HomeMy WebLinkAboutPermit Building 1985-1-23
-.:]
.. RES I D )~T I A l · .
APPLICATION/PERMIT
225 North 5th Street
Springfield; Oregon 97477
Building Division
726-3753
,I.,. ..
Job Loeation:
/3S'9
,Assessors Map #
Subdivision:
Reeeipt !I
13&1.((~(
'~~~~aJf'
'-
T= Lot # /7 () 3
!
:/
.. ~
2..'5 3:> / 0 ~' t)"Z:)
~?
"",,",Y;Jl> {)2'UJLJ @},I&..L 72l 0 pl. ~
Address: J ~ 0-Y (Q/1-1"_ d.Jq / '1,(/ ct. f/ Phone: 7 4 1- Ie ~ I q'
City, "~:(}1rfr-,!.'ll O'1Q Zip, 97</77
'41-J I'.~
)" %-~~ .
,.J I ../ ( . Ii (TtJ
, ,'. , . J j/</i p.. J. Value ij ___\-&0
I A@;L=~s~, ;;{}// '
LJ8 Kg J-< '.,~): \,,;~d7.' ()~
I
I I
1X1
I I
NAw
Addition
Remodel
Nobile Home
Date of Applieat1-on
I
I--Le.!I A/J/f1 AA_
Contracto1,'s
General ~
Plumbing \j '.
I, Eleetriea l
Mechar.ie.:zZ
Const1'Uetion Lender '
DeseX'ibe .I'ork:
a-xtL
Signed:
Date:
"~tf /
1// /~r
Lisc.!!
-; ssCI
(
Expires / .-Phorrr:--........
'3/1S-J.?\-C lSl~~ :Sd~
It is .theresponsibility of the permit hoUier to see that all inspections are made at the proper time, that each'~ess is readab:e .
from the street, and that the pePmi t card is Zocated at the front of the property.
*Bui!ding Diviaion approved plan shall remain on the Building Site at all times.
PROCEDURE FOR INSPECTION REQUEST:CALL 726-3769 (recorder) state your City designated job nwr;ber, job address, type of inspection
requested and when you will be ready for inspection, Contractors or OWners name and phone number. Requests received befere 7:00 ~
",'ill be made the same day, requests made after 7: 00 am 1Ji II be made the next :,Jorking day.
Reaui~Ad TnsDActiens
SITE INSPECTION: To be made
excavation, but pX'ior to set
forms.
o
o
after
up of
UNDERSLAB PLUMBING, ELECTRICAL &
. MECHANICAL: To be made before any
work is covered.
1M
FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouX'ing cencret~.
UNDERGROUND PWMJ3ING~ SEWER. WATER,
DRAINAGE: To be made prior to fil-
,ling trenches~
o
o
UNDERPLOOR' PLUMBING & MECHANICAL:
To be made prior to 'installation of
!zoor insulation or decking~
POST AND BEAM: To be made pX'ior to
installation of floor insulation or
decking .
ROUGH PLUMBIHrCELECTRIC~ MECH-
ANICAL: No worK""'is w Ve covered
,until these inspections have been
made and apprqved.
FIREPLACE: Prior to placir.g facing
materials and'before framing inspec-
tion.
" ~ I FRAHING: Must be requested after
~ approval of rough plumbing, electri-
cal & mechanical. AU rOOfing
, bracing & chimneys, etc. nr~st:be
'completed. No work is to be con-
-,,~cealed until this inspection has
, ~.been made and approved.
~
~
D
!
10
l
,
!D
!~
!I
I
i
1[J
i!
;
Your City' Desigr.ated Job Number Is:
I \.It ,. INSULATION/VAPOR BARRIER' INSPECTION:
" To be made after all insulation ar>.d
'. required vapor ba:r>riers are in place
.;' 'but before a:ny lath, gypsum board or
lJall covering is applied, and before
a:ny insulation is concealed.
~
DRYWALL INSPECTION: Te be made
after all drywall is in place,
but prior to any taping.
MASONRY: Steel location, bond
beams, grouting or verticals in
accordance with U.B.C. Section
2415.
8.s:vo 7()
DEMOLITION OR NOVED BUILDIilGS
~ Sa:ni tary ,se'.Jer Clapped at p~opert"'d line
~ Septic tank pumped and filled with gravel
Final - .{hen above items are cempleted
and when demolition is complete or struc-
ture moved and premises cleaned up.
. Mobi le Hemes
=:J Blocking and Set-up
. =:J Plumbing connections sewer and water
~ Electrical Connection - Blocking, set-up
---l and plumbing connections nr~st be approved
before requesting electrical inspection
::::J Accessory Buiiding
~ Pinal - After porches, skirting, decks,
~ etc. are completed.
o
FINAL PLUMBING
All project conditions, such as the installation of street trees, co~letion of the
required landscaping, etc., must be satisfied before the BUILDING FINAL can be requested.
FINAL MECHANICAL
(8;
FINAL BUILDING: The Final Building Inspection must be requested after the Pinal Plumbing
Electrical, and Mechanical Inspections have been made. and approved.
FINAL ELECTRICAL
. . I, .i
'ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUST!1ENT TO BE M1DE I!T NO COST TO CITY Page 1 of 2
o
D
WOODSTOVE: After installation is
completed.
D
CURB & APPROACH APRON: After forms
are erected but prior to'pouring
conorete.
D
SIDEWALK & DRIVEWAY: For all con-
crete paving within street right-
of-way, to be made after all exca-
vating complete & form'work & sub-
base material in place.
D
PENCE: h'hen complete'-- Provide'
gates or movable sections through
P.U.E.
o
"
rc:.ae 6
IJOB NO. &\"00 70 SOLAR "~GE.s,,~, REQ.- v
I Zone: IX L Oc:aupanc:y Gro",-p':_"'""-, f<. ~
'- - I Lot Faces -
I Setbac:ks
I P. L. House Carage
INorth
East
South
West
Lot Sq. Ftg.
% of lot CQVerag~
# of Stories
Total Height
Topography
i ITEM SQ. FTG
I Main A-b1) S,~, I 3 2-
Ga:raoe
Carport
~~+
Ac:c:essoru
I
I
ISoD.c.
TOTAL VALUE
(va~ue)
1.5 x
Building Permit
State Surc:harge
Total Charges
lITEM
I Futures
I Residential (1 bath)
I
I I
1:1
I I
Sanitary Sewer
Water
Plumbing Perrr:it
State Surc:r.arge
Total Charoes
I ITEM NO. I
I Res. Sa. fto.
I Naw/Extend Ciraui ts 1
I Temporary Sepvic:e
I
Elec:tric:al Permit
State Surc:harge
Total Chm>qes
I NO.
"
"
LOT TYPE
Interior
Corner,
Panhandle
Cul-de-sac:
x Value
~5~ 33$--0
sqp / l'PO
4-5~-o -1
32~1
I )..&1
3.3 2.& *
FEE
CHARGE
I
I
FEE CHARGE
/0 gO It) fX)
I
I
I / () Qr.?
I .+0
1/0+0
ITSM I NO. FEE CHARGE
Furnac:e ETU'S I
&haust Hood I I
Vent Fan I I
Woodstove I I
I \1
Permit Issuanc:e
Mechanical Permit
State Suraharae
Total Charo,?s
-- ENCROACHMENT --
Se~~rity Deposit
Storage
Maintenanoe
Permit
Total Charges
CuPbaut
I Sidewalk
Fenoe
Electriaal Label
I Mobi le Home
TOTAL AMOUNT DUE: *
I
I
I
I
I
I,
,-
I
I
I
+3,~b
\~;...
L-CO G~
\..~-
~-N
I Enerqu Souraes
I Heat
Ac:c:ess. I Water Heater
I Range
I Fireplac:e
I Woodstove
.1
Type/Const:
Bedrooms:
TUDe
Fees
Building Value & Permit
This permit is granted on the express c:ondition that the. said c:onstruction
shall, in all respec:ts, c:onform to the Ordinanc:e adopted by the City of
Springfield, inc:luding the Zoning Crdinanc:e, regulating the construc:tion
and use of buildings, and mc:.y be suspended or revoked at any time .upon vio-
lation of any provisior:s of said Ordinances.
*
Plan Chec:k Fee: J <0 r::ro
I ~/,,-is.-/
b4'/af1
(.~
Plumbing Permit
Date Paid:
Recdpt #:
I Signed:
f
I
I
I
I
l *
No person shall construc:t, install"aZter pr c:hange any new or existing
plumbing or.drainage syste~ in whole or in part, unless suc:h person is the
legal possessor of a valid plumber's lic:ense, exc:ept that a person may do
plumbing work to property whiah is owned, leased or operated by the appli-
c:ant. '.
Electrica I Perm it
I
I
I
I
I
, *
I
Where State Law requires tr~t the elec:tric:al work be done by an Electrical
Contrac:tor, the elec:tric:al portion of this permit shall not be valid until
the label has been signed by the Electrical Contrac:tor.
Mechanical Permit
I .
I
I
I
I
I
I
, *
&~.~~/~
;/2'3 /~5
7RiJI e f
I
I' I HAVE CAREFULLY EXAMINED the aompleted application for permit, and do
I hereby certify that all info~tion hereon is true and c:orrect, and I'
further certify that any ar.d all work performed shall be done in ac:cor-
I dance with the Ordinanc:es of the City of Springfield, and th~ L~~s of the
~ * State of Oregon'pertaining to the work desc:ribcd herein, and that NO OCCU-
PANCY will be made of any struc:ture without permission of the Building Di-
vision. I further certify that only contractors and e~loyees who are in
c:omplianc:e with ORS 701.055 will be used on this projec:t
~~__k. f:/~
Sig(zed ",
{).o-\_ 2.3 )1&~
~te I
*