HomeMy WebLinkAboutPermit Building 1993-11-1
COMMERCIAL/INDUSTRIA'
PERMIT APPLICATION
.
JOB NUMBER "95/~6S1
INSPECTION LINE: 726-3769
OFFICE: 726-3759
225 Fifth Street, Springfield, Oregon 97477
"
L09ATION OF PROPOSED WORJ<' 765 North A St.. Springfield. OR 97477
ASSESSORS MAP: ] 7 0115 4 7
OWNER: Willarnalane Park & Recreation District
ADDRESS: 151 North 4th St..
CITY: Snrinp"fipl d
TAX LOT
4600
PHON F' 726-4115
STATE' Oregon
ZIP' 97477
NEW
REMODEL
x
DEMOLISH
DESCRIPTION OF WORf<" Construction of exterior ramn and new rest room.
VALUE:
ADDITION
NAME
OTHER
ADDRESS
PHONE
ARCHITECT: Rohertson/SherwoorljArchitert.~ nr. 132 ERst Rro;:!clwRV. Suite 540. EU2:ene.
CONST,
CONTRACTOR'S NAME ADDRESS ~ CONTRACTOR'
,.; -3 ~~ W //.. :::vc .
GENERAL:/,;'Ao"P hf./"facs.-./ '/"">' -~~~~.~.7Y'''''':', ~:?<:?~
PLUMBING'
MECHANICA' .
ELECTRICAl'
I PLlJMRINO
I NO. FEE
I 2 Single Fixture ,/p
I Relocated Bldg.
(new fix, addtl)
"1 Water Service
II.
Sanitary Sewer
II.
~' Storm Sewer
II.
Backllow Device
CHARGE I
20.--1
I
I
I
I
I
I
1
I
I
I
.....1
I~'
TOTAL PERMIT
,
OUAD AREA'
~0~lJ
- OFFICE USE -
LAND USE: 5:J:jU
HANDICAP ACCESS:
FLOOD PLAIN'
ZONING' 91 0
. OF BLDGS:
. OF UNITS:
CONSTR. TYpo.
HEAT SOURCE:
OCCY GROUP:
. OF STORIES:
SO. FT.
S/SO. FT.
SO. FTG MAIN
SO. FTG ACC ES~
x
x
.'
SO..FTG,OTHER
, ..
x
\
P~FF./ul/J~--r:'/~ RCPP /~ /7'
I BUILDING PERMIT
15% State
SurcharQe
I MEC~ICAL/~
/~./'??/+.
I' 5% State
Surcharae
I PAVING
-z 3(5. _0 I PLUMBING
/J """ 15% State
vr . - /~ Surcharge
IfP_P"- 1 FENCE
/5"_- VALUE S
SIDEWALK
_7~
CURBCUT
{.:....
(,' -:. ~.
. ~.~ ....
EXPIRES
..0--~'- :r<Zf-~ E,I.JG:<:;- <',.'as:
PHONE
~
MECHANICAL
O"E
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
> 100,000 BTUs
........-
Floor furnace and vent
Suspended wallar floor
mounted unit heater
Appliance Vent
separate
Stationary evap,
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg,
Mechanical exhaust
hood and duct
4?//Y .
Permit Issuance
TOTAL PERMIT
liGHTING POWER BUDGET:
WATER HEATER:
VALUE
S2€i_000_(est
~~?
342-8077
OR 97401
I
('!-IannI:: I
I
I
I
I
I
I
,?,-;: -=1
I
I
I
S10.00 I
,/~--: ""? I
"
:,
TOTAL VALUE OF PROJECT .:::?~ ..$5'9-::>
DAT" ?-:<7-9?!i' BY ./2--,;r
,-/
~.-
DEMOLITION
I
.~7r~~~- ~ I
&~~ AY~.~
SUBTOTAL /" ~ />:1
PERMITS ....O:::....~""
g~~~EL~~MENT /1--<.!L3o'1 ~
'.. . '.:'.' '. ; ?p -b-/Y-'73 /
TOTAL PE~~i;: ;:E~S I /~~~4';.f-
EXCLUDING ELECTRICA' ...... ~ tp''''<;> ,
/.. .--6
FT
FT.
.REaUIR~D INSPECTIONS .
It Is the resp'onSlbility ''of the permit holder to see that alllnspectlons are made at the proper time. To request an Inspectlon, call
726.3769 (recorder), state your City designated Job number, Job address, type of Inspection requested and when you wilt be ready
for Inspection. Requests received before 7:00 8,m, wilt be made the same working day, requests made after 7:00 a,m. will be made
the following work day,
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms,
.>(
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
PAVING: After graver Is In
place but prior to placing
asphalt or concrete.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work Is covered,
ATTIC DRAFT STOPS &
CURTAIN WALLS
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special Inspector shall be employed
by the Ownerl Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTURAL CONCRETE: In
excess of 2500 PS.r. (306 a,1)
x:
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel In place, but
prior to placing concrete.
x
FIREPLACE: Prior to placing
facing materialS and before
framing inspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are In
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved,
STRUCTURAL WELDS:
Performed on the job. (2722 f)
CONCRETE SLAB: To be
made after all Inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
In place but before any
concrete is placed.
INSULATION',&, VAPOR,: ~ '.
8ARijIER::To, be mad,a 'after: all ,~.....~ __-v, ~'
Insulation and required vapor -
barriers are In place but
before any lath or gypsum
board Interior walt covering Is
applied. .
HIGH STRENGTH BOLTING:
During alt bolt installation and
tightening operations, (306
a.6) "
... ~. ......
. ~.. .".... ":".-,J ..':.....
SPRAYED ON
FIREPROOFING: U,B,C,
Standards 43-8.
UNDERGROUND: Plumbing.
electrical, gas, sanitary sewer,
storm sewer, water and
d ral nage Ii nes. To be made
prior to covering or Ht\lng
trenches.
UNDERFLOOR: Piumbing,
electrical, mechanical. To be
made prior to Installation of
floor insulation, decking or
floor sheathing.
FIRE & SEPARATION WALL:
Located and constructed
according to planz,
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork, (306 a.11 &
Chapter 29)
v
LATH ANDIOR GYPSUM
BOARD: To be made after ,all
lathing and gypsum board,
interior and exterior, is In
place but before any
plastering is applied or before
gypsum board Joints and
fasteners are taped and
finished.
GLU.LAM BEAMS: Inspection
Certificate by an approved.
agency, furnished to the City's
Building Division before
beams are placed, (2501 UBe.
STDS. 25,10,11).
POST & BEAM: To be made
prior to installation of floor
Insulation, decking or floor
sheathing.
STRUCTURAL MASONRY: (306
a.7)
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor sheathing.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub.base material in
place,
.In addition to the Inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415,
ROOF SHEATHING AND
NAILING: Prior to Installing
any roof covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
-------------_._---------------_._--------------~---------
. ,
x
FINAL PLUMBING
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish Inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this Inspection.
)( FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved, No occupancy of the premises can be made until a
Certificate of Occupancy has been Issued by the Buitalng Division
and posted on the premises.
y
FINAL ELECTRICAL
y
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS:
PLANS REVIEWED BY
~;1
"'
,~ DATE /,6-5'"-9 ~
(
By signature, I state and agree, that I have car!3fulty examined the completed application and do hereby cert!fy that all Information
herein is true. and correct; and I further certify. that 'any and all work performed shall' be done In accordance with the Ordinances,
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division, I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project. .
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
street, that the permit card is located at the front of the 'property, and the approved set of plans will remain 'on the site at all
~::':i:~~lnV(2:' If ~ , - Date jj- j - f?
VALIDATION:
. .'. ." ..,.. ~~~,'2.o/(>.oc'/'""'''f.)
AMOUNT RECEIVED: ~C)Io.I~ DATE PAID:
/"':>.7<!S"
RECEI PT #: I ()f:2.,0 RECEIVED BY:
,p-",,..~ ~
II->..;--CI.~ ~
1,Q3