HomeMy WebLinkAboutPermit Fence 1984-5-29
.....
Rece-:.pt # "0 C. 9 fa S-
.. RESIC ~TIAL"
APPLICATION/PERMIT
225 North 5th Str~et
Springfield, Oregon 97477
Building Division
726-3753
" ,
Job Looation: )d)~::2.' ~ Y.u-d/.
Assessors Map # \ '"1CJ3 2- \eM T= Lot #
Suhdivision:
limer: ~~ .~~ ...
Address: ?:ic., /..- ~U ~
City: '.$pft cl
----
.I~p.ui
I I Addi tion
I I Remodel
I I Mobile Home
~ \ td'f)
Phone: 7 t! ? - J 2 <fg'"
Zip: q '7 l( '7 '7
Desoribe 1vorl<:
1~p~'.
'6'029~8i
AcUL.~ess
Date of Application
Contractors
General
PLumbing
Eleotrical
Meohar.io:::'l 0::..:.....~ ~
Construotion Lender ~
y
Value
-J;r:D.tYV
~'~
~J~ .O'()
Signed:
Date:
~
,<, - 2.51 . Vc1
Lisc.#
Exoires
Phone
It is the responsibi'lity 'of the permit houter to see that all inspeotions are made at the proper time. that ecoh ~ess is reaCQ0Ze
from the street. and that the perrrrit card is looated at the front of the property. .
*Bui!ding Division approved plan shall~ the Building sits at all times. '
PROCEDURE FOR INSPECTION REQUEST:CAra:726-3~recorder) state your City designated job nzm;ber. job adiress. type of inspec:;-z.cn
requested and when you will be ready for -z.nspection. Contractors or OWners name end phone number. Requests reoeived before 7:00 ~
",'i'lZ be made the same dey. requests mede after 7: 00 am wi'lZ be made the next ::JOrking day. '
Reauirp.d InsDp.otions
0, SITE INSPECTION: To be made after
exoavation. but prior to set up of
forms.
O UNDERSLAB PLUMBING. ELECTRICAL &
, MECHANICAL: To be made before any
work is covered.
o
FOOTING & FOUNDATION: To be made
after trenohes are exoavated and
forms are ereoted. but prior to
pouring oonorete.
UNDERGROUND PLUMBING} SEWER. WATER.
DRAINAGE: To be made, prior to fil-
,'lir.g trenohes.
[J
D.
UNDERFLOOR PLUMBING & MECHANICAL:
To be made prior to installation of
floor insulation or decking.
POST AND BEAM: To be made prior to
installation of floor insulation or
deoking .
ROUGH PLUMBING. ELECTRICAL & MECH-
,ANICAL: No work is to be covered
" ur.ti l these inspections have been
made and approved. '
FIREPLACE: Prior to plaoir.g facing
mcterials and before framing inspeo-
tion.
D FRAMING: Must be requested after
approval of rough plzm;bing. alectri-
,oal & mechanical. AU roofing
bracing & chimneys. etc. ~~st be
:' comp leted. No work is to. be oOn-
. .,~-cealed until this inspection has
~been made and approved.
o
D
D
Your city Desigr.ated Job Number Is:
D
INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulation ~~
required vapor barriers are in place
but before any lath. gypsum board or
wall covering is applied. and before
'any insulation is conoealed.
~ lj 637 &
, DEMOLITION OR :';OVED BUILDIilCS
:J Sanitary se'.Jer aapped at p~operty line
=:J Septia tank pUJ':rped and fill2d with gra;;eZ ,
~ Pinal - f>'hen above iteJ'ns are cC.'lTOleted I
.:J ... ~ ....... ..L.
and when ~emol"t~on ~s comp~e~e or s~~ua-
ture moved and premises aleaned up.
Mobile Hcmes
:=J Blooking and S2t-up
:=J Plumbing oonnections sewer ar~ water
~ Electrical Connection - Blocking. set-up
--.J and plumbing conneotions ~..st be approved
, before requesting eZectrical inspection
=:J Accessory Bui'lding
I Fina,l - Aftar porohes. skirting, deoks,
~ etc. are completed.
D
All project conditions. suo~ as the installation of street trees, co~letion of the
required landsoaping. eto.. must be satisfied before the BUILDING FINAL can be requested.
o FINAL PLUMBING
o FINAL MECHANICAL
o FINAL ELECTRICAL
[J
o
FINAL BUILDING: The Final Building Inspeotion must be requested after the Pinal P'lumbing
Eleotrioal. and Meohar.ical Inspections have been made and approvd.
o
DRYWALL INSPECTION: To be made
after all d.rywall is in plaoe.
but prior to any taping.
O MASONRY: Steel location. bond
beams. grouting or verticals in
aocordance with U.B.C. Section
2415.
D
WOODSTOVE: After installation is
completed.
*ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUST!fENT TO BE }'MDE t!T NO COST TO CITY I Page 2 of 2
D
CURB & APPROACH APRON: After forms'
are erected but p~ior to pouring
cOrUJrete.
o
SIDEWALK & DRIVEWAY: For all con-
crete paving within street right-
pf-way, to be made after all exca-
vating complete & form work & sub-
base material in place.
D
PENCE: h'hen complete -- Provide
gates or movable seotions through
P.U.E.
o
IJOB NO. &103 r-; (p
I Zone: . '
Lot Sq. Ftg~
% of lot Coverag~
# of Stories
Total Height
Topography
I
lITEM
I Main
SQ. FTC
Garaae
Carport
I Accessorl/
I
I
TOTAL VALUE
(vatucJ
S.D.C.
1.5 x
Building Permit
State Sux>charge
Total Charges
ITEM
Futu:t'es
I Residential (1 bath)
I Sanitary Sewer
Water
Plwnbing Perrr:it
State Sux>cr.arge
Total Charoes
ITEM
Res. Sa. fto.
New/Extend Circuits
Temporary Service
Ele~trical Permit
State Sux>~harge
Total Charqes
ITEM
Furnace ETU' S
Exhaust Hood
Vent Fan
I Woodstove
I
Permit Issuance
Mechanical perrrrit
State Sux>charae
Total Charoes
I -- ENCROACHMENT --
I Se(!"<A.rit1! Deposit
Storage
MaintenaruJe
Permit
Total Charoes
Curbcut
i Sidewalk
I Pen~e
I Electrica l Labe l
I Mobi le Home
I
I
1
TOTAL AMOUNT DUE: *
I
- ......tt...... -
L -CO G~
OcC!Upanc1! Crc
SOLAR f\rCESS REQ.-
Type/Cor.st:
Bedrooms:
I I Enerol1 Sources
I, Heat
I Water Heater
I I Range
I' Fireplace
I I Woodstove
I I
TUDe
LOT TYPE
Interior
Corner
Panhandle
Cul-de-sac
X Value
NO.
FEE
CHARGE
NO.
FEE
CHARGE
NO.
FEE
CHARGE
'-'; <t. (J/O
I
I
#/~.cJD
I Lot Faces -
I Setbacks
I P. L. House Carage
INorth
East
South
West
Access.
-- Fees
Building Value & Permit
This permr~t is granted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning Ordinance, regulating the construction
and use of buildings, and may be suspended or revoked at cny time upon vio-
lation of any provisions of said Ordinances.
*
*
P7..an Check Fee:
Date Paid:
Receipt #:
I Signed:
Plumbing Permit
No person shall construct, install, alter or change any new or existing
plwnbing or drainage syste~ in whole or in part, unless such person is the
legal possessor, of a valid plwnber's license, except that a person may do
plwnbing work to property which is owned, leased or operated by the appli-
cant.
*
Electrical Permit
Where State Len,) requires ty..at the electrical work be done by an Ele~trical
Contractor, the electrical portion of this permit shall not be valid until
the label has been signed by the Electrical Contractor.
I *
Mechanical Permit
*
I
I
I
r *
I
I
I
I
Plan Examiner
Uate
I HAVE CAREFULLY EXA~INED,the completed application for permit, and do
hereby certify that all in.formation hereon is true and correct, and I
further certify that any arn all work performed shall be done in accor-
dance with the Ordinances of the City of Springfield, and the L~~s of the
State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY wiZZ be made of any structux>e without permission of the Building Di-
vision. I further certify that only contractors and e~loyees who are in
compliance with ORS 701.055 will be used on this project
Q/}~A~~ I! .!i:.'.-UA
rfigned - V
5'29-&'1
Date