HomeMy WebLinkAboutPermit Building 1989-8-7
.. RESIDFf\JTIAl..
APPLICAT jo_./ /PERMIT
225 North 5th Street
SpringfieZd~ Oregon 97477
BuiZding Division
726-3753 -
Job Location: /;) Vi.p C e /1 +el1 n " a)
Ascesoor3 Map H' 1'7 ()...3 J. fc., e)t./-
I
Subdivision:
Ot.mer: 720 bP/r -rl-f..p SiD ,0
Addre~s: .JOt) ~ 5. E i It;#1.."
City: -:p()rtl ant;!
Nm,]
Addition
1)Lj) Remodel
I Nobile Home
f - J7--f(C),. '
Date of Application
Contractors
. General !)-11 YYI tJ.;'.J
: Plumbing
Hechanical
EJ,ectrical
Supe.rv1::sin~.lnec t r.~c ia n
Bldrs Board Re,g.
Diva
7'a;r; Lot N
II <./-()(J
Hccq:pt .H
1<!-5-1 S
Phone: ;J, 3~ - / &0)
Zip: tj,) ;2()d-.,
Describe 1.'01'1<:
Address
')Le,/YVIA1ol_e-L
Value J, 0-0-0 . trO
. Lise . It
~
~,'~~\, ~
. l ."-
'.
.;",,'
Sigr:ed:
Date:
~)
(T' VI I ;r.:;Z1
I I - I
Exoires
Pl,nnf>
It is the responsibility of ths permit holder to see that all inspections are made at the propel' tim{;, that each .::.ddress is readabZe
from the street, and that. the permit card is Located at the front of the property. ,
~Bui!ding Divi:;ion approved plan~'::' . ",..,a-~the Building sitz at all times.
PIWCEDURE FOJLl..Nf}PECTION REQUE~~L 726-376~recorder) state your City designated job nw;;ber, job address, type of in3pec;iclI
requested ar.d when you will be ready jOF'""t'"nspection, Contractors or OWners 11GI7Je and phone number. Requests received befcre 7: 00 (Z':l
~iZl be made the same day, requests made after 7:00 am will be made the next :.JOrking day.
, . ',. .' (/c;l (j D" ,,--
I, Your City Desigr.ated Job Nwnber 10: 6 . d (:) J
Reauired Inspections
D' SITE INSPECTION: To be made after
excavation, but prior to set up of
forms.
D ' UNDERSLAB PLUMBING, ELECTRICAL &
, MECHANICAL: To be made before any
work is covered.
o
FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring concrete.
D
UNDERGROUND PLUMBING, SEWE,~~, WATER,
DRAINAGE: To be made prior to fil-
Zir.g trenches.
D; UNDERFLOOR PLU~mING& MECHANICAL:
To ,be made prior to instalLation of
f7.oor insulation or decking.
o
POST AND BEAM: To be made prior to
installation of floor insulation or
decking .
ROUGH PLUMBING. ELECTRICAL. & MECH-
ANICAL: No work is to be covered
,ur.til these inspections have beer.
made and approved. '
FIREPLACE: Prior to pZacir.g facing
materials and before framing inspec-
tion. , '
FRAMING: Must be requested after ,
approval of rough p~umbing, electri-
cal & mechanical. All roofing
bracing & chimneys, 'etc. must be
: completed. No work is to be con-
" cealed until thio inspection has
. bee,n made and approved.
D
o
-0
'0 INSULATION/VAPOR BARRIER INSPECTION:
, To be made after all insul..Ati~n aro.a
" " required vapor barriers are in place
, 'but before any lath, gypsum board or
wall covering is applied, and before
'.any insuLation is concealed.
'0 DRYWALL INSPECTION: To be made
after all dJ-oywaLl is in pLace,
, but prior to any taping.
0, MASONRY: Steel location, bond
beams, grouting or verticals in
, accordance with U.B.C. Sec'tion
2415.
D WOODSTOVE: After installation is
completed.
D
','
o
CURB & APPROACFI APf/ON: After' forms
are erected but prior to pouri11{J
con.::rete.
DEMOLITION OR !.:OVED BUILDIilrJS
:=J Sanitary se'.Jer capped ::It p~operty lir:e
:==J Septic tank p~ed and fil.led with gra~eL
I Final -' I.'hen above items are ccmpLeted
~ and when demolition is complete or stru~-
ture moved and premiaes cleaned up'~
I Nobi le F1cmes
~ Blocking and Set-~p
~ Plumbing connections -- scwer and water
~ Electrical Connection - Blocki,~, set-up
~ and plumbing conr.ections nr~st be approved
, before requesting ,electrical inspectio~
~ Acoessory Building
~ Final - After p~rches, skirting, decks,
~ etc. are completed.
D
A~l project conditions, such as ,the installation of street trees, c~~Letion of the
required Landscaping, etc., must be satisfied before the BUILDING FINAL can be r2questad.
o FINAL PLUMBING
o FINAL MECHANICAL
D FINAL ELECTRICAL
o
SIDEWALK & DRI1'EWAY: For all con-
crete paving within street right-
9f-WGY, to be made after all exca-
vating complete & form work & Bub-
. base material in pLaoe.
D FENCE: ~'hen complete -- Provide'
. 'gates or movable sections through
P.U.E. "
o
o
FINAL BUILDING: 7~e Final Building Inspection must be requested after the FinaL Plumbi,~
Electrical, and Mechar.icaZ Inspections have been m,ade and approved.
~ALL MANFlOLES AND CLEANOUTS MUST BE ACCESSIBLE, AD.lUST/IENT TO BE ~MDE AT NO COST TO CITY I Paile 1 of 2
.
I
II JOB NO.
L - C 0 G~
SOL A RAe ..c E S S R E Q.-
Type/Const:
Bedrooms:
., Ener{/I.! Sources
I iieat
I Water Heater
I Range
I Fireplace
I Wood::;tove
I
(, TUDe'
I kone:
I
Lot Sq. Ftg.
I
~ ~f lot CQVeragc
I
,II of Stories
I .
Total He'Lght
I
Topography
I
I
iTEM
Il/ain
Ibaae
I
CarpOl't
I
I '
i1ccessoru
I
I
,I
Occuoancy Grou.
I SQ.FTG
'/y I 1UI1 ti 17tA'"
UTOTA& VAW~' ()
I
p. D. C.
(vatue)
1.5 x
Building Permit
State surcharge
Tota l Chnroges
,I lITEM I NO.
II .
['LXtW'es
I ~esidentiai (1 bath)
II .
San'Ltary SeLler
I ~ater
II
Pl:'E
Plwnbing Permit
State SW'cr.arge
Total Char(les
ilTEM
~es. Sa. fta.
l~eLJ/Extend Circuits
I temporary Sel'lJice
II
NO. I FEE
Ele~trical Permit
State Sur~harqe
Total Charqes
iITSM
\ IFurnace ETU' S
\ !Exhaus t Hood
Ilvent Fan
Ilwoodstove
II
I
I
!
NO.
Permit Issuance
Me~hanical permi t
State SW'charoe
Total Charqeo
I! -- ENCROACHMENT --
i
Se~~rity Deposit
I
Storage
\1 .
Ma'Lntenance
i
Permit
i
I
I
I ~bcut
I kidewalk
II '
Fen:!e
I klectrical
I
flobile Home
Total Charqcs
Label
,
i
I j
I L'PA ,
AUnt1u,.." nllr:'. A
WT TYPE
Interior
Corner
Panhandle
Cul-de-sac
x
Value
/--/'-I- I 5 tJ I
;' ;
41,5c) I
j, , J:3
q /1 f) .3
CHARCE I
CHARGE
FSE
CHARGE
(.71,~3
I Lot Faces -
, Setbacks
I P. L. /louse Caraqe I Access.
INor th
lEast
South
Irleot
-- Fees
Building V~lue & Petmit
This permit in granted on the express condition that the said conotruction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning Ordinance, }'egulating the ccnstru~ticn
and use of buildings, and may be 'suspended or revoked at any time upon vic-
tation of any provisions of said Ordinances.
~
Plan Check Fee:
Date Paid:
Recdpt H:
; Signed:
Plumbing Pe'rmit
No person shall construct, install, aUer or change any new cr e:::isting
plwnbing 01' drainage syste~ in whole or in part, unless such person is the
legal possessor of a valid plwnber's license, except that a person may do
plwnbing work to property which is owned, leased or operated by the appli-
cant.
I
I ~
Electrical Permit
Where State &aIJ requires that the electrical work be done by an Slectrical
Contractor, the electrical portion of this permit shall not be valid until
the Label has been signed by the Electrical Contractor.
~
Me c h ani c a I Per mit
Plan Examiner
Uate
I HAVE CAREFUL&Y EXAMINED the completed application for pefflrit, and do
hereby certify that all information hereon is true and correct, and I
further certify that any ar.d all work perfor:ned shall be done in accor-
dance with the Ordinances of the City of Springfield, and' the L<r,,}s of the
~ State of Oreg~n p&rtaining to the work describcd herein, and -that NO OCCU-
PANCY will be made of any structure without permission of the Building Di-
vision. I further certify that o~Zy contractors and e~pZ~yees who are in
compliance with ORS 701.055 will be used on this project
~c~~~'O
~qn9d '
\
8h/89
D<fte / /