HomeMy WebLinkAboutPermit Plumbing 1988-2-29
'"..---" ,'f
.. RES I rr' J \I T I A L · ·
APPLICATION/PERMIT
225 North 5th Street
Springfield, Oregon 97477
Building Division
726-3753
'~" -..-'~-
SPRINGFIELD
~
Job Location: 14- C:. '1
Assessors Map # 11 03
~ ~ \-- -t' ~~ V\ \ u.J
~ 5 33 'I T= Lot #
I
lfuu. ec. ~"",,-JJ
II. ~ -::r ",-\a.."A .
~~ J c>~l
Subdivision:
Ol.mer:
Address:
Ci ty :
Ne1J
Addition
KpLJltL~
. ~ ~ I
, bsr
I
I
Pl.wnbing '\)yLLlYl ~c=. SEP"O eJ
I
I
I
It is the responsibiZity of the permit holdb. to see thO.t aH inspections are made at, the proper tims, that each ;;:.dd:ress is readabZe
fzoom the street, and that the permit card i..! l.oaated at the front of the property.
*Bui!ding Divi=io~ approved pl.an shall remain on the Building sits at all times.
PROCEDURE FOR INSPECTION REQUEST:CALL 726-'3769 (recorder) state your City designated job m07:ber, job adi:ress, type of inspecticn
requested ar~ when you will be ready for indpection, Contractors 01' Ol.mers name and phone nwnber. Requests received cefere 7:00 ~
;..'iH be made the same day, requests mc.de after 7:00 am wiU be made the next ;,Jorking day.
~Olll
~l ~roje;t-::nd~tions,-::ch ::-the~stallation of street trees, co,~letion of the
requ'ired landscaping, etc., must be satisfied before the BUILDING FINAL can be requested.
I .
FINAL BUILDING: The Final Buil.ding Inspection must be requested after the Final. Plumbing
Electrical, and Mechanical. Inspections have been made and approved. '
*ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUSTNENT TO fJE 1.!.~DE t!T NO COST TO CITY
I
I
Remodel
Nobi le Home
Date of Application
, , ,(;2 ~ <5:2 CI':-~
Contractors
General
Electrical
Mechar.ical.
Constl'Uction Lender
Reauiped Insvections
D '. SITE INSPECTION: To be made after
excavation, but prior to set up of
forms.
O UNDERSLAB PLUMBING. ELECTRICAL &
: MECHANICAL: To be made before any
work is covered.
o
FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring concrete:.
ffJ'
0:
UNDSRGROUND PLUMBING. SSWER. W,4TER,
DRAINAGE: To be made prior to fil-
Zing trenches. ?-t,o
UNDERFLOOR PLUMBING & MECHANICAL:
To be made prior to installation of
, floor insulation or decking.
o
POST AND BEAM: To be made prior to
installation of floor ins~lation or
, decking.
ROUGH PLUMBING. ELECTRICAL & MECH-
. ANICAL: No work is to be covered -
,until these inspections have been
made and approved. '
FI.'?EPLACE: Prior to plc.cing facing
materials and before framing inspec-
tion.
D FRAMING: Must be requested after
approval of rough plumbing, electri-
cal & mechanical. AU roofing.,
bracing & chimneys, etc. ~~st be
:' comp leted. No work is to be con-
<~.cealed until this inspection has
. bee~ made and approved.
D
D
~.,
0' FIlIAL PLUMBING
D
D
,0
FINAL MECHANICAL
o
FINAL ELECTRICAL
//5-00
Phone:
/.p~l - 4-0 I ()
Q14--0\
Zip:
Describe fiork:
. ~',. '1Jr~
-ra-.p . L-fD '
~
-fD
Value
Address
lS'5DOD ~(~ +l~
~i art- Cf 1tlos
Your City Desigr~ted Job Number Is:
[J. INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulation a~~
.' required vapor barriers are in place
, but before any lath, gypsum board 01'
wall covering is applied, and before
~y insulation is concealed.
[]
j
OJ
DRYWALL INSPECTION: To be made
after all drywall is in place,
but prior to any taping.
MASONRY: Steel location, bond
beams, grouting or verticals in
accordance with U.B.C. Section
2415.
OJ
I
OJ
I'
OJ
WOODSTOVE: After installation is
ccmpleted.
CURB & APPROACH APRON: After forms
are erected but prior to pouring
concrete.
SIDEWALK & DRIVEWAY: For all con-
crete paving within street right-
pf-way, to be made after all exca-
vating complete & form work & sub-
, base material in place.
[[]
I
CD
PENCE: h~en comple:te Provide
gates or movable sections through
P.U.E.
Recdpt If.
/ 100 ~
()/C .
\
"\
?)'2,O
I" \
~/I
Signed:
Date:
dJL
~-~'9-CY
Lisc..#
Phone
Exoires
3G:,CI fjJ;(5()
'1 !~l'8'~
DEf.JOLITION OR ,'.JOVED BUILDINCS
~ Sani tary se'.Jer C!apped at px:.ope:rt'd line
~ Septic tank pu~ed and filled with gra~el
----, Find - f\~en above items are completed
~ and when d~olition is complete or struc-
ture moved and premises cleaned up.
Mobile Homes
~ Blocking and Set-up
~ Plumbing connections sewer and water
~ Electrical Connection - Blocking, set-up
~ and plumbing connections ~~st be approved
, before requesting electrical inspection
=:J Accesso!"d Bui lding
----, Final - After porches, skirting, decks,
~ etc. are completed.
D
J
I Page 1
of 2
-'.~
-;;:.".-
I JOB NO.
I Zone: -
Lot Sq. Ftg.
~ of lot Coverage
# of Stories
Total Height
I Topography
I
I ITEM SQ. FTG
I Main
Caraae
CCU'Port
Accessorl/
I
I
IS.D.c.
TOTAL VALUE
(va~ue)
1.5 x
Building Pe1'lT1it
State Surcharge
Total Chaz>ges
lITEM
I Fi:r:tuI'es
IResidential (1 bath)
Sanitary Sewer
Water
I
Plwnbing Per>n:it
State Surcr.aI'ge
Total Charaes
'lITEM
I Res. Sa. fta;
I Naw/Extend Circuits
I Temporary Service
Eleatrical Pe1'lT1it
State Suraha:l'ge
Total Charqes
lITEM
I Furnace ETU' S
I Exhaust Hood
I Vent Fan
I Woodstove
I
Pe1'lT1it Issuance
Meahanical Permit
State Surcharae
Total Charaes
-- ENCROACHMENT --
Se~~rity Deposit
Storage
Maintenaru::e
I Permit
Total Charges
I Curbcut
I SidetJa lk
I Fen:Je
I Electrical Label
I Mobi le Home
,I
I
TOTAL AMOUNT DUE: *
SOL A RAe C E S S R E Q.-
Occuvancl/ Gre"
WTTYPE
NO. I
I
I I
Iwl
I I
l.: 'I
NO.
NO.
FEE
$ClI
, 'I *
I
I
I
~o.oOI
I
I
,. ~
l.oOI........S.
~I.OOI*
Interior
Corner
Panhandle
Cul-de-sac
x
Value
FEE
CHARGE
FEE
I CHARGE
I
I I
I I
I I
I I
I I
I l *
CHARGE I
I
I
I
I
I
00
:---
Page 2
.....
L -CO G~
I
I
!
I
I
I
I
J
!
Type/Const:
Bedrooms:
I Enerq}/ Sources
I Heat
I I Water Heater
I I Range
I I Fireplace
I I Woodstove
I I
TUDe
Lot Faces -
P.L.
Worth
East
South
IWest
Fees
Setbacks
House Carage
Access.
I
I
I
I
I
Building Value
& "Permit
This pernr:t is granted on the express condition that the said construction
shaU, in all respects, confoTm to the Ordinance adopted by the City of
Springfield, incZuding the Zoning Ordinance, regulating the construction
and use of buildings, and may be suspended or revo~ed at any time upon vio-
~tion of any provisions ofisai~ Ordinances.
, .
1 *
J
Plan Check Fee:
Date Paid:
Re.ceipt .#:
Signed:
f' ..
t
Plumbing
Pe r m it
No person shall construct, instalZ, alter 0'1' change any new or existing
plwnbing 0'1' drainage syste~ in whole or'in part, unless such person is the
legal possessor of a valid plwnber's license, except that a person may do
plwnbing work to property wh{ch is owned, leased or operated by the appli-
cant.
Electrical Permit
.Where State Law requires tr~t the electrical work be done by an Electrical
Contractor, the electrical portion of this peTmit shall not be valid until
the Zabel has been signed by the Electrical Contractor.
Mechanical Permit
I *
I
r
Plan Examiner
Vate
I HA VE CAREFULLY EXAMINED the completed application for peTmit, and do
hereby certify that all infoZ'mation hereon is true and correct, and I
further certify that any ar.d aU work performed shaU be done in accor-
dance with the Ordinances of the City of Springfield, and thz L~~s of the
* State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY will be made of any structure without peTmission of the BuiZding Di-
vision. I further certify that only contractors ar.d e~ployees who are in
compliance with ORS 701.055 will be used on this project
, ..r2~ A- ~
* ~ned~
'~-:-'A1-f'P
Date
" .. . . ~;. '" "., .~.