HomeMy WebLinkAboutPermit Mechanical 1986-10-30
ce~pt If.
" /
lb.-It) /) :3'3 c{
I
., , ... ,......'1.1........._111, I..~.~.'"_...l~........ .........,..... ..01.111.1 ..h.",~"""" ,.., ~I' ~~..I I , ., 1..1,..,,,,,,,.
J~I.I...,.I~. ," '" ..,.,.... "I,,, "" ,.........
.. RESID I~ IAL..
SPRINGFIELD
APPLICATION/PERMIT ~
225 North 5th Street
Springfield, Oregon 97477
Building Division
726-3753
Ascessors Map #
Job Location: 10/ c2 CEN'!E:/t.JJ#;1.Jt L '5-t. r;j/g/,I/L;/'It!.!;{)
T= Lot #
Subdivision:
O/,mer: (!)-JIIRtE5/-11u;1iRG IE- V/GEL/)ND
Address: 9,:;; ,C:P6 CD,/!' (jRG f(D
City: ;:. (Jh "fN f, () R.-f.
Nl'!w
Additien
RemodeL
Nobile Home
Phone: 3 Cj 3,- 3;;{ /7
Zip: q'J(,fO/
Desaribe liorl<: .'
1/11UA~~'
'W(){)cl4J~
Date of AppLiaatien
Contraators
GeneraL 1)4-1\\ ~(\l\ cl.
PLumbing
\()--?[)-rio
- -
q'OJ.0~
VaLue
AQ4ress
LtH~~
I
JA,
JftdJ~O(L
~ .
') ',~
\ (' ,~, '
\~ \
";)
./~. ,~ ,
. ," ',~
\' ,
J"-'
., /
,..> /'v
""/,/
y-'
/'
'/'
Signed:
Date:
J
\ I 0- ?-/\~ 1)7 '"
,-
Lisc.#
(l~ri..J(ID
Expires
Phone
ELectriaaL
Mechar:iaaL
qonst2'Uation Lender
It is the responaibitity of the permit holder to see that aU inapections are made at the propel' time, that aG.ah .::dd:ress is rea.da.bZe
from the street, and that the permit aard is Loaated at the front of the property.
~!3ui7.ding Dividor: approved pLan shalt remain on tha BuiLding Sit., at aU times.
PROCEDURE FOR INSPECTION REQUEST:CALL 726-3769 (reaorder) state your City designated job number, job address, type. of inspec;icn
requested a~d when you will be ready for inspcation, Contraaters or Owners ~e and phone number. Requests reaeived befere 7:00 ~
:,'in be made the same day, requests made after 7:00 am wiU be made the next :Jorking day.
ReouipcdTnsDcctiens
O SITE INSPECTION: To be made after
excavation, but prier to set up of
forms.
O ' UNDERSLAB PLUMBING, ELECTRICAL &
MECHANICAL: To be made before any
work is covered.
~
FOOTING & FOUNDATION: To be made
after trenahes are exaavated and
forms are ereated, but prior to
pouring ccncret~.
UND'E)RGROUND PLUMBING, SEWER, W,1TER,
DRAINAGE: To be made prior to fil-
,Ling trenches.
~
:=J
UNDERFLOOR PLUMBING & MECHANICAL:
To be made prior to instaZLation of
[7001' insuLation 01' deaking.
POST AND BEAM: To be made prior to
instaLLatien of fLoor insuLation 01'
deckirl{j.
ROUGH PLUMBING. ELECTRICAL & MECH-
ANICAL: No work is to be covered
,untiL these inspections have been
made and approved.
FIREPLACE: Prior to pta.air.g faaing
materiaLs and before framing inspea-
tion.
I FRAMING: Must be requested after
~ approvaL of rough pLumbing, eLeatri-
caL & meahanica't. AH roofing
bracing & chimneys, etc. nr~st be
,compLeted. No work is to be con-
,'ceaLed until thilJ inspection has
'been made and approved.
~
~
~
Your City Desigr~ted Job Number Ia:
o
INSULATION/VAPOR BARRIER INSPECTION:
To be made after aLL insuZation Qr4
required vapor barriers are in place
but before any Lath, gypsum beard 01'
walL aovering is appLied, and before
any insuLation is conaeaLed.
CbCe 0 f"J'7 q
,
~- ."\
,
~
DRYWALL INSPECTION: Te be made
after aH drywaH is in place,
but prior to any taping.
0, MASONRY: SteeL Loaation, bond
beams, grouting 01' vertiaaLs in
accordanae with U.B.C. Section
2415.
~
WOODSTOVE: After instaUation is
cempLeted.
DEMOLITION OR ;~;OVED BUILDIiJGS
:=J Sani tary se'..Jer :Japped at p:..opert'd tine
~ Septic tank p~ed and fiLLed with gra~eL
I PinaL - mIen above items are aempLeted
---l and when demoLition is aompLete 01' struc-
ture moved and premises cLeaned up.
'MobiLe Hemes
~ BLoaking and Set-up
~ Plumbing conneations sewer and water
---, ELectricaL Connection - BLoaking, set-up
~ and pLumbing aonneations nr~st be approved
before requesting eLectricaL inspeati~n
~ Aacessol"d Building
I FinaL - After porahes, skirting, decks,
---l etc. are compLeted.
D
ALL project aonditions, such as the instaLLation of street trees, ao,~Zetion of the
required Landscaping, etc., must be satisfied before the BUILDING FINAL aan be requested.
=:J FINAL PLUMBING
~ FINAL MECHANICAL
~ FINAL ELECTRICAL
:::J
o
FINAL BUILDING: The FinaL Building Inspeation must be requested after the FinaL PLumbing
ELectricaL, and MeahaniaaZ Inspectiona have been made and approved.
D
CURB & APPROACH APRON: After forms
are erected but prior to pouring
cOn:Jrete.
~A['[' !,fANHOLES AND CLEANQUT:l IfUST BF: ACCF:SSIB[,E, ADdUSTNENT TO BE MADE AT NO COST TO CITY Page of 2
D
SIDEWALK & DRIVElvAY: For aU aon-
crete paving within street right-
pf-way, to be made after aLL exaa-
vating compLete & form uJOrk & sub-
base materiaL in place.
D
!"ENCE: TlThen aompL~te -- Provide
gates 01' movabLe seatiens through
P.U.E.
o
I JO B NO, '6fr; () r'J19
I Zone:
Lot Sq. Ftg.
% of lot Coverag~
# of Stories
Total Height
Topography
ITEM
SQ.FTG
Main
Garaoe
Carport
Accessorll
Is. D.C.
TOTAL VALUE
(va/.uc)
1.5 x
Building Permi t
State Surcharge
Total Charges
lITEM
I Fixtures
I Residential (] bath)
I Sani wry Sewer
Wate!'
Plumbing Pern:it
State Surcr.a!'ge
Total CharcJes
I Inn
I Res. Sa, fta.
IN~/Extend Ci!'cuits
I Tempo!'ary Service
I
Ele~trical Pe!'mit
State Sur~harqe
Total Clurrqes
ITSM
Furnace ETU' S
I Exhaust Hood
Vent Fan
Woodstove
Permit Issuance
Mechanical Permi t
State Surcha!'ac
Total Charaea
,
I
Ise~~rity Deposit
I Sto!'age
I Maintenance
-- ENCROACHMENT --
Pe!'mit
Total Charqes
Curb~t
I Sidewalk
I Fence
I Electrical Label
I Mobile Home
I
I
I
TOTAL AMOUNT DUE: ~
SOLA.ESS
Occupancl/ Group:
LOT TYPE
NO.
NO.
NO.
Interior
Corner
Panhandle
Cul-de-aac
x
Value
FEE
CHARGE
FEE
CHARGE
PEE ,
CHARGE
(S ,0<:">
I
I IS. DO
'&;0
(5,60
rs.(;,f)
cc.:gc "
REQ.-
.
L ~ co G-1t-
Type/Const:
Bedrooms:
Enerall Sources
Heat
Water Heater
Range
Fireplace
Woodstove
Tlme
Lot Faces -
I
I
Access. I I
I I
I I
I I
II
P.L.
INorth
lEast
ISou th
Irvest
Setbacks
House Garage
Fees
J'
I
Building Value & Permit
1'.':i:; permit ia granted on the expl'eaa coruiition th'lt the said construction
slull, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning Ordinance, regulating the construction
and use of buildings, and may be suspended o!' revoked at any time upon vio-
U1tion of any p!'ovisions of said Ordinances.
I ~
I
~
Plan Check Fee:
Date Paid:
IRecdpt #:
I Signed:
I
I
I
Plumbing Permit
No person shall construct, install, alter o!' change any new o!' existing
plumbing or drainage syst~~ in whole o!' in part, unless such pe!'son is the
legal possessor of a valid plumbe!"s license, except that a person may do
plumbing wo!'k to p!'ope!'ty which is owned, leased o!' ope!'ated by the appli-
cant.
*
Electrical
Perrnit
Whel'e State Law !'equi!'es tr.at the elect!'ical wo!'k be done by an Ele~t!'ical
Cont!'acto!', the elect!'ical portion of this permit shall not be valid until
the U1bel has been signed by the Elect!'ical Cont!'acto!'.
~
Mechanical Permit
~
PZan Examine!'
vate
I HA VE CAREFULLY EXAMINE:D the comp leted app lication fo!' pe!'mi t, and do
hereby certify that all information he!'eon is true and correct, and I
fu!'ther certify that any ar.d all wo!'k pe!'formed shall be done in acco!'-
dance with the O!'dinances of the City of Springfield, and tha La;,)s of the
* State of Oregon ps!'taining to the wo!'k described herein, and that NO OCCU-
PANCY will be made of any structure without pe!'mission of the Building Di-
vision. I fu!'ther ce!'tify that o~ly contra~tors ar~ ~~loyees who are in
compiiance with ORS 701.055 will be used on this project ' '
~'
'/);jJhM/. 1/) . '~
si;::d1" ~
I r(),- 3'l' .~ R{..,
Date