HomeMy WebLinkAboutPermit Plumbing 1982-1-13
,,~
RECEIPT # &. U 1?...'5l.n
... -- RESIDEN'T
<<OMBINATION/ APPtIC, _ON PERMIT
- SPRINGFIElD-
..
CITY OF SPRINGFIELD
225 ,~'O!?TH 5TH ST.'?EET
SPRI.'lGFIEr.D, OREC-ON 97477
BuiZdir~ Divisio~
126-3753
WiL~
Job Loc:ation:
\\~~
, (\ c (\1 ~ n f\ toll,
f
Subdiv1" sion:
.4ssessors Nap # /1 - O~- lL - t-/Lf
Ta;:: Lot # (7--1 (J(j
~'M.J38~
o '
Om" 4\(\j\ \ (-11\(1 \Jrlf}a.,~c
Add~cs \\~c:\ (\_0 ~ 0 f\~f\ ~y
City ~~ f\~~ 0 Q&) (C'\ l Q..
~~
~~
(\ (\(\\'\ (~.. ffi~-10 q 0 I
~~ U~
I ,Ve.'
I Addition
r Remodel.
Contrcrc:tors Name
CeneraL
Plwrrbing
(~l~JL-
EZ-eetri aa l.
f.!eehar.iecZ-
Constru::tion Lender
Phone # '7 L/lo-/c01 0
Zip ~lLr1,
s' /().(jO
.(
De8eribe Work
ti.~2cnt
Erpire8
Phone #
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all i~spections are made at the proper time, that each address is
readable frcm the street, and that the permit card is located at th~ front of the property.
* All manholes and cleanouts are to be adjusted at no cost to the City
SITE IllSPECTICN: To be made after I
excavation, but prior to set up of
forms.
UNDERSLAB PLUMBING. ELECTRICAL &
MECHANICAL: To be made before any
work is covered.
FOOTING & FOUIIDATION: To be made
after trenches are e::cavated a~d
forms ar~ erected, but prier to
pouring concrete.
UNDERGROUND PLUMBItlG. SEWER, WATER.
DRAINAGE: To be made prior to fil-
ling trenches.
mlDERFLOOR PLUMBING & MECHANICAL:
To be made prior to installution of
floor insulation or decking.
POST & BEAM: To be ~4de prior to
installation of floor insulation
or decking.
I, t
ROUGH PLUMBING, ELECTRICAL & MECH-
ANCIAL: No ~ork is to be covered
until these inspections have been
made and approved,
FIREPLACE: Prior to placing facing U
materials and before framing inspec-
tion.
WOODSTOVES: After installation
is completed.
FR.J\.MING: Must be requested after I
approval of rough plumbing. electri-
cal & mechanical. All roofing,
bracing & chimneys, etc. must be
completed. No work is to be con-
cealed until this inspection has
been made and approved.
CURB & APPROACH APRON: After forms
are erected but prior to pouring
concrete.
SIDEWALK & DRIVEWAY: For all con-
crete paving within street right-
of-way, tc be ~4de after all exca-
vating complete & form work & sub-
base material in place.
INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulation and
required vapor barriers are in place
but before any lath, gypsum board or
wall.coveri~g i~ applied, and beforel . ~OTHER INSPECTIONS: may be required
any ~nsu1at~on ~s concealed. ~I in accordance with Building Code,
, to be, indicated in ;:la~s or by no-
- tice from Building Inspector.
~~QJ'~~.l ~ ~J
DRYWALL INSPECTION: To be made
after all drywall is in place,
but prior to any taping.
MASONRY: Steel location. bond
beams, grouting or verticals in
accordance with U.B.C. Section
2415.
FINAL PLUMBING
All project conditions, such as the installation of street trees. completion of the
required landscaping, etc., must be satisfied before the BUILDING FINAL can be requested.
FINAL EL~CTRICAL
FINAL BUILDING: The Final Building Inspection must be requested after the Final Plumbing
Electrical, and Mechanical Inspections have ~een made a~d approved.
No occupancy of the premises can be made until the Final Building Inspection has been
made and approved, and a CERTIFICATE OF OCCUPANCY HAS BEEN ISSUED BY THE BUILDING DIVI-
SION AND POSTED ON THE PREMISES.
PROCEDURE FOR INSPECTION REQUEST: Call 726-3769 (recorder)state your City designated job
number, job address, type of inspection requested and when you will be ready for inspec-
tion. Contractors or Owners name and phone numbers. Requests received before 7:00 a.m.
will be made the same duy, requests made after 7:00 a.m. will be made the next working
day. YOUR CITY DESIGNATED JOB NUMBER IS: A..-.1nn.'1 ~
FINAL MECHANICAL
Page 1 of 2
JOB NUHEER
8f).(}( 'j ~,C)
ZONE
OCCUPANCY GROUP
Lot Squazoe :'tg.
:: of Lot Covered
" of Stories
:'ota~ Heigh~
i'opograp~y
Sa. "'tl7. '.~i"Ji1'! '"
Sq. :tg. Garage .::
Sq. Ptg. Car;ort :r
Sq. Ftg. A~ce=so~ :r
Sa. Pta. ."
Va~~e
,.-,
pg!'f'l"it Char~es
Sta:tp. SUP(!ht7T'l7p.
TOTAL CH.4.RGES
S~stem Deve~o~ment Char~e
1.5 = Vabe
Lvo.
Firtu1'es
rolate!' Service
I Sanita1"J S~~er
I
wY I6l.u.l.n , Q, ~ hJl (! r~ I
SUBTOT.4.L
State Swocharge
TOTAL CHARGES
NO.
Sa. Footaqe
N~ or e~tensicn/Circuid
Te~or~~ C~s~ction
SUBTOTAL
Stllte Swoaharae
TOTAL CHARr.ES
!lO.
Pu.1'>'llZC!€ - BTU'S
E:::haust Hood
Vent Fan
Wood Stove/Heater
SUBTOTAL
State Swoaharcre
TOTAL CRARGES
!:OEE
I FEE
ff
I
I
Page 2
~
REFERENCE Nt~BERS
TYPF!CONST~UCnON
L-COr, i:
BEDROO!-!S
I House
I
l
Ciarare Aaa<:!ssl
I
50:L::.'~es I
I ;~~;~~;::~e - i
.:)Q-~' I
I
I
I
I
Ty-pe Setbacks
Interior Lot Faces:
Corner P. Do
PlZI'!hand~e North
IJthe1' East
South
West
~ () , f./{)
Energy
I :.!r:?a.t
I ;/cter Heater
I ,::;ar.ge
Pool
FEES
BUILDING VALUE/PERMIT
This permit is granted on the ~i?ress c~ndit~on that
the said const1'U.cJtwn shall, in alZ res-=ecu, confor:
to the O!>dinar.ces adopted by the City 0;" Sp2--:.ngfie~d,
inc~uding the Zoning O!>dinanae, 1'e~A~at~ng ~~E con-
st7".lct'ion and use of u.l.ildings, al'lIi""!ay :'13 i>.ls-per.ded
01' 1'e~okgd at any time upon violati~n of an~ ~rcvi-
sions of Flaid Ordinances. . "
PIan Check Fee
Date Paid
Receipt #
PLUMBING PERMIT
No person sha~l construct, in8t2~Z. 2lter or change
any rzelJ or e:risting p~umbing or d:l'air.age sys"';em in
who~e 01' in part, unless such perso~ is "';he :ega~
possessor of a va~id plumber's licer~e, erae?t that
a person may do p~umbing work to pro?e1'~d wr.ich is
OI.Jn(]d, leased or operated by the ap:;7.icc:n.t.
ELECTRICAL PERMIT
Where State Laz..' requires that the e:ect:-icaZ work be
done by an EZeC!trical Ccntracto1'. the eZ-eat:-:.caZ- por-
tion of this permit shall not be vaZid untiZ the t.a-
be~ has been signed by the 2~eatricaZ. Contr~tor.
The E!ectrica~ Safety LazJ does not requi1'e a ?e:>son
to obtain a Zicense as an electrici=n. 1II"..d/or elec-
tricaZ .;JO"ltraator to make an e~ectr~C!a~ ins~.:ZZation
on property which is owned by himse7.f or a ~ambe:> of
his immediate famUy which is not ir:ten:ied .-';1' sa~e.
~ease or rent.
MECHANIC.4L PERMIT
Lot
i
i
i
I
- I
CHAI?GE
I
I.J.D... dO
/()oo
. LID
J n . u/"'t
FEE
CHARGE
E!lCROACHNENT
Secur-!.ty Deposit
Storage
I Maincnanae
Permit
':!'OTAL AP10U!lT DUE
C7.ll'b~ t
ISidawa lk
I F'~nag
I~lectrical Labe~
I
TOTAL AMounT DUE
I CHARGE
- ,
Plan Eraminer Date
I HAVE C.1REFULLY EXAMINED the completed application for pel'mit, and do
hereby certify that all information hereon is true and correct, and I
fwother certify that any and a~l work performed shatt be done in accor-
dance wtih the Ordinances of the City of Springfield, and the LazJs of the
State of 01'!)gon pel'taining to the work described herein. and that NO OC-
CUPANCY lViZZ be rrade of any st7".l.cJture lVithout pe!'m'ission of the Building
Division. I further certify that on~y contractors and employees who are
in compliance with ORS 701.055 lViZl be used on this pl'oject.
~~J
~ /..J
, "~/AA...-?~
,. St ~a , .' if ,
Buil ing Division appr~Jed~"l sha~~ remain on
times. 7"--
./- / ~ - '::1..
. ., bate ...-
the Building Site at a~~