600
18-02-09.00
TL 100
VICINITY MAP
18.02-02-00
TL 401
18-02-02.00
TL 400
18.02-02-00
TL 100
TL 3500
18-02"02-00
TL 100
17-02-35-0D
TL 3604
M4010
PROJECT AREA
URBAN GROWTH BOUNDARY
ra CITY LIMITS BOUNDARY
TAX LOT
18-02-02-00MAP AND TAX LOT NUMBER
TL 1000
PARCEL SUMMARY
SYKINUYILLU UMIL)IL.IIVIN
17-02.35-00 03500 Lev Density
Residential (LDR)
Low Density Residential
1.01
17-02.35-00
03602
Lev Density
Remdenual (LDR)
Low Density Residential
3.03
17,02.35-00
03604
Lev Density
Residential (LDR)
Low Density Residential
41.41
18-02.0240
00100
Low Density
Residential (LDR)
Low Density Resideaual
125.25
18-02-02-00
D0100
Low Density
Residetial(LDR)
Low Density Residential
13.3
18-02-02-00
D0401
L. Density
Residential (LDR)
Low Density Residenusl
101.6
18.02.03-00
00600
Low Density
Residential (LDR)
Low Density Residential
79.5
18.02-03-00
00602
Low Density
ResideriMl (LDR)
NA
27.6
18-02.09-00
001011
L. Density Residential (LDR)
Ught44edium Ind.".1(LMQ
Low Density Residential
10.71
I8-02-10-00
0010D
Low Density Residential (LDR)
Low Density Resden0al
17.74
18-02.02-00
00100
Fm t(P)
Forest
4.66
I8-02.02-00
D0400
Fttl s (F3)
Forest
31.76
I9-02.09-00
00100
Forest (P2)
Forest
19.65
IB -02-10-00
00100
Forest(F7)
Forest
18IL76
A0' 300' 600' 1200'
SCALE
CAMERON
McCARTHY
sumun uexmsm es • ruxx. e
1�NnWmNmy • 6[ee Pv/n BINI
vww.caffi a,thycom
wwwsemeronmttarthymm
Q
u
V
W
0�
Prgeza
N
Q
Q W
J
Zm
D
Rev.k
Arc
QO
H
a
LLJv
u�
`c
Z
�
J
Z
Z
J
Q a -T
v
=
Y i
z
Q D
O
d
W N
Z M
j
o
�
�
g
>J_
STAMP
De tr.l
Donn 9y.
Chttktm
Prgeza
1526G
ws.
Nov. 21.2016
Rev.k
Arc
VICINITY MAP
SHFFI- tE
SHPaTH
VI
separate project Remain Height:,—fi 1140
i Sea Note 7
i I i Electrical Easement
i T
i 1 i i
t
I I
i
Tax1o117023500036021
Taxlot 1702350003604
Site PlanK�V o zo
HORIZOMALSGLLE E• NM
Site Plan Notes:
Legend
P`=�aNpgygas W
REVISIONS
z
Q
J
a_
W
I—
/ /
DESCRIPTION
SO,FOOTAGE
00
1. RESTROOM TO BE APPROXIMATELY 16X26 FT. (408 SF) BY CXT PRECAST PRODUCTS INC.
^z
Q
S. PROJECT PHASING ALL PROJECT ELEMENTS TO BE CONSTRUCTED AS PART OF PHASE t EXCEPT THOSE RELYING ON CONNECTIONS TO SUB WATER.WHICH
CC
EXISTING TREES
(z
LANDSCAPE PLANTING
CC
0
�q') �,
TCT PP
^E`
O
25%
J,�*(4l��bd
Z
9,045
12%
10. AREA RESERVED FOR FUTURE ADDITIONAL PARKING SPACES D5TOTAL, TO BE ADDED AT A LATER DATE PENDING DETERMINED NEED. NOTAPARTOFTHIS
VT'
}Yr!CL
L
4%
PARKING LOT PLANTING
1
2,138
N
Cut / Fill Calculations Area Calculations:
p
•^Y
W'
U)
c
WARNINGMARKINGS,ETC. SHALL CONFORM TO ALL OREGON STATE STANDARDS FOR PARKING AND ACCESS FOR THE DISABLED.
TREATMENT FACILITIES
>✓
LO
LO
a
�
See Plan
r
z
Q
J
a_
W
I—
/ /
DESCRIPTION
SO,FOOTAGE
%
1. RESTROOM TO BE APPROXIMATELY 16X26 FT. (408 SF) BY CXT PRECAST PRODUCTS INC.
APPROXIMATE AREA OF IMPACT
S. PROJECT PHASING ALL PROJECT ELEMENTS TO BE CONSTRUCTED AS PART OF PHASE t EXCEPT THOSE RELYING ON CONNECTIONS TO SUB WATER.WHICH
See Ullity& Landseap¢Bldgallon Plans
EXISTING TREES
NEW BUILDINGISTRUCTURE FOOTPRINT
LANDSCAPE PLANTING
2 SHELTER TO BE tO X 1e FT, COVERED WALKWAY ARCHED BY POLYGON, OREOUAL.
3. VEGETATED INFILTRATIONANO ROCK DETENTION BASINS. REFERTO CIVILAND !LANDSCAPE PLANS FOR ADDITIONAL INFORMATION.
�q') �,
TCT PP
/
25%
J,�*(4l��bd
See Lande"apellmgatil" Plan
9,045
12%
10. AREA RESERVED FOR FUTURE ADDITIONAL PARKING SPACES D5TOTAL, TO BE ADDED AT A LATER DATE PENDING DETERMINED NEED. NOTAPARTOFTHIS
/
(AIL TFeee to Remain)
4%
PARKING LOT PLANTING
4. ADA PARKINGTO INCLUDE 2 ACCESSIBLE SPACES AND I VAN ACCESSIBLE SPACE, DIMENSIONS OF SPACESANO ACCESS AISLE TO MEET REQUIREMENTS
OF OREGON STRUCTURAL SPECIALTY CODE SECTION 11M ALL ACCESSIBLE COMPONENTS INCLUDING, BUT NOT LIMITED TO SIGNS, RAMPS, TACTILE
2,138
9�
vii
Cut / Fill Calculations Area Calculations:
( •: PROPOSEDTREES
®
LandX.,X/IngaVon
WARNINGMARKINGS,ETC. SHALL CONFORM TO ALL OREGON STATE STANDARDS FOR PARKING AND ACCESS FOR THE DISABLED.
TREATMENT FACILITIES
Dean
1%
See Landscape/Irrigation Plan
MUOLCHEDTER
ZONE
See Plan
S. PEDESTRIAN AISLE, CONCRETE SURFACE, sFI. MOE.
r F
'y OREGON TJ
CUT1,700 CY
DESCRIPTION
SO,FOOTAGE
%
FILL 1,790 CY
APPROXIMATE AREA OF IMPACT
S. PROJECT PHASING ALL PROJECT ELEMENTS TO BE CONSTRUCTED AS PART OF PHASE t EXCEPT THOSE RELYING ON CONNECTIONS TO SUB WATER.WHICH
See Ullity& Landseap¢Bldgallon Plans
— —
NEW BUILDINGISTRUCTURE FOOTPRINT
408
Q%
�q') �,
PARKINGLOT
18,823
25%
J,�*(4l��bd
ACCESSROAD
9,045
12%
10. AREA RESERVED FOR FUTURE ADDITIONAL PARKING SPACES D5TOTAL, TO BE ADDED AT A LATER DATE PENDING DETERMINED NEED. NOTAPARTOFTHIS
CONCRETE SIDEWALKS& STAGING AREA
3,220
4%
—�—
GRAVEL ROAD REPAIR
2,138
3%
13. STRIPING SHOWN ALONG HAY 1261S APPROXIMATED FROM AN AERIAL PHOTO.
NON-IRRIGATEDLAWN
36,404
411%
p1 MIS IS y�p p/^+y
NO, i
TREATMENT FACILITIES
1%
y
MUOLCHEDTER
ZONE
206622
OF VEHICLE
PARKING LOT PLANTING
1,314
2%
O
LANDSCAPE PLANTING -
2513
<I%
1.I i )' i6 irg;;`�1I
_ TOTAL DEVELOPMENT AREA
75.360
6, BIKE CLEANING AND REPAm STAT ION. PRE MANUFACTURED'WASH STATION'AND' REPAIR BTATIOM EOUIPMENTTO BE PURCHASED AND INSTALLED IN OR
ADJACENT TO CONCRETE PAD. RUNOFF FROM SURFACE TO DRAIN TO ORNN ROCK AT PERIMETER
OF CONCRETE PAD.
T FENCES ANDIOR STRUCTURES AS DELINEATE BOUNDARY USED AS PRIVATE RENTAL
FAIL FENCE TO CONNECT TO ICTACCESS
STORMWATER PLANTING
4�
APPROXIMATE AREA OF IMPACT
S. PROJECT PHASING ALL PROJECT ELEMENTS TO BE CONSTRUCTED AS PART OF PHASE t EXCEPT THOSE RELYING ON CONNECTIONS TO SUB WATER.WHICH
See Ullity& Landseap¢Bldgallon Plans
— —
TAXLOT LINE
O
LAWN REPAIR
---- -
EASEMENT
DRINKING FOUNTAIN, BIKE CLEANING STATION) WILL BE INSTALLEDAND CONNECTED. SEE LANDSCAPE PIAN FOR NOTES RELATING SPECIFICALLY TO
See Landsce,oAni,I Plan
o
PROPOSED 4 -FT POST& WIRE FENCE
F --j
MULCHED TREE ZONE
10. AREA RESERVED FOR FUTURE ADDITIONAL PARKING SPACES D5TOTAL, TO BE ADDED AT A LATER DATE PENDING DETERMINED NEED. NOTAPARTOFTHIS
SHEET NO:
PROJECT
See Landsoapegengalon Plan
—�—
PROPOSED 4 -FT SPLIT RAIL FENCE
t2. APPROACH PERMITNOTER CLOSEST CROSS STREET IS 75th ST. APPROXIMATELY 320 FT. WEST FROM CENTER OF PROPOSED NEW ACCESS
13. STRIPING SHOWN ALONG HAY 1261S APPROXIMATED FROM AN AERIAL PHOTO.
L1
—_--_
IRRIGATION SLEEVE
OPTIONSTO BOTH THE NORTHERN AND SOUTHERN SIDES OF THE PARKING LOT. "RD TO COORDINATE WITH THE CRY TO FINNIZE DESIGN AS NEED ARISES.
GRAVEL
See LatMaeap¢Nri9ation Plan
AC PAVING
--)I,DIRECTION
OF VEHICLE
CIRCULATION
O
CONCRETE PAVING
6, BIKE CLEANING AND REPAm STAT ION. PRE MANUFACTURED'WASH STATION'AND' REPAIR BTATIOM EOUIPMENTTO BE PURCHASED AND INSTALLED IN OR
ADJACENT TO CONCRETE PAD. RUNOFF FROM SURFACE TO DRAIN TO ORNN ROCK AT PERIMETER
OF CONCRETE PAD.
T FENCES ANDIOR STRUCTURES AS DELINEATE BOUNDARY USED AS PRIVATE RENTAL
FAIL FENCE TO CONNECT TO ICTACCESS
e1p C
�C'!7-C
(APPROXIMATELY BS ACRES). NO PUBLSPLIT
WILL BEP PERMITTED WITHIN THIS ZONING ED
S. PROJECT PHASING ALL PROJECT ELEMENTS TO BE CONSTRUCTED AS PART OF PHASE t EXCEPT THOSE RELYING ON CONNECTIONS TO SUB WATER.WHICH
F>MWS m.D
WILL OCCUR DURING PHASE 2 OFTHEPROJECT. SUB WATER MAIN ALREADY EGSTS ALONG HWY 126, JUST NORTH OF THE PROJECT 61TE. PHASE 1
DEVELOPMEMWILL INCLUDE INSTALLATION OF ALL WATER LINES.IRRIGA➢Q4 LINES AND POINTS OF CONNECTION IN THE PROJECT AREMN PREPARATION
Dlawe by: KMK
FORPHASE2. AFTER ANNEXATION, WATER LINES WILL BE CONNECTED TO SUB WATER MAINS AND WATER DEPENDENT SITE AMENITIE&(RESTROOM,
DRINKING FOUNTAIN, BIKE CLEANING STATION) WILL BE INSTALLEDAND CONNECTED. SEE LANDSCAPE PIAN FOR NOTES RELATING SPECIFICALLY TO
Ddl¢:08.01.16
IRRIGATION DURING PHASE 1 & PHASE 2 DEVELOPMENT. BOTH PHASES TO BE COMPLETE WITHIN 2 YEARS PER SDC 517-115.
Dow, Set: are Plan ReWaw
L PROPOSED TRASH RECEPTACLE IS A STANDARD MET TRASH CAN AND IS NOT SUBJECT TO SDC 44-110,
10. AREA RESERVED FOR FUTURE ADDITIONAL PARKING SPACES D5TOTAL, TO BE ADDED AT A LATER DATE PENDING DETERMINED NEED. NOTAPARTOFTHIS
SHEET NO:
PROJECT
11. EASEMENTS SHOWN ARE PER SURVEY CONDUCTED BY BRANCH ENGINEERING. JFNUARY2016. SEE G1.0 EXISTING CONDITIONS PLAN.
t2. APPROACH PERMITNOTER CLOSEST CROSS STREET IS 75th ST. APPROXIMATELY 320 FT. WEST FROM CENTER OF PROPOSED NEW ACCESS
13. STRIPING SHOWN ALONG HAY 1261S APPROXIMATED FROM AN AERIAL PHOTO.
L1
14, FUTURE LOCAL ROAD CONNECTIONS TO BE ACCOMMODATED FOR WITHIN THE PROJECT AREA. POSSIBLE ROUTES HAVE BEEN STUDIED AND INCLUDE
.0
OPTIONSTO BOTH THE NORTHERN AND SOUTHERN SIDES OF THE PARKING LOT. "RD TO COORDINATE WITH THE CRY TO FINNIZE DESIGN AS NEED ARISES.