HomeMy WebLinkAboutPermit Correspondence 2007-9-10
~jllliJISfll
Jif{-<-".'-<' ~.
~ aUllDiriG co.
Transmittal Cover Sheet
Detailed, Grouped by Each Transmittal Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
Date: 9/10/2007 Reference Number: 0337
Transmitted To
Robert Castile
City of Springfield
225 Fifth Street
Springfield, Oregon 97477
Tel: (541)726-3666
Fax: (541)726-3676
D Acknowledgement Required
Transmitted By
James Thomas
Wildish Building Co.
3110 Pierce Parkway
Springfield, Oregon 97477
Tel: (541)736-5843
Fax: (541)736-7716
Package Transmitted For
Information, As Requested
Delivered Via
Hand
Tracking Number
Item #
001
Qty Item
1.00
Reference Description
Set of structural field
""." Questions through 95
Notes
Status
Cc: Company Name
Contact Name
Copies Notes
Remarks
Attached are all the answered structural field questions to date. I will put you on the E-mailing roster for future responses.
Please call me if you need anything else.
1-/~1J 7
Signature
Signed Date
JL T _Projects
Page 1
II'
~rImlSflr
~
~ BUILDING CO.
. ._- ~
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
~~]._....i'lllll~, ......
Transmitted To
Mark Danielson
Barrentine Bates Lee, AlA
200 North State Street
Lake Oswego, Oregon 97304
Tel: (503)607-0494
Fax: (503)635-3581
o Acknowledgement Required
Package Transmitted For
Comments
Item #
001
Qty
1
Item
Request For
Information
Reference
Number: 041 -
Date Created:
6/11/2007
Cc: Company Name
Transmittal Cover Sheet
.. ...... ,., ""'" I, ., .,., ,L ". I.. JII".1II111', ~II I I I I_II __I..IJ.:'l2._.lf_
Detailed, Grouped by Each Transmittal Number
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
_ .... _._.Ii!!i!iLL.~
Tf'ansiTlittedBy
James Thomas
Wildish Building Co.
3110 Pierce Parkway
Springfield, Oregon 97477
Tel: (541)736-5843
Fax: (541)736-7716
Delivered Via
Electronic Mail
Description
Structural Foundation
Questions
.r.lt:,l~'DI~
Tracking Number
Notes Status
Required: 6/18/2007 ; Answered:
Contact Name
Copies Notes
Remarks
Please respond to this RFI as soon as possible.
;1~~
Signature
Printed on: 6/11/2007 JL T _Projects
Prolog Malfager
G -/1.07
Signed Date
Page 1
,
kW1lMDlSHI
~
BUILDING CO.
- ,
Request for Information 041
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
I~~L ..',..,.i.,..~
Answer Company
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
Answered By
......!l'l!L.-t...-&L...,
AuthorCornpany
Wild ish Building Co.
P.O. Box 7428
Eugene, Oregon 97401
Author RFI Number
......-r.'m~Aor..~.:fnfBm
iIII
Authored By
Tony Dean
Co-Respondent
Subject
Structural Foundation Questions
Discipline Category
Cc: Company Name
Contact Name Copies Notes
Question Date Required: 6/18/2007
1. Reference S-1 01 A The plan shows a east-west dimension of 8'-9 1/8" above the elevator pit. Please clarify what this
dimension corresponds to.
The step near the elevator pit for the footing indicates a 2'-6" elevation difference. Can we make this one step @ 2'6"?
2. Reference Detail 3, S-503.
We would prefer to install the vault walls using epoxy dowels installed at a thickened slab area as sketched (attached).
This would allow placement of Tilt Wall panels in this area. Would this revision be acceptable?
3. Detail 15/S502, Same question as above.
4. We suggest using a feature strip for the tilt wall panels as shown below. The panels have a 3/4" gap at the panel
joints. Acceptable?
Suggestion
j/y
~ '
't:;z::: %
3/'1 CNllrn;~:fI'
Date Answered:
Answer
Prolog Manager
Printed on: 6/11/2007 JL T _Projects
Page 1
I.fl 0
f" bc.<::)
, '1-b
. ~"
r
~o ~
1Y ·
P. 5-501, f'
-i~
4 ~.
5 ';J<
5-501 '.J
J
s
W
PIT
<9 .
",/ 7' -~ ·
""
L~--10
r
~ .
L -- --10
- TOP 0' SLAB
BEVOND
~~
-fit. 96u41c!j'-BIf
l.~lS4lfJrvrl' _0"
~ I (:n ~'''_ 5"
~kADEb STU~S
tJ till I).e. (~LV.)
LOCATE AT ,,"-I)" o.c.
__ 1'4 @ 121" c.c.
wI (2) AT TOP
or WALL
c _ TPP OCJ~
[L. Rtr.-PI.AN
r
__ ~4 DOWELS
@ 12<> c.e.
f""Ilo rt5lDT
~!:1.1..l 11
:..-1 ~ :
F ~ '
IIt;l ~:?!t MATC~
Ir......I[_. .f-....u.' :....... ~ :: :~::. '
I~l ' .,j;l! t . / , eACH. WAY,
/-_........ ..... ....-~,;:..~......~..r.rll...~.: .E..,-..,.~J...,..'......... ....../ '...'
~"..... 'H"~;..3 .....~. ~ to \0
~~~ J~5t:l~e~ . : j:3 '" ~,~ ~~ 1'; \/r-"~ ~
~EOUIItEMENTS
(14 * $" O.!l. '_
E'ACH WAY AND
STAGGItRED IN
FACH FACE
~f.t @
(3) ilS CONT. "'-
o
t f .' "1'
SIEdtrn~QN AT VAULT
"'0'''1", "",-"'. ',,;"'._"
1"=1'-Q"{ i
!
!
S'5"O~>
I
f
!
(}4 II 8'-0" 11) a" o.c.
TOP CEN'TER ON BEAM
~
.1
....
t .........-...
. "- III
1-.. ...
"r ...::: :L:'
~.--. ...
. -- -.....
~ I:. .tr. "-.. -14 II [)@7"o.c.
~~~-,,",,)ru I ~
,,,..-: " ....... -/ CONe. BEAM 'III (4)
CUt. ., --..... ~9 CONT. BOTTOM AND
lYP '"'-4" 4) jB CONT. TOP
OTl'OM BARS TO DRILL
AND EPOXY 5" INTO
VAUL 1 WALL lOP $ARS
TO HOOIC (TURN HOOKS
HORIZ.)
,..-.....
~nI\.Of" DIe lUUJ A ii A OA\JjQ \.1 h I DB T
fli
~
~
(1)
~
o
~
""Q
J~
~. .<
~..
~ i
o ~
~;
= ~
~, ~
..,.'''~~'--,...,...
r '" . ,......"__"..h<.. ....<....,............ ..... '
i DMWN. WLM I
; ClmCm:BD: Dr
: PLmJUCTNo: 203323.10
; DA'rn: OIi.08.07j
. .. ~"'~..~~ "..,.... ,..i:I:Iqlo
SHEET
Saa503
~
'i
1
: ;j
'~ I
i
i
! !
i i
i
Ii
Ii
il
U
II
1i
I
I ,;'
i
II
i
I<c;\Hif:- ~ J jV1 'Ie ~~o3
A.{ ((((VhS tr~
OtI"''''Ot
'"
I , :/- 3....V ~ . .
, I I ~1 u SLAll O~ADE
SIDEWA~~ ~ ~ ~:~~ : .:. I.A .... _. C REF. PLAN ..
D ~-! ~ =~. ;::I~~ '1 4"' -..
I.D , ,. r. V.LllI""....~,;- ~.ij~ lor.,. t.\ f..
\_--~-- -; Jj. -
. . ;r-'-
. i J
TOP OF FOOlING,!",\
BEVOND H '!j _ t
,
}
---- ~4 C @ 16'" 0,0.
--....... (3) 114 COUTo
"-4"
@
$ECTION AT ENTRY POST
,(
~-
j
~:.
FACE OF CONe. .;;-
REF'. PLAN
~
REF. 5/S"'501
f'OR ADD'L.. INfO.
~
" '
fl4 lC 3'_0" DOWEI.S 10
X'-X" O.c. ONE SIDE or
WALL DRILl. AND ;EPOXY
4" INTO WALL
I
Ar
~_.
@ ~?o?TING AT INTERIOR TILT-UP PANEL. Q
S5'01,.,
r
e"'s+Wes+J.;"".,,~ e\ev. p.t- e"l'~c\ \ ;" "6'-qJ...."-;-iPhene.
\s -t\\e cO.::'.~- d.\'Me.V\.SIC~ rtA.\\e.v\ F('o.""-~ O~ wes+ ~\Je..~
C( \ 'So /- f~o-r"'5 -:,{.er ~'" +~<s O,\r~ . \ ~ ? '-t, (r .& I\~l-~ +0
de-1-. @Y S~SD\ - 01< .to 90 2'-&,( Ve.V'"-\-~'-o..\ I~ \ S+er?
'5-\0\1:\ -
GJ
@
S-5C>3 -.. LQ(/~ Lue ~Q.Ve. 4 +(;\C~e{r\eo\ s tQb Jc:-' I
IfJ f era i<' I eJ. do c.u e Is (If eV" 1.) 1", \ ~ e", 0 r- --I---i.', c,~
I+ tlJoc...\J, be. eC<.s~ey'" toY" cQ.d;~<> -+~ \t~
ru \.\.e.\.:, _ (J
S-562- r- CCtk uJE.-
'^ e.x- e... Ct -s \;J e \ \
I
kMC- ~ ~'lJeh<?d s~~ca0 Je{4~
t..D I e 1M. ~ e~ - (,J e..\ J.. r \ o:~-e COl."", H t:o 111
~ . ,T-c ~ - I. - - \ J -
<) .. ~/I"__---- ~l~' - . -" ..
~~ -v:;-f' _, - l.....} ~ ~.'-'
'\ fl 6.. "/
':'::"u.. I, ,c:. (j, J, U 'f
..
!!\C>..I' \<. - .1 ~ee 4\,H€. -kS CI. ~" q C( P btwl'\. +; \-1- (h~e \.s.
. Lc..~ we. u~e. %-,~ ~r Q.\ \ o--t\,.~y ettenor
. I . \ \ ( 3 II
&'m.-tVI'e.- s.r'f.s c<S we . ;:-&
" 31t/ (c:'~t(~ ~ec
,
._~
....- ~-._-_._..._.-..----_._.........
~{mJ.SJ;lj.
~.
- aUILDiNG co.
".,,~.J_I ,. n' .J .M. ,...,J.J:..
Po!l~
Request for Information 042
,
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
1.~illI:aiim"
I!l. I ti'_\__ ..J:.~
, ..;;r..it~
Answer Company
KPFF Consulting Engineers
111 S.W. Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Co-Respondent
Answered By
Nick Saari
,i!!O'\I!!I , " 1J',JlIt It. J; ...It!. "'_~.."..
AlJtt'lorc;ompany
Wild ish Building Co,
P.O. Box 7428
Eugene, Oregon 97401
Author RFI Number
,~
Authored By
Tony Dean
Subject
Base Plate near Elevator
Discipline Category
Cc: Company Name
Contact Name Copies Notes
Question
Reference Detail 7/5503; 5101A; Detail 1/5601
Column/baseplate near west elevator pit.
S503 indicates 4" from C-Iine to the edge of the column base. S 101 A indicates 5" from "C" line to the inside face of the
elevator pit wall.
Date Required: 6/28/2007
However, the base plate for this column (W12x40) is 14"x18" making the edge of the base plate 7" from the center of the
column and "C" line (Detail 1 and 2/S601).
The base plate will protrude into the elevator pit by at least 2".
Please clarify/revise the appropriate details
Suggestion
Answer Date Answered: 6/21/2007
There is actually a different base plate size for this particular column indicated on detail 7/S-503, section A-A.
There is a note that I (Nick) added to the base plate schedule detail 2/S-601, note 6, that indicates specific details should
take precedence over the typical scheduled base plate. An columns that occur next to a concrete wall will need to have a
different base plate configuration to avoid conflict with the wall, and I have indicated the base plate size for these in the
specific details. The columns that have base plates not confirming to the scheduled sizes occur only at details 10/5-501
and 7/5-503,
Note from Nick Saari June 27,2007: 5" is correct. The base plate for this column is per 7/S-503, view A-A.
Prolog Manager
Printed on: 6/27/2007 JLT_Projects
Page 1
.I
IJI!!!!'I
~ ~
'-
Request for Information 042
.,,,,_~,"'I....., - ..,_a_.__._IIII....Ii-...~ .. 1."~IiI_.."iiIiiiiiiiI
Detailed, RFls Grouped by RFI Number
5258 Anned Forces Reserve Center Complex.,J
3110 Pierce Parkway
SprinQfield, Orej:Jon 97477
Project # 5258
Tel: (541)736-5843
Fax: (541)736-7716
1iJP'!W11'l~~' =:"~
~fl.M'~:;' .'
- -
"".,.""'~...~~"-
.~-' ..J;~_~_I/l'mamq:DMiIllioiIW~.iI1~..aDlOiIl
':.' .~Ji:;:"1.~~1.~~~;\)2S.:,:;,:< .:~'\:!:/':;';;'.,!:::>?:{\.:;:~;,<;~;IY::~,:',.
Wildish Building Co. Tony Dean
P,O. Box 7428
Eugene, Oregon 97401
"~pOhdent .
~;<<'''_.,;".,::.. :
,~,.
Base Plate near Elevator
'.. . \',.
,~pf(M
'.,~,
Cc~ '.' ,Co..-pa,.y,N.rne,
.' .' < ,"~:~1Hame_"'~:~"";~" .
,Q.-.cm', '>.:' . .
Reference Detail7/S503: S101A; Deta1l1/S601
Column/baseplate near west elevator pit.
S503 indicates 4" from C-Iine to the edge of the column base. S101A indicates 5" from "C" line to the inside face of the
elevator pit wall.
" :::"'::~~t'''''7
However, the base plate for this column (W12x40) is 14"x18" making the edge of the base plate 7" from the center of the
column and "C"line (Detail 1 and 2/5601).
The base plate will protrude into the elevator pit by at least 2".
Please c1arify/revise the appro.... ;",~~ details
~.
~::,
. DateAMwered:
S \l
lS
(of'Zt2ec.T.
PLA'I t:.. pO ~ TV( l .s
p t;:y( 7/ S-S05> VIEfA) A-A.
1S
THtS 1S~SE:.
CaLL> VV\ f\.>
NlcL(
<;: AAl2.{
K 'P FF.
6 (2 '7 (t> 7
Prolog Manager
Printed on: 612112007 JL T_projects
Page 1
._.'.-'"_.__.0'--__..__...__..__._... . .. ........ ._..... ._...._~~..,.._.. ___'_00.'''' ,., _"_.n
..
~WimDlSnl
~~~"+t&:it"~..l
~..."'S""<:~~~
...:.':DIN.G ~~. ..J
Request for Information 044
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
13O:.o~~~~~~~~~~1I1.1''''II.II.. .l~iI'~
l!!iJ~_::
IL,--"",i".:1----.~-".... ~
." 1",
~, ~~-~....~"!ll:!lI.~eit~.*Dr:roRl!l:jlm.v.rD1'ir~
i, nrrnml I. n nil ."._____.___
AllswerCornpahy
KPFF Consulting Engineers
111 S. W, Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Co-Respondent
Answered By
Andi Camp
Autho..Co@jany
Wildish Building Co,
P,O. Box 7428
Eugene, Oregon 97401
Author RFI Number
Authpred By
Tony Dean
Subject
Tiltup Panel Chord Bar Dimensions
Cc: Company Name
Discipline Category
Contact Name Copies Notes
Question
Reference Drawing S502.
Please clarify the spacing between the top chord bars (4"?) as well as the dimension between the two pairs of chord bars
mid panel (4" between all four bars?),
Date Required: 6/28/2007
Suggestion
Answer
Detail 5/5502 has been clarified, reference Revised Drawings to be issued 6/27/07.
Date Answered: 6/27/2007
Prolog Manager
Printed on: 7/2/2007
JL T _Projects
Page 1
r)
.
Request for Information 044
",.- ~l,.\
''-,,'' Detailed. RFls Grouped by RFI Number
5258 Armed f,w.w..... Fl..."".:.. Ie Co., ~,CompJex-l1 Project.. 5258 .
3110 Pierce Parkway Tel: {541)736-5843 Fax: (541)736-n16
SprinQlield. Oregon 974n
JIi:~;jl.r.MWeb~__~if~I!t;~~_"iI;iii.:~f,lii,~~.~';"~~~~<iA;'\;~ii:i.~MIfij..!.liIT4
~~~~~." . . .....:i~Y,-;".~'ijt'.,:/:::/;>~; '~~_:'::'<:<':~>>'!'\':>: .,\~_, ".
WiJdish Building Co. Tony Dean
P.O. Box 7428
Eugene. Oregon 97401
AUtbOt~r~1W .
~.,
. SubjeCt
Tlltup Panel Chord Bar Dimensions
Cc: ' Comp;lny.Na..
,DleCiP.tlne
Cat8gOry .
~Nam8 .
~:--.
QueIItion
Reference Drawing S502.
Please clarify the spacing between the top chord bars (4"?) as well as the dimension between the two pairs of chord bars
mid panel (4"batween all four bars?).
D=tlD.~.~
S~n
~
Data-ArinenKl:
DErAlL
Rb\l\SeD
3/65c2 \\A5
\)W~S L \b
'~~&~
CLAA-\FleD ~e.'R-e...lq;;
,)
"B6.
\'SS ()e"D
b/2-7/0f.
; -"':C)
,,/
~I ~ /~rJ-
b/21-/o7
Prolog /IIanager
Printed on: 612112007 JLT_Projects
Page 1
2'-0. -T't-'.':'
J ,
- -+-s
I
TRIM BfIRS.. _
.......-..",.
~t'
~'I.....;
. ',f.'..
:;.- :~,
I"J~::-l~
',' l:~)
!;. .~?~..
GROuT POCKET
mElt ANGLE
SPUC[ HAS
BEEN WELDED
( 'TO 3'-0"1'
w...}.Ji
13 . 8" o.c.----/.
BARS IN
....,
;
ON A~", "'4-; ~ =~.~:5/S-501 FOIt
. ADD'L INFO.
t-,- -, A
-- -:L---
~
: "-0.
. , '-1)" ,.'
,'-a"
........
.L........
.L:.:L'
0'..
~;,. 1/S-S01
rolt UNDER SLAB
R[OyIREMENlS
~.
/'
( =rl-'.""
, '-. ,. "
( , , ", - '''j' ,
~ ~._'
r V-L
\.. A
A .-
J:--
~.
.i' '"
Jk..
PANEL
.x)INT
__ SPUCE ANGLE
'" ,'-a. LONG
1 ~:s.3lf.l AT "0 BAR
t.IiI~ Al ,t 8M
2.~ AT '7 BAR
I l.... :::: \
,liT=:';
- '---PI.A91K: SLELVES
OVER CHDRD BMS
FOR ~ LENGTH or
PMEL. AT EACH
END. TYP.
'" ,
, .tt,
-.1 . ,.
I
;/
SEPARATE - - '...
CORNER
lARS~r
0P'Tl0NAl.
"',cIil
\r
,UIL T-UP PILASTER
o
TYPICAL CHORD TIE DETAIL
~ So "'L..-
1"=1'00"
~
AlCWE DETAILS APPLY
N 801M HORIZONTAL
ANI) YERlICAl.
DIRECTIONS.
. CD ~~L~ DETAILS-SI
CORN
1'1'1',)
J,
'.
/
lILT-UP PANEL
.UP TO 2'-0"
1 'f
t ~,.'~
)
'--
- BASE Pl REr. BASE PL
.1
I:
~~lmDlSH!
~
BUILDING CO.
~ng\<:)1
~
Request for Information 047
oo1i...;
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
.~J1~II"io~,IIIIIII.I ..".01 11111 I ,'," .r _', ",' _" ,III I, I _',,_,,_, ._~_'"',_.' .,.,...,.".. ," I 1:'1' I _ 6., I ...~ ~-.l.r.;M~11
~ - - ------------ - ____' -_._~-~~ ===:--:- -~- - ~~i:nf-~t:~?-~- y~::____:_-.~l_ '7'"~rtli:'..'~..",a;.t:I(:.i.iiiiii"'J,,qllj'.cVJ"1(IiI
. ..Anslftiel"..Company
KPFF Consulting Engineers
111 S.W. Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
. ,--- Answered By
Nick Saari
-AuthorCompany---
Wild ish Building Co.
P.O. Box 7428
Eugene, Oregon 97401
Author RFI Number
__.-.c-Authored.B}F.'--~~-- .
Tony Dean
Co-Respondent
Subject
Columns vs Wall panel
Cc: Company Name
Discipline Category
Contact Name Copies .. Notes
Question
Reference S-1 01 C and detail 1 0/S-501.
Date Required: 6/29/2007
At grid 22/C, the distance from the inside face of the wall panel to the centerline of the column is 6".
The width of 1/2 of the flange is about 6.1". Detai13/A303 shows a gap (1"?) beteen the column flange and the wall. It
appears there is not enough room for the column to set as shown.
Please clarify the relationship of the column and wall at this location.
Suggestion
Answer
Revise dimension to 7".
Date Answered: 6/27/2007
Prolog Manager
Printed on: 6/27/2007 JL T _Projects
Page 1
I
~'" @
,-; '" -
I,\;
Q
I
...
N
.-
G9
7' -0-
'," .~
II'
~CL
o COl>>
~
;,..
1 ...
j.....
i ,
, '"
~C)
f"l'!'I
,i _..{
....-'(0
-'''!''C!l~'~''"'''''L_,f "
"
'~q
./
.g~L.."..". J":~:. ""
THICKENED SUB.. .." ;
BELOW STAIR
STRINGER
'REF'. 8/5-502 /
.; ,
'1" ".~~.~ '''I'I''!'!,,::! ~"'_ _. _ie' :,'l':!ll:'_'.:~ '_. ;'... ...~10lIl."",'~ ,~ "'. ;I!,I, L
!
S-I QU-
iR
.AS
\rc~1
:ING
'S.
ii:
:!J
.
Ul
"
...
-'
"
8
tiOlE&
REF'. DETAILS
41S-501 AND
8/S-501 FOR
AbOITlONAL
INf'ORMAnON
-
1" PL wI (4) .J+"'x9M
EMeED ANCHOR RODS
REF'. I IS-60 1 FOR
ADO'L. INFORMATION
, ,
.
o
.I
...
-~ (:
8
'SECTION A-~
- CI. COl.. AND
COL. FOOTING
Q
YREr. PlAN .,'
,
2 II
I . (6 c..)On"'"
~ ---" wOt2.1<- )
Ir y
r~
"
~ BOTH SIDES OF
WALL AT SIM.
REF. 15/5-502
. Ar-
IA
WF' COLUMN
REF. PLAN
nLT -UP -.......
WAlL PANEL "
REF. PLAN
rop OF FTa. .
ELEV. REf". PLAN
-t,
'I"
I,
-FILL wI
CONCRETE
'...
-...
41 ',,- :~: ~.. SlAEI ON GRJilJEJ I
. " REF. PLAN
..
, REF'. I IS-50 1
FOR UNOER SLAB
REQUIREMENTS
II II
II II
ff II
" "
" II
d.b d.b
l'l " ..~: :':: ':"C , j
~.
FoonNa~
REF. PlAN
AND SCHED.
~ IA I!!.......
,--
- REF. 8/5-501
FOR UNDER
FoanNG _,_
--.-....-......
'. ~
BASE PL
REF'. BASE PL
SCHEOULE
2/5-601
~
ell
Z(J)
.15~
f1f2~
lri~
o:~
I
~t!I
a~
::)~
- -I: 0 '
g~
9~
1
HSS COLUMN_
REF. PLAN
I
I
,- ~~~WR~~~-
I
CL OF COLUMN
AND FQOnNG
SfCTION 8=.fj
SLAB ON ar.eAOl?:
REF. r~LJI,N
-:.I
L;w
~
aUILDING co,
g6~1
Request for Information 048
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
R-FI#: 048 . -.'-.'. .---- n ,-.-~ ,- ,-----:'. -, ---, ,_. ,m_--: -.- :-DiifeCreateic:(--:'SI i
Answer Company
KPFF Consulting Engineers
111 SW. Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Co-Respondent
Answered By
Nick Saari
Author Cornpany
Wildish Building Co.
P,O. Box 7428
Eugene, Oregon 97401
Author RFI Number
Authored By
Tony Dean
Subject
Washer Plate
Discipline Category
Cc: Company Name
Contact Name Copies Notes
Question
Reference Drawing S-303
Date Required: 6/29/2007
Please clarify the PL 1/2" 3xO'-3" washer plate.
Is that 3"x3", or are all four bolts connected by one plate?
Suggestion
Answer Date Answered: 6/27/2007
Each bolt to have a 1/2" x 3" x 3" washer. Alternatively, a single plate connecting all bolts may be used.
Prolog Manager
Printed on: 6/27/2007 JL T _Projects
Page 1
."
!II!
Request for Information 048
Detailed, RFls Grouped by RFI Number
5258 Anned Forces Reserve Center Complex-ll Project # 5258
3110 Pierce Parkway Tel: (541)736-5843 Fax: (541)736-7716
Springfield. OrEl!:lon 97477
RFI If 048 Date Created' 6/22/2007
~~',~,';',"::'-<"""':" <./'::.:t~:,::;~'~~:'r!1~~~~5;:r~"::'<~~~.-\:";'::>,:';:: '.'__~~~;~r~~']~'<;"~?'~?(:.::C~~~Nf.~tJ'~~;~~~W,1lt:~:;:';~:::~:.,
,~
Wildish Building Co.
P.O. Box 7428
Eugene, Oregon 97401
A~*,;.um_-'
Tony Dean
;SUb!tct
Washer Plate
DftIcfptI,", ."~ '.
Cc: COJIJpanyN""e
..,...~'...M. " ~.J~,_
~cn
Reference Drawing 5-303
Please clarify the PL 1/2" 3xO'-3" washer plate.
Is that 3"x3", or are all four bolts connected by one plate?
~
-~;'8~: .eI2tJ2IKf1
Anew.,
..oatta.,~:
fALL-;
); L \t ~ S \I x.5 tf
A 5/~,LE
(S OL-l~ fV\~ 'f
'[SOLT
-r0
HAvE ,A
WAS VI E.r<..
J
A "1..-1"' C-1t N ATEt--y
JIt-L
to c.. ATE CoN /VC= c. TL M
g & v$' Er:> .
~/C-I? SA,4~1 IC//'"r:
6/2 7/67
Prolog Manager Printed on: 612212007 JL T _Projects
Page 1
'--"""
"
'~
~I~
S) 1
5/16V 14 ~ I
~ "- 1'1'
I!! /I'~.~~
~I
~
-\
\- u /
~~
~
9I:ir
,--'
o
~.,.,,'-,..,..,
HSS BRACED FRAME DETAIL
1"=1'.0"
..--
_.,""-.-'.-~""-'--.'_"'.,.:':~'.;-:---'~:.-'
~ '" 1+
~ /1+
1- -,
CL OF BRACE
H$S BRACE
REF. ElEVATION
'HAND TIGHTENED
ERECTION BOLTS
AS REQUIREO
, ~ U GUSSET PL
(50 KSI)
,PROVIDE I"
PRE-MOLDED JOINT
FlLLER EACH SIDE OF
GUSSET PL AT SLAB. L
FASTEN TO PL wi I ,
L.V.F. 's IN FABRICATION
SHOP
, 1Ji" NON-SHRINK
GROUT
-(20) '''llI F1554
:~r~
~ WA~ER PL JiXJlIO' -3" !
~
--d
~>
O~
~ ~
o ~
U~
~
~ ~
~:::
~I'
"
~,'''''',,'"'
'--,.~.-
DRAWN: WLM
ClmaaID:' UP
nP~.mcrNo: 203323.10
nom: 06.mW7
-
SHBET- ,'.....',
8-303
Ro~~l? (
~
BUILDING CO.
-
Request for Information 049
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
Answer Company
KPFF Consulting Engineers
111 S.w. Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Co-Respondent
Answered By
Nick Saari
.. , .... , '" "'" ".., .aJltjlmoY"tlltbJm:MII:W....1Jflilii.
Author Company Authored By
Wildish Building Co. Tony Dean
P.O. Box 7428
Eugene, Oregon 97401
Author RFI Number
Subject
Gravity Column Baseplates
Discipline Category
Cc: Company Name
Contact Name Copies Notes
Question
Reference detail 2/S601.
Date Required: 6/29/2007
For gravity columns, can epoxy anchors be used. Suggest Hilti HY-150, using the manufacturers recommendation for
penetration.
Suggestion
Answer Date Answered: 6/27/2007
Use 3/4" diameter x 8" embed epoxy anchors. Do not erect coOlumns until epoxy is fully cured.
Prolog Manager
Printed on: 6/27/2007 JL T _Projects
Page 1
""
.'
Request for Information 049
I III 1IIII"hl,II,i"..'i.1 11.'il" ,1.IIiIIli,ill.' 111111111
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-ll Project # 5258
3110 Pierce Parkway Tel: (541)736-5843 Fax: (541)738-7716
Sorinpfleld! Orepon 97477
RFI tt 049 Date Created 6/22/2007
,~_~,:;,.,,; .',,' .,.,;(:~::?FiifAfl....".iJ.;!(:t~;':;,~~K:~r;~~::?".}!/;~:r,'i:':'j,'~~!;"'lfl:t':;::';::; ,,'
Wildish Building Co,
P.O. Box 7428
Eugene, Oregon 97401
Tony Dean
!c~,"
" ',', "Autt.'Oi;..~~bjjf: '.
......:
SUbject '.., '
Gravity Column Baseplates
Co: "Compa~-.'
",DIHt"lne' ' .,'.~.,
, ,,::<;~;Nallll' ~\'."" ,:'.' ..",
,'~~,
Reference detail 21S601 .
.,",,':::_R~~;".aOO7
For gravity columns, can epoxy anchors be used. Suggest Hilti HY-150, using the manufacturers recommendation for
penetration.
. SUlitfttlOn
.tMwer:: ','
~Anawered:
USE 'J(Lt tl pX B '-( [ -?/l1(S Eo'
C-?~tt'1 (lAJCl.iDeS , ~o p..:; 0 T r;.. /<. t.= c.. T
c o/.,.. c....> (VI ~~ ClNrlL E ~o;<:r I> pc; LL 1
C vlZt:=D.
IVl ( l(
C;;AAY2/
kfFh
6/2-7/07
Prolog Manager
Printed on: 6/22/2007 JL T _Projects
Page 1
'Y,sv
'TED l]]
11 ___WF BEAMS
"..,- REF. PLAN
~ CeL or BrAU
~~ STIFFENER PL
-
I
5" 1(3)
~ / \SIDES
G~AIED Lill
11
....;:--::F.B~~~
=.,{CL OF BEAM
'1
~ }fl~ STIFFENER PL
~i
~'Il\V
)Ixwl
. .
.,
\M TO BEAM
CL OF' BEAM,
"... "- AND COLUMN
. }4 /
~~lJ~'
:I,: ~.}... '
l\ (lVP,
U) .,"
\:'
~J
". l "i .
" .""",, "t"c",.,.:"
'. "~l._:a...' ,.,. !
...-- 1"" NOl.l1INAL
".-- NON-SHRINK
GROUT
J- ~:
~
.
LEVELING NUT
ANCHOR ROD
REF. SCHEDULE
TYP. GRAVITY COLUMN BASE PLATE
CD
1I .. ..~. "- _ .. . . n_. _~ '. ..._...
TYP. GRAVITY COLUMN BASE PLATE
SCHEDULE
N(IN.) ',.. B~'~oJ.).1 T(IN.) L' X(IN.)
~'.. :J..' .___~
lIS 14 ~ 1}1
1".._
lB 14 ,"
:::; :: + -~: : ::
HSS5.000lCD.250 1 0 ~~. A ~J ,_10: ~ lJa
HSS4114Wf. II'f~:ERlr- ..6 h ~ 1}i ." I
HSSSlISlC1:a CORNE~) 6 " ,,,
1"=1'.0"
COLUI.1N SIZE
ANCHO~ HUUS lNU.~
0W4E.IEP
(4) ~"" II 9"
(4) ~"f.&ll 9"
(4) ~"" 1I 9~
(4) :J4"1' 1I 9"
(4) ~"fl 1I 9"
(2) ~"f1 . 9"
(2) ~"e . 9"
Wl2u40
..
W12lC45
MQ1ES:
1. ANCHOR RODS SHALL BE HEADED MOTM F'1554 CRADE 36 U.N,O,
2. ANCHOR ROD HOLE DIAMETERS (db) SHALL BE AS FOLLOWS:
cia ~ 1" : D1 OIl c:b 't l);."
," cil ~ 28 : Q, ... & -t ~..
cia ~ 2" : m. .. c:b 't '"
3. PROVIDE U1LL FlNISH AT BOTTOM OF COLUMN AND TOP OF' BASE PL.
4. ACCEPTABLE TO SLOT HOLES RADlAUY TO ALLOW F'OR CONSTRUCTION TOLERANCE.
5. ACCEPTABLE TO USE ."4.".1(9" EXPANSION ANCHORS AT CONTRACTOR'S OPTION.
(AT F'OOTINGS ONLY, NOT AT STEM WALLS OR PUNTHS)
6. SPECIFIC DETAILS lAKE PRECEDENCE OVER COLUMN SCHEDULE, WHERE PROVIDED
7. REF'. DETAIL '/S-601 FOR TVP. BASE PLATE AND ANCHOR ROD DETAIL.
o
TYP.GRAVITY COL. BASE PL SCHED.
s - ~03
~
~.
I
~I
aK
~I
i.
M
~
U
o
~
r.IJ
fI)
(::::
tt
0'\
~
~
~
~
~
PD~07
~
BUILDING CO.
IIIJ.11 ,....
Request for Information 050
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oreqon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
RFI#: 050 ,,- .., --: - - '. '-, ": --p , -', p, -DahiCreiied: ~ 1ioof,
Answer Company
KPFF Consulting Engineers
111 SW, Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Co-Respondent
Answered By
Nick Saari
Author Company
Wildish Building Co.
3110 Pierce Parkway
Springfield, Oregon 97477
Author RFI Number
Authored By
James Thomas
Subject
Column Anchor Bolts
Discipline Category
Cc: Company Name
Contact Name Copies Notes
Question
Phase I buildng anchor bolts were required to be galvanized after fabrication.
Date Required: 7/3/2007
We have recently constructed a building with a steel interior frame that did not require galvanized anchor bolts.
Will the Phase II buildings require galvanized anchor bolts?
Please advise.
Suggestion
Significant savings in cost and bolt lead time can be realized by using black iron column anchor bolts.
Answer
Galvanized bolts required at exterior pipe columns only.
Date Answered: 6/27/2007
Prolog Manager
Printed on: 6/27/2007 JL T _Projects
Page 1
II!
Request for Information 050
Ii liill ....... ..11iI
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex~1 Project # 5258
3110 Pierce Parkway Tel: (541)736-5843 Fax: (541)736-7716
Springfield, Oregon 97477
_8FJ!I 059 _ _ Date Created, 6/26/2007
~~"":,;
":";:);;:~:;~~.l;;1'
:~~if~\;~;>'Y;;i;';?;:;;:"F~f'~";_;;;'\:";"",, ;"
Wildish Building Co. James Thomas
3110 Pierce Parkway
Springfield, Oregon 97477
:~
, '~:_f__
Njtct, '; " . "
Column Anchor Bolts
'~pJlne '
"':~"
'Cc:,:~"ny",.
.~Ct;""'; , .
~'2~:"'<,,':;""'"
~tl9n . ... , , " " "
Phase I buildng anchor bolts were required to be galvanized after fabrication.
We have recently constructed a building with a steel interior frame that did not require galvanized anchor bolts.
, :'~:Requliild:'1MOO7
Will the Phase II buildings require galvanized anchor bolts?
Please advise.
'I~" ",.", .
Significant savings in cost and bolt lead time can be realized by using black iron column anchor bolts.
ArilIWer ,"
o...~: '
G AL VA f'! /7- ~ 0
f: )C- Tern ( 0)(
~l>L-T>
~E6< Ull2e~
DfVt,.Y' ,
)1T'
Y/~E.
C bL c.1 ;'L-f N ~
;fJ /~'c s;(j;P/ k/?r:
6;2 7/0/
Prologlllanager Printed on: 6/26/2007 JL T _Projects
Page 1
pOJ1 /
l,WIJ!lDlSHi
~
BUILDING CO,
d,II'11 I ,I.I.I~I~IUI
Request for Information 051
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Sprin8field, Ore~on 97477
Project # 5258
Tel: (541)736-5843
Fax: (541)736-7716
fm:l17"1"~ -
Answer Company
KPFF Consulting Engineers
111 SW. Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Co-Respondent
. - - . - - . " .. . -,,-, . ... ~ . . -~. ~
--iP.1,...IoJI.r.j'''' .lr)i..lifl~j
Answered By
Nick Saari
Author Company
Wild ish Building Co.
P.O. Box 7428
Eugene, Oregon 97401
Author RFI Number
Authored By
Tony Dean
Subject
Brace Wall Baseplates
Cc: Company Name
Discipline Category
Contact Name Copies Notes
Question Date Required: 7/9/2007
Sase plates are not indicted for all of the structural brace frames (such as shown on Sections A and B on S-301).
Are the details noted on Section C/S-301 typical for those other brace frames? If so, there is a clearance problem with the
column shown by Section D, S-301 that is next to the tilt-up panel. Please clarify that particular baseplate.
Suggestion
Answer Date Answered: 7/212007
Use typical column base Plate where there is no brace at footing. Use detai110/S-501 at columns adjacent to wall (Plate
is 1/2" larger thatn column) Do not use epoxy anchors at these locations...use cast in anchor rods,
\
\ LO ~
, ~,,"I
C YY\O~:l:::}o (I\,'--
Prolog Manager
Printed on: 7/2/2007
JL T _Projects
Page 1
-
,
~~~~wJ
Request for Information 051
111.11 .I..II~"..I ..,1 ",, ...', ..~-. ,,-;;:;-,-:~-;-','~;:'";'--:;;r"-M~~-:--;n~::"M-::-:-:~'-~_. -:,
Detailed, RFls Grouped by RFI Number
5258 Anned Forces Reserve Center Complex-II Project # 5258
3110 Pierce Parkway Tel: (541)736-5843 Fax: (541)736-7716
SprinQfield, OreQon 97477
RFI #,.-05'1 " . -, _ , _ - ,. ' .. "' ,,- Date ercatcd ,7/2/2007
:'A.~._f~":::'" ::....' ':':":,~f~~~~g~';~::~J~:'?__~.Wtfl{;.~:.,:':.~':~rr~~~~ ,~~_i5~:~.i::~~-~:~~;~:;~?;?~;~~~:~~:~.(~::~f~~~Wii~?\;~'~r~.~:::.:;':.'..:.
c04lft~ '
Wildish Building CO.
P.O. Box 7428
Eugene, Oregon 97401
,,~:,,';_~bIr:"i'
Tony Dean
;8,~,"
Brace Wall Baseplates
, r'U............... . '
.. :"'::~".~~-."":' .,'.:<:.:: .~
, ,,~'
...:..:..'....~7:'.....
co: .',QOdl"~i~
, ,;,~!~;, "~,!:~..~(,,,
~on:' ..., ..' '., ""';"'\:'''.';:~';<J:~e*;:~~:;:;'VMOO7
Base plates are not indicted for all of the structural brace frames (such as shown on Sections A and B on &.301).
Are the details noted on Section C/S-301 typical for those other brace frames? If so, there is a clearance problem with the
column shown by Section D, S-301 that is next to the tilt-up panel. Please clarify that partiCUlar baseplate.
:~i1'
Anijww; "
VS<:
T"tVOI c...A L
CbLU"'1'1U t1.kSC:
'.".;~:
00 r.::- A 'I
R w \-\'C-n. E:- T IrU::.....V'6 l $ tv 0 I:. te.A G C
FooT l tv c,.' 05 E V-?t'lI~/L /0 / S~ $0\ A r
c: 0 l-. A ~ J A.(., (?::f'JT '\Z> L-J ALL (,-.e.. I S;
~~ .J\ N C l> '-~ " Pc:> ,^, D I '
V2" Ll LA (l. c;,e-rz. , q ,... ,) ,....
0S"'e- E f?c'P y A N64.:cIZS A T T'1 ES E
C--oc..... A T I D r.J S L.) ~ C3 c-- A t" (" / p.......J
11 fJCWO?R.. ;e 6)pS.
/V/?K :5AA~/ K~rr 7/2/07
Prolog Manager
Printed on: 71212007 JL T _Projects
Page 1
~W'~~.z:,s.~.!l.__~-""':;'_"'."'-'_~!""~~~~~"" '""-"\._
(E)
(0)
(E)
(0)
r=
- --""
....,,-
t
~
~
il
il
(c) (8)
~ ~ -A 1 '''::'~r~?-~"
---'I~~y'" =~~I~O~i~
\. ...0-----.-'- 1 ~ZTh
&. .~. .::::--r-~'" \. 'I~
. ..! 1\\ \ - 1 ;;~.
@V'j ~. ~ un
@) ~~,~:nON AT GRID 18
(c) Cf> l<" M 0---@
~~~ ' "~ir~~e~
~? _ i ~~:~~~ ~~i~,
@/c ~"k'4 ~ ~ I ~ O&,~
------ --------------1 :
~....,'ileS.
u? -r:~ NT Q...vt. 7 (.u~~
@ ~~,~:nON AT GRID 22
o
(0)
(c)
(a) l<':':'~ ~~".
~
l--~~~'
~I ... ...... .IJ..... ~-.iHe8r
"l"-~ I ~~ I ~__
.~ I ~
! """
i
c) Fan
?
~-~
~~~
-~
-~.
I
i
e/
?
o ~~,~TION AT GRID 5
(E)
o
@)
(B)
r
~::=-~"
____ ~ ~I ~ '~i~,,'r._':'
~-1~)"Pt_-(,{ rnn
..~ M' I ::;-r-~"'I.~
-~
i/;: ~kM~' \:.~ ... .ffu~
I I """
i i
--
u 0
? 7
....,.,'"""
/l""::':"i(.l,
o ~~,~:noN AT GRIDS 10 AND 13,
uau
CQOllul~ EnginoGR
In'W!llh_
s..,;Lo-Z500
-sOi_~"r-'k~12Ot
II
Ii
~ I
'~l
i}~!:..~rtr~
~"../7
~~~
....
~
f:l
i
~
~
1:l
Cl)
U
~
rn
~
rn
Cl)
~
~
'"'C:l
!~
ij;
0...
UB
Cl) el
d ...
Cd '"
...:l;;::
"'"
""""'" "
Pll.OJECTlb 20332].10
DATI!: 06.01.07
SHEET
S-301
II!
Request for Information 052
Detailed, RFls Grouped by RFI Number
5258 Anned Forces Reserve Center Complex-II Project # 5258
3110 Pierce Parkway Tel: (541)736-5843 Fax: (541)736-7716
SprinQfield. Oreqon 97477
RFI tt 052 ." __ __ , _ _ ___' " , .., ,,' Date Crccltc,d,- 7i3/'2007
Ari.if'IIi.,.":''''>...-..'. .:'7:::.:,:~:!,~\itilj::;f:;::":?< ,..<~~6f\;(~:nt~t>;':i':X&;~-;:~!.'l~:!.,/::.'<; "
\c~~
Wildish Building Co.
P.O. Box 7428
Eugene, Oregon 97401
..' '" ,.',~~ft:_"""
Tony Dean
,Su~t., '
W12x96 base plate
'CC:.';;CCimPiftYiN._
,",
,.~,',
'''.''01''''):'
"., ......;.'<~;.....: ...."
,,~..&j.-.--, '.'
..,~:.,'::~~;<._.....:..
~~ ';;';." ".". "". ,::;Dna;~~:L71'i012Oo"
What is the base plate size/configuration for the interior W12x96 columns? Same as for the exterior with the anchor bolts
"inside" the web layout?
On my last job we had an issue of the column base plates protruding past the wall framing plate. so if these columns are
embedded in a wall, the base plates should be similar to Ihose shown for the exterior columns. with only 1/2" past the
column web to eleviate this potential conflict:
Looking at the rest of the interior columns, it appears most will require framing around the columns, If those base plates
can be revised to minimize the footprint, the wall "bump-outs" will be smaller.
;~,
Antwer. ...
, ,
" 'DatiJ\i':;~~:
lifE r7~ It:.. )'/2! I'C-?e. .>?-qt:"JfJlIl.:C:"
Cot. v~N
/?,?fJ;l!../ 01-1 p715'
r~/'.
)TIIt~ S .ll1I~1
Ie c;Pn-:::
7/?/O}
Prolog Manager
Printed on: 71312007 JL T _Projects
Page 1
Page 1 of2
Jim Thomas-Building Division
From: Nick Saari [Nick.Saari@kpff.com]
Sent: Tuesday, July 03,20071 :49 PM
To: Jim Thomas-Building Division
Subject: RE: AFRCC-II RFI-52.pdf
Jim,
The W12x96 is 12.71" deep x 12.16" wide. Typically I recommend %" tolerance each side of the
column when determining dimension of from face of stud to face of stud, 13" should be pretty close in
this case.
Let me know jf you need anything else, Thanks!
Nick Saari, P.E., S.E.
KPFF Consulting Engineers
111 SW 5th Ave., Suite 2500
Portland, OR 97204
(503) 227-3251
From: Jim Thomas-Building Division [mailto:JimTB@wildish.com]
Sent: Tuesday, July 03, 2007 9:25 AM
To: Nick Saari
Subject: RE: AFRCC-II RFI-52.pdf
No... my brain fade. Sorry about that.
I would like to confirm the overall size of the interior 12x96 columns.
~L, 7~
James Thomas
Wildish Building Co.
P.O. Box 7428
Eugene, Oregon
Phone: (541 )736-5843
Fax: (541)736-7716
Cell: (541)954-8381
From: Nick Saari [mailto:Nick.Saari@kpff.com]
Sent: Tuesday, July 03, 2007 9:25 AM
To: Jim Thomas-Building Division; mark@archbbl.com
Cc: Bob McDonald
Subject: RE: AFRCC-II RFI-52.pdf
Jim,
The current design shows the column base plates bearing on the footings, so the base plate width will
not conflict with the partition walls. Had you anticipated placing the columns on top of the slab? I
7/3/2007
Page 2 of2
believe this would be possible. The impacts I see are:
1. Base plates need to be 'Yz" minimum wider than columns, so they will take up more floor space
if placed on slab.
2. Sl'ab will settle with column which will increase potential for slab cracking as well as occurrence
of random cracking.
3. Anchor bolts at braced frames will need to have length increased so that they are embedded
the specified length into spread footings.
4, More uniform surface for pouring tilt-up panels.
Please let me know if this is how you would like to proceed. Thanks!
Nick Saari, P.E., S.E.
KPFF Consulting Engineers
111 SW 5th Ave., Suite 2500
Portland, OR 97204
(503) 227-3251
From: Jim Thomas-Building Division [mailto:JimTB@wildish.com]
Sent: Tuesday, July 03, 2007 8:35 AM
To: mark@archbbl.com
Cc: Nick Saari
Subject: AFRCC-II RFI-52.pdf
Please review and respond to the attached field question as soon as possible.
7/3/2007
~WimD1Sbr
~...~,,~~
~...~:-~~
BUILDING CO.
-
Request for Information 053
-
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
l!I:li:ll!.r:_o..~',
Answer c6filpallY
KPFF Consulting Engineers Nick Saari
111 S,W, Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
,~~,-"'~""~~~L"'-:__-_~-~~""";
.. iii ._DF.UOl!ll.\o.*.....__A~lV.lolIJTA
Co-Respondent
AuthC>I"G6mpany
Wildish Building Co.
3110 Pierce Parkway
Springfield, Oregon 97477
Author RFI Number
Authored By
James Thomas
Subject
W12x96 column base plate
Discipline Category
Cc: Company Name
Contact Name Copies Notes
Question
Attached is a sketch of our interpretation of the "typical baseplate" for a W12x96 column.
Date Required: 7/16/2007
Please confirm OK w/you.
Suggestion
Answer
Nick with KPFF confirms sketch.
Date Answered: 7/9/2007
Prolog Manager
Printed on: 7/9/2007
JL T _Projects
Page 1
~
Request for Information 053
I
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II Project # 5258
3110 Pierce Parkway Tel: (541)736-5843 Fax: (541)736-7716
Sprinafield, Ore!:aon 97477
lf~jjillW:_i1h1i~!' ,."..."..,~.,.,i~~~~~~~;~;~G7=e""'-'illIl"""~~al:'miiiir.t.'F.ti~d~J;m.f~
__~:..~'ri.'>'...".",'..?r'~~~,tt;.~?fi;{;;':::';t;,:,""'<Y'~~Y;f'i{~\';'[~":,.:'3:'>;';'?~.?i'"
.cO.It..~t '
Wildish Building Co.
3110 Pierce Parkway
Springfield, Oregon 97477
AuCboi..~".......,'
James Thomas
Su~
W12x96 column base plate
Cc:" ComP=fty!~
Dllcfpllne .~,
.,~._., "~~'~',",
QUMtfOn
Attached is a sketch of our interpretation of the "typical baseplate" for a W12x96 column.
Please confirm OK wlyou.
'Dnt,'~:"".7118taOO7
~
An8W8r
~~:
CoN':::( ((IV f/J
---
/II{ t( S I'll'!?!
{fPF
1/1J;7
Prolog IWBnllfJer
Printed on: 7/9/2007 JL T _Projects
Page 1
T T L E
N C
JOB
ITEM
DATE
BY
SHEET NO,
OF
401 Alexander Ave.
Building 326
Tacoma, WA
USA 98421
Direct 1 888 60 REBAR
Office 253 272 4227
Facsimile 253 272 7256
W I Z X Cf;6 1r ri~6 Pt., J7'"T~
(NO\ /JUJAc...ek(i" 10 ill,.'\ q:;ArttL.)
;/
Ie,
t
1-
I If
!~ ~~
j..r.--()JI v< q",
I
~
a-
II If
~ 11# ~ X q f/ft/55b/'n611/
/ ' /1113 C/JIJ;6- iJo,",1i t..JA>~f
(i
-+-
f-/'
( I
I {' (-1"11')
I ~f ( r-II')
]-Ci-o?
J~f
FORM NO, 37887 . MINUTEMAN PRESS,KENT . (253) 852-6020
'JLES
.<IZ.
TED
_WF BEAMS
REF. PLAN
(CLOF BEAM
\
-d'
\ '
.
-S
18" PL w/ %"Ol
A325 SC BOLTS
TYP,
"'" ~6 ~
~6i/
oTI
_WF BEAMS
REF. PLAN
C CL OF BEAM
%" STIFFENER PL
, ---.1(3)
~SIDES
ATEOlxsl
-::::::==--WF BEAMS
REF, PLAN
(CL OF BEAM
-%" STIFFENER PL
~r
~6V
<wI
TO BEAM
CL OF BEAM
~ '" AND COLUMN\
~ / ,
GRoOfHoL.E. "N"
(OPTIONAL) ~~
BASE PL REF.- -:-..... '" I
SCHEDULE FOR SIZE," ""'., \
J fD / ~
.-/ ' ~ /T'
~L~~N /~~ I
SECTION
~:)
"
I....---...X"
f' TYP.
-$'
"/ /- o/16V NOTE:.
REF, 8/S-601 FOR
SECTION AT HSS
COLUMNS
~
A-A
?~ .
: a..
x~
~6V
CL OF ---
COLUMN
~WF COLUMN REF.
/ PLAN
~IA WASHER AND NUT
1~" NOMINAL
11 NON-SHRINK
rlRl- GROUT
. ..' . ... ". ~ . ",
,;.~. ...,..,J. ..',. ,''':-".
I-
...Jzo
oOw
lDi=o
:i~~
-"")a:::
:::Eo:c
. g:1-
ID
l'
AI
i-- ~,
~
.
ANCHOR ROD
REF. SCHEDULE
LEVELING NUT
"
n
CanSl
111
Portlan
51
'1:1
~
\~
~
,
CD TYP. GRAVITY COLUMN BASE PLATE a
~
Q:;
1 "=1'-0"
TYP. GRAVITY COLUMN BASE PLATE ~
SCHEDULE
N(lN.) I B(lN. ) I T(lN.) I X(IN.) rNCHOR RODS (NO.) I ~\l"'I"t.
COLUMN SIZE . OIA~fR
W12x40 18 14 % I 1)2 (4) *"Ol x 9"
W12x45 18 14 1)2 (4) *"Ol x 9"
W12x50 18 14 1~ 1)2 (4) WOl x 9"
W12x58 18 '16 , 1~ 1)2 (4) W91 x g"
HSS5.000xO,250 I 10 I 10 I % 1~ (4) *"91 x 9"
HSS4x4~ 10 (7)2" AT I 5 % 1~ (2) *"91 x 9"
CORNER)
HSS5x5~ 11 (812'" AT I 6 % 1~ (2) *"Ol x 9"
CORNER)
NOTES:
1. ANCHOR RODS SHALL BE HEADED ASTM F1554 GRADE 36 U,N.O.
2, ANCHOR ROD HOLE DIAMETERS (db) SHALL BE AS FOLLOWS:
db ~ 1" : dh = db + 0/,6"
1" db ~ 2" : a, = db + ~"
db ~ 2" : dh = db + 1"
3, PROVIDE MILL FINISH AT BOTTOM OF COLUMN AND TOP OF BASE PL.
4. ACCEPTABLE TO SLOT HOLES RADIALLY TO ALLOW FOR CONSTRUCTION TOLERANCE.
5. ACCEPTABLE TO USE ~ "Olx9" EXPANSION ANCHORS AT CONTRACTOR'S OPTION.
(AT FOOTINGS ONLY, NOT AT STEM WALLS OR PLINTHS)
6. SPECIFIC DETAILS TAKE PRECEDENCE OVER COLUMN SCHEDULE, WHERE' PROVIDED
7. REF. DETAIL 1/S-601 FOR TYP. BASE PLATE AND ANCHOR ROD DETAIL.
o
TYP. GRAVITY COL. BASE PL SCHED.
,4.,
hWlmmSHI
~
- BUILDiNG co. '
..;1. ...i,illl III I ~ ,., I
5258 Armed Forces Reserve Center Complex-II
311 0 Pierce Parkway
Springfield, Oregon 97477
1:~=lt';_DJ.~~IIL-L ~_-J. :_'\Ui~~'~1:.:~__. -Zii:,~_-~-1;::;:': ~'---t_~~3;iLi:'k--lO~'_;;;:.
AnSWf:!rc~inpany
KPFF Consulting Engineers
111 SW. Fifth Avenue, Suite 2500
Portland,OreQon 97204-3628
Co-Respondent
Answered By
Nick Saari
Subject
Depressed footings
Cc:Company Name
....'...;", "''',,'oMl''''~';' ",... ... ,". ,,,,,
Request for Information 054
.-.
Detailed, RFls Grouped by RFI Number
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
~ ,
I ,
~il~~.:.: -.---~f"-. ~.;>~~~&r.:I(:m.8}JII*I(::.tolf46lJ.I:)V""h'"''
AutliOr-Company
Wildish Building Co.
P.O. Box 7428
Eugene, Oregon 97401
Author RFI Number,
Discipline Category
Contact Name Copies Notes
Question
Reference drawings M 111 Band S 101 B.
Authored ,.By
Tony Dean
Date Required: 7/23/2007
Drawing S1 01 B indicates the column footing at grid D9 is to be depressed 2', presumably to allow installation of a floor
sink. A sink is located near footing at grid D10, but it is not depressed. Should this footing be depressed?
Suggestion
Answer
Yes, depress this footing 2'.
Prolog Manager
Printed on: 7/18/2007 JLT_Projects
Date Answered: 7/18/2007
Page 1
....
~,.,...,_.
- - :- ~
,~(D..
...
.1
Request for Information 054
Detailed, RFls Grouped by RFI Number
525g Anned Forces Reserve Center Comple)l:-iI
3110 Pierce Parkway
Springfield, Oregon 97477
Project #- 5258
Tel: (541)736-5843 Fax: (541)735-7716
A~iC.~~
"'<~~..,ey'
~!~iii~."','"
Wildish Building Co.
P.O. Box 7428
Eugene. Oregon 97401
~RFIMtiimbef
,~,8Y
TO:lY Dean
C~pondent
Subj~
Depressed footings
O!ecepiine ~ory,
Cq:: '.' ,.Con'.pgny.N8!mIB
CGrnlllCt.Nam@ ~ ,No.
Question, ,
Reference drawings M111 Band 51018,
Drawing 81018 indicates the column footing at grid D9 is to be depressed 2', presumably to aiiow instaliaooli of a floor
sink. A sink is located near footing at grid 010, but it is not depressed. Should this footing be depressed?
~~equ!red:in.sn.w7
s~"
A.~",...,f
Dillte,A............. ....ri:
YE~
/
l)(~J2E<;J
'17.l (
I "I,
Fubrl N6
') {
-
)JICt(
S-/1//&/
ujt?n~
7/17/07
/ I
Prolog Manager
Printed on: 7/1612007 JlT_Projects
Page 1
..
f'vi , If 13
s 1 0\13
1'0
q
I r; - I
fS I n~'
"\ ~~
:* /1
: ~ I
f1O\ SIM.
V
J>
@
~~ ~ A
.'
I
~.
I
..
, ,
' ~6'o .
l1-t
~~ '.
I 1/1 N l
I I ~ - (,
I ::(~
~0 8'- ,,' ~
8' _7"
/ /
/ /
CL OF-
COLUMfJS
l~m'bISHi
~~~~::~~~~
- BUILDING CO.
t.UI,~,,,,,,Jj;. ..':.. ;oillliil
.
Request for Information 055
-.
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
, -
.~~.~. . - .~~_ 4_' _ _.. _.... .'_ . .~.......~ ~_ . .. .
.:~~"!.IJ.1-
Answer Company
KPFF Consulting Engineers
111 SW. Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Co-Respondent
Answered By
Nick Saari
Author RFI Number
Subject
Grade of Anchor Bolts
Discipline Category
Cc: Company Name
Contact Name Copies Notes
Question Date Required: 7/24/2007
Detail 3/S303 indicates we need to use l' diameter Grade 36 anchor bolts for the brace frames.
Other anchors, such as the 3/4" diameter anchors shown by detail7/S503 do not indicate a grade.
Please verify GR55 bolts, as noted on the attached Portland Bolt quotation is satisfactory.
Suggestion
Answer
Confirmed: Grade 55 rods are acceptable.
Date Answered: 7/18/2007
Prolog Manager
Printed on: 7/18/2007 JL T _Projects
Page 1
Request for Information 055
I
~I'i;q'~""_.'''''' '-",,'em"."" ,...~,_.... ......._ ,-.
Detailed, RFis Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-If
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
A.nS'll-S7
By
Author Company
Aut'lored 8"
; :..'~ j
F.e'; Sox 7(~2e
97401
CC~R2spond"el1.r'-
Authqr Rfl
Grade of Anch(}r 80fts
Detail 3/8303 indicates we need to use l' diameter Grade 36 anchor belts for the brace frames,
Other anchors, such as the 3)4" diameter Mchors shown by detail7/S503 do not indicate a grade,
Piease verify GR55 bolts, a5 r.cted on the attached Portland Bol! quotation is satis~",...lvry.
(of\Jfil</l{q CIZJfJ( s-s /Jo/Jf
At~ AC{,~8~C\
!<<C.q9#R/
#/r-r:
~ l7/d 7
Prolog Mr:m;:;ger
Printed on: 7/17/2007 JLT_P;ojacts
Page 1.
CL OF COLUMN
WF COLUMN
REF, ELEVATION
TOP OF CONCRETE
EL. REF. PLAN
~,
~o
ot3
lD W .
~ 0
00 ~ t')
n.
o I ~~ ~
-CL OF BRACE
HSS BRACE
REF. ELEVATION
, HAND TIGHTENED
ERECTION BOLTS
AS REQUIRED
, *" GUSSET PL
(50 KSI)
,PROVIDE 1"
PRE-MOLDED JOINT
FILLER EACH SIDE OF
GUSSET PL AT SLAB.
FASTEN TO PL wi
L.V.F.'S IN FABRICATION
SHOP
, 1J2" NON-SHRINK
GROUT
(20) 1 "Ill F155
GR. 36 ANCHORS
- WASHER PL J2x3xO' -3"
0:
o
o
o
o
o
o
o
o
SECTION A-A
.... .,
.,
"
~I
(4) SIDES \ ~""'"
TYP. I '>" V 14 ~ "
~) ~[>::~~~
'~I
~
~8 "" 14
~8 V 14
,>"VAI~
+ '" --r--
\"..
\~-
-,- ~
~
/~ J;
~
o
HSS BRACED FRAME DETAIL
1"-11-0"
..
\JJ
~
r.n.
~
U
~
o
~
"'0
~
S
<~
C~
@ ~
o ~
Uf,3
0,) ~
~ ~
cd 0
~~
DRAWN: WLM
CHECKED: BP
PROJECT No: 203323.10
DATE: 06.28.07
SHEET
S-303
T
I
I" ,. ~
L_____J
o
SECTION AT lOW FOOTING
1 "=1'-0"
(1)
t- /
BASE PL ~x~x1'-1"
wi (4) *"0x9" EMBED
ANCHOR RODS ~
~POUR BACK "
r REF. 5/S-501
FACE OF WALL-
REF. PLAN
~
WF COLUMN
REF. PLAN
--.' ,
~.
, . ""
TILT -UP-
WALL PANEL
REF. PLAN
----- .,'---
~. ,
"
A
I
~
" '-
SLAB ON GRADE~
REF. PLAN
_ PIER
(:
.
C'l
~
"
TOP OF PLINTH
EL. MATCH lYP.
TOP OF FOOTING
~ROSSTIES
L HEIGHT
L
.-,
i
. ;
2"-
CLR. J.".
lYP.' 'I
<<
(6) #8 VERT.
---
(7 .
:)
.
- #4 0 TIES
@ 10" a.c.
(3) TOP
@ 2" o.c.
~
/'
It
1
.
TOP OF FOOTING
EL. REF. PLAN -
~
~I T
I
~FOOTING REF. 8/S-501
AND 4/S-501 FOR
ADDITIONAL INFORMATION
_C\ 1_..._
'.
."
.
I
SECTION A-A
'~
(1)
TOP OF WALL
EL. -1'-6"
S;03
I . 11 I
-" --..---- .......
iMr,i1OOISH!
~
BUILDING CO.
-
Request for Information 056
~._, ..
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
'RFI #: -056' ,i..i,;:.. '. -" -:: ,-' > '-,- : ::..;, ;;::.,,;';'::"":.:,: .' , ' -.. - ' ,. - - "'- "- Dcife C-r-' "." 7./17/2007.
Answe.r Company
KPFF Consulting Engineers
111 SW. Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Co-Respondent
Answered By
Nick Saari
AuthorporTIpal"ly
Wildish Building Co.
P.O. Box 7428
Eugene, Oregon 97401
Author RFI Number
Authored By
Tony Dean
Subject
Tilt Up Wall Questions
Discipline Category
Cc: Company Name
Contact Name Cppies Notes
Question
Reference Drawing S-206
Date Required: 7/24/2007
S-206, panel 41 indicates the panel is 6" thick. The adjacent panels are 8" thick. Should panel 41 be 8" thick?
Reference Drawing S-102B
At the intersecion of grids E and 10, 13 and 16 the wall panels change thckness. Please adress how the #7 chord bars
will pass through the transition area.
Suggestion
Answer
S-206 Yes, panel 41 should be 8" thick.
Date Answered: 7/18/2007
S102B Align the chord bars in the 8" wall with those in the 6" wall and use 5/S-502 for splice.
Alternatively, the bars could be bent at a 1 :12 SLOPE.
Prolog Manager
Printed on: 7/18/2007 JL T _Projects
Page 1
Page 1 of 1
Jim Thomas-Building Division
From:
Sent:
Nick Saari [Nick.Saari@kpff.com]
Tuesday, july 17, 20076:54 PM
T_.
!u.
Jim Thomas-Building Division
r:r"
mark@archbbl.com
~~~~!~~+.
~"''"'J--~'
RE: I!\FRCC-U RFI-56.pdf
~~tta=.:nment5: R.f~ Q56 RESPfJf40L..P;:t
Jim,
Please find attached response. Let me know if aligning the chord bars at,the transition is a concern.
Alternatively, the bars could be bent at a 1: 12 slope. Thanks!
Nick Saari, P.E., S.E.
KPFF Consulting Engineers
111 SW 5th Ave., Suite 2500
Portland, OR 97204
(503) 227-3251
F.,;."".,: lk" Thnm;;~-Hiiiidinfl f1j'vi<;iOi' l-mai"lto']j'mTB@w,"ldl"sh.com]
.. _. .. -.... . ..-...-- --..-...:;> - ..-. " .
5e5iit: Tuesday, July 17, 2007 11:21 AM
....... -~. ,. >,...., .
- -- ------. . ----
'" "''' "-~'. '" -."""""'-:< <
iI~. . 't;",.....J." _._n....l"~'
Cc: rncik@an:hbbi.con1
~==~~.===~" !...~Drr_TT D~T_~r::_ ~~~
~~:...:r';:':;...:.~'t.;:. ......-:. ;',-",-,~ ~.... ,,",-, .... -'''-'~rU'
....;..................... .......~.,........., .-.......-i "..___..........__"""'.,..~...__ ..;.;.....___ ,-............-._.;...______ _._.,...., ...,.,....;...,...."'.. ,_.,__ .___.....-...._.
r ~::;:::::1::::C :: -::::.:"::-::::'--"f ~: ::=-:: :: C::::t-?=.J: :;-= i,=.J :.:::=::;- -::1~~::.1=_,~ i=:==-= ::::-::::'o..i ;-juc~u~,-n: <:,--;;:::: ::::~_~~jf ~::..s::::
..- . -----..
>Jii H i i iVH iCi~
i.; ::..:.
ii ....;..;i
~
Request for Information 056
Detailed, RFls Grouped by RFI Number
6258 Anned Forces F\ ,." "II I" Center Complex-ll Project 1# 5258
3110 Pierce Parkway Tel: (541)736-5843 Fax: (541)736-n16
Springfield, Ore~on 97477
~r!~'r.~~9~~I!liT44iI7I"..JDIDt.
~e~~~~~~' ' ;');f'&,~~,'jj"",~~,:""..,.,."...,. ""';'>~7i~!l!IY"
Wildish Building Co. Tony Dean
P.O. Box 7428
Eugene, Oregon 97401
~.i~~"'.. '
~~,
,Subject ,
Tilt Up Wall Questions
Cc: CGmpanyN;."nfl
~ine Category
~~IIl, ~~~.
Q~cn
Reference Drawing 5-206
5-206, panel 41 indicates the panel is 6" thick. The adjacent panels are 8" thide Should panel 41 be 8" thick?
'~~Ad: 1f?A12OO1
Reference Drawing 5-1028
At the iniersedon of grids E and 10, 13 and 16 the wall panels change Ihckness. Please ...J. o:;;N how the #7 chord bars
will pass through the transition area.
~on
MSW'GI'
0== An=w@~:
\fES \
g LI
P AtJ e: L Lf I
-rH L G k 6'
;/1J rtft f3 't
rffe 61( INALL.
Sf?t./c.e.
S ~Cl.J!- 0
ilL/eN rifE cuc>,(LJ
tJl1tL fA) 11J( (h'(jf~
A;vtJ USE S;S"-50L
Be
gjJf2f
I>>
pdI2
!/Ic,k JA/l/21
KIPj7/C:
-(//7/ () 7
Prolog Manager
Printed on: 7/1712007 JLT_PrOJects
Page 1
t'~x~' _
~ 0
, ,
i:~
....--- (2) 17 CHORD BARS
./ lYP,
,s
~ ' ,
:,XJ:
:l><t
" ;
u,
;'!X~I,
~ . ~
, I '"
~X~
" I }-
,~ (4)i'5~,
---------- ----------T-------------
:[~:
_nnnnn~n_n ___'.~':'n jnnnn, ,
H]
PANEl
W-29'-11W
T-6~
\0
(, f
1!11
PANEL
W-29'-11".
T-8-
II
<6
L-
~
/X'
, ~
"
lTl".-:1"-
,(N,T,5.) I
-jj,-;;-",~;--,!
,I
---------_:_---------,--------------j~--
, .140ft'.....",. I
, 'I
"
I XI'
..!-- ------------1, I' ..f------
o
~
.
-- - --- ---- -1- - - -- -- -- __ _ __ _ __ _ _ _ _ _ ____
,
~
PANEl
W-29'-11".
T-e"
(I
~
YZOb
o
~
.
"
'X'
, ..
---,,-
"
~
r--(4) 15 ~
- ---------____________l~________________________.
I/{A~
-' "
~
~-------
..
IHI
PANEl
W-29'-11"-
T-8"
/J
~
'X'
.~=~------
, ..
- .~/ -
I \____ _'''0__ ..,..,., oCr'. ,. ,... " .. ...... 0'.,.
I Tt"'.
I
-,' ..,-
I
I
I
I
I
I
---'l
./
/;
'0
o
'1'
/."'..~:..,
.... ...--..-..,...,
,,~
- "0.'".. ":,
~
'"
~
.-
::
C
~
I~("'_O'__" /t;( ~
I
@
~
IJ
I~X~. '1'
I' .
'~, ;(
I
I
I
I
I
- - - - - - - - - -~: - - - - - - - - - _ _ _ _ _ _1_ _ _ _ _ _ _ _ _ _ _ _ _ ,_ _ _ _ _ _ _ _ _ _ __
I
I
I
I
I
I \',
H" __ ".":.'.::,
.;~---. --'-.' "'", :\
'x'
..., '..'.
'. . i
~/ '/
~ "78'-
. N4 @ 15" o.y.t
-------------------------r-------------------------
I
I
[!1]
PANEL
W=29'-11X-"
T =6"
S20(",
~(I
'" ~
'.
...............
",
^ ^
=
~ .
v ~
v
~ ~
C'l
'--' C'l
'--'
.-
r<) .-
x r<)
lD X
.- lD
?; .-
?;
I:
W:,1x55 [50] <~">
fJ
8"~
^
.
~
v
W12x16
16) '" I
I X ;::-W12x16
I ,J [6]
I '
rj2Xl~
I ~
V
-110\
"W
I .
S Ib113
"'''-''-''~~
////////
I''''''
......I'..
///'/'/
,---------------
'.
'.
".
....-...............
'.
".
.........
,."'~~~, /
-
---------------'
..-
......--:.....
....,.........
/////~~~'
IV "
~:;t; ~~.p 2~~_:~O~K~~D A
..~.... 24'-9" AT GRID E
'~~~f~ . ~~ ~E~~W2~Op OF
;~:;N ~~~~~~~~:~; :;::R
;~;l; :~~E W~~~~~ HAS
PLASTIC SLEEVES f\
OVER CHORD BARS
FOR ~ LENGTH OF
PANEL AT EACH' ,
END, TYP. / 1 -0" N 1'-0", / TRIM BARS OUTSIDE OF
2 BARS WHERE / A // / / BLOCKOUT, LAP wi
, OCCURS / h-F ---!-.- PANEL EDGE REINF.
;.." , I ... . / J f -". '''' .J~ .
Il~ " "'~' -""'----;.~,i ' ..... .'"":
( '.. ,"".".F.,.._~:;;;-==-li'
, ) lr=, . f'"' r~-': n
~lr'.'..""'._... ."~.. I.../'"....,I'~.""',.,' " '" "".....,,'3-.:
, I ~ ., ",,'" "~I""'""J1..,,_ _ _I ~
4-c- [,
If ~ A ~ ;....~. PANEL"
~ / ...
1"- / , JOINT
TYPICAL CHO~D T:E D ::TAll
I.
;,.
,
\
~
;,.
,
"
;,.
~I'
,
\
TYP./
CD
1
""" ",:: '~':::l-.:
M : ~'::' ~;.. ..
1
J
.J
AT SECOND FLOOR
BOTTOM OF BLOCKOUT
EL. 14' -0"
1 "=1'-0"
~
- TILT-UP PANEL
#3 (Q
SEPA
COR~
BARS
OPTI(
NOTE
ABO\!
IN B(
AND
DIRE(
G)~
0---
\'\ r 1 -
5-2010 PCA~e\ L\\ q ?r"'c.Y"" ,*0 bE' q {/ ') 0 ~
5 k> lA \ ~ \J e.. q I' -\1.:; c-<; ~o-t- (, {',
I
s - 'O2..~ - lJk€.re... 9(\c\ E \\t\{-ev-soects <jV"';cis 10
\"3, c;",c\ \ to -+,1-1- ~\ b c..\""",,\ e t\.-,~ k~ess _ h<lW J
skovJc\ ~e. ~ 7 c..kovo\ \:AY's 'tro.V\ ~\ +"0\1\ ~
1WiIVJnISHi
~
- BUILDING CO.
-
Request for Information 059
~(f!YJ
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
'RFI #: '059' '- ",-- :', '-;- ,.. --~~-"..;. ,"u, '-~,', , - Date 6reated: 7/23/2007
Answer Company
KPFF Consulting Engineers
111 S. W. Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Co-Respondent
Answered. By
Andi Camp
Author Company
Wild ish Building Co.
P.O. Box 7428
Eugene, Oregon 97401
AuthorRFI Number
Authored By
Tony Dean
Subject
Embedded weld plate
Discipline Category
Cc: Company Name
Contact Name Copies Notes
Question
Reference Detail 15/S-501.
Date Required: 7/30/2007
Detail 15/S-501 shows the tilt panel wall to slab connection.
To avo ide leaving an imprint on the tilt-panels, we suggest emedding the weld plate 1" and placing concrete over the top of
the plate during the slab placement. After the tilt-ups have been poured, the plate would be exposed and the
corresponding panel welded to the plate. The weld plate would then be grouted along with the grout under the wall as
shown on the detail (Please see revised detail attached).
Revision OK with you?
Suggestion
Answer
This is acceptable.
Date Answered: 7/24/2007
Prolog Manager
Printed on: 7/24/2007 JL T _Projects
Page 1
~
1"=1'-0"
UC\J I IV." r I 1::1'.1 I '" T r-U~ I
"
Ii) PL %x4xO' -8"
,.-~,~~,/~ Y4 V
t _~r "-:'~ ,.....,.. '. .'6
--:~~ r./ "..,
\ . '
~-PL %x8x1'-0.
wj (2) %"(I)x5"
HEADED STUDS
REF. SCHEDULE 8jS-501 @ a" o.c.
/
CENTER ON WALL /
FACE OF CONC. ---
REF. PLAN
~)
TILT -UP
WALL PANEL
REF. PLAN
1)2" GROUT AND
SHIMS AS REQ'D.
S.O.G.' ~
REF. PLAN "\
"l '
'I -- -,..,. "
I
r-
o
'Il)
- LL I
.!-w(J)
0::,
0()
~.
/
,
,
REF. 8jS-501 FOR
UNDER SLAB FOOTING
REQUIREMENTS
/
/'
Cs
L4x4x3Aix1' -0"
wj (2) *"(I)x5"
HEADED STUDS @ 8" o.c.
t '"
LOCATEf @ 4 -0 o.c.
~
Y4 V
ADD
oce
ELE'
L
1
6" f
PAN
@ ~?o?TING AT INTERIOR TILT-UP PANEL
@--
FAC
WAL
'"
-
~
Transmittal Cover Sheet
Detailed, Grouped by Each Transmittal Number
5258 Anned Forces Reserve Center Complex-II Project ti 5258
3110 Pierce Parkway Tel: (541)736-5843 Fax: (541)736-n16
Sprirn:Pield. Oregon 974n
Da~e:'", 7/23/2007 "":' , ',-," Referenc'e Number, 0219
tl~.JI.lJ~,"O'~: . ,t . -..' ..'. .......I~::~..'.. ~\~~~~r:'t~~~~~t~t~~~~~~~r~'.~f.~.:..~. :
Nick Saari
KPFF Consulting Engineers
111 S.W. Fifth Avenue, Suite 2500
Portland. Oregon 97204-3628
Tel: (503)227-3251
Fax: (503)227-7980
D Acknowledgement Required
~ ":.\Yi__~j~F~~,:'::;"':':f,~~??~~'''' ,~,<,;"::,,.
James n.........s
Wildish Building Co.
3110 Pierce Parkway
Springfield. Oregon 97477
Tel: (541)736-5843
Fax: (541)736-7716
;~;Tf'II..mltliN'For
Comments
~,Vfa"
Electronic Mail
TracIdnsi~
ltem# ,Qty ....
001 1 Request For
Infonnation
'-"'."~" ~
Number. 059 - Embedded weld plate
Date Created:
7/2312007
'.NOM. ' 'S8aitus
Required: 713012007 ; Answered:
Cc: com.,.Name
, , 'eontaal'tlllnHt
COpIes'. "....
Rem8rb
Please review and respond to the attached freld question as soon as possible.
/hL
Signature
7..2,)..07
Signed Date
Ptolorl!llnager
Printed on: 7/2312007 JLT_Projects
Page 1
-
r=&J
Request for Information 059
Detailed, RFls Grouped by RFI Number
5258 Atmed Forces Reserve Center Complex-ll Project # 5258
3110 Pierce Parkway Tel; (541)736-5843 Fax: (541)736-7716
Springfield, Oregon 97477
.REI # 0'59 " '. _ ~.. _ '_ :, ,: " '_':": : " ., " -', ~ - ,- , ,Date: Created' 7/23/2007,
A"'~ny "
'::"':"~"~~.:':"":::"'"
, 'A~1~::~'"
Wildish Building Co.
P.O. Box 7428
Eugene. Oregon 97401
AuIhOt,RFhfa;mbe; ,
':,:"."';:~8Y:
Tony Dean
.;.:: ...
~,
,SubJeCt '
Embedded weld plate
E*CfpHne
~
Cc:: ',,~....
, . ':'~'Htm., ',~;o:__"""
~
Reference Detail 151S-501.
~~~.,.J:'1i!!fJ12f!m
Detail 15/S-501 shows the tilt panel wall to slab connection.
To avoide leaving an imprint on the tilt-panels. we suggest emedding the weldplate 1" and placing concrete over the top of
the plate during the slab placement. After the tilt-ups have been poured. the plate would be exposed and the
corresponding panel welded to the plate. The weld plate would then be grouted along with the grout under the wall as
shown on the detail (Please see revised detail attached).
Revision OK with you?
'S~
AnlIwer
, ,llat!IAMwWed:
H-lS
b
~MLf, .
!~< c;, /~r
?(24:~ 1--
Prolog Manager
, Printed on: 7/2312007 JLT_Projects
Page 1
~
1"=1'-0"
vr:v ft .UI~ J-\ ~ CI'J I f"\ T r-UV I
,\
FACE OF CONC. --
REF. PLAN
TilT-UP
WALL PANEL
REF, PLAN
112" GROUT AND
SHIMS AS REQ'D.
S.O.G.~
REF. PlAN
\, I
...
o
'I{)
1-~1
I:t:~
co
--
,
\
'REF. 8/5-501 FOR
UNDER SLAB FOOTING
REQUIREMENTS
~~
L4x4~x l' -0"
w/ (2) o/.tt&xS"
HEADEIl> STUDS @ 8" o.c.
LOCAT~ @ 4'-0" a.c.
,
'r;
PL ~~xO' -8"
..
,
, r
(
,..'.~~.~.~:..,~~...',~ ~ Y4 V
f~,-;... -...'.../
...- ,'" ,1-
uP Jl ~\ _"'./
"'--PL ~x8x"-O.
w/ (2) *"t&x5"
HEADED STUDS
REF. SCHEDULE 8/5-501 ,@ 8" a.c.
CENTER ON WALL '
I' :.., _'...,...
, ,.PJ., ,'__
@ :.=~o?TING AT INTERIOR TILT-UP PANEL
.~
ADD
OCC
ELE'
6" I
PAN
CD)-
FAC
WAL
@Y (
Request for Information 060 ~O,195
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
tI~~iilI~i_ll:i..,,__iL .i",~_
Al1swerC'Qmpany
KPFF Consulting Engineers
111 S. W. Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Co-Respondent
. ,"", '"""......_B}:ilo.t!lIrjD=r-n:.li~bjf~tt".411Ii1'tii:I
Answered By
Andi Camp
Authol"C'ompany
Wild ish Building Co.
P.O. Box 7428
Eugene, Oregon 97401
Author RFI Number
Authored By
Tony Dean
Subject
Slab Pourback Dimension
Discipline Category
Cc: CornpanyName
Contact Name Copies Notes
Question
Reference Detail 5/S-501.
Date Required: 7/30/2007
The referenced detail indicates the pour-back dimension is 3'-0",
To facilitate tilt panel layout and feature strips vs slab control joints, we would like to revise the 3'-0" pour-back dimension
to 2'-5". The rebar lap would remain 25"
Please confirm your acceptance of this change.
Suggestion
Answer
This is acceptable.
Date Answered: 7/24/2007
Prolog Manager
Printed on: 7/24/2007 JL T _Projects
Page 1
UNDER
FOOTING
DETAIL
~)S-501
VS-50 1
5jS-501
VS-50 1
5jS-501
5/S-501
VS-501
I """'III"""
REQUIREMENTS
8)
FACE OF CONC. -
REF. PLAN
TILT-UP-
WALL PANEL
REF. PLAN
FINISH GRADE-
1)2" GROUT-
AND SHIMS
AS REQUIRED
"' TOP OF FTG.
~ !LEV. REF. PLAN
u.:-lo
W=>LO
0::01
w(/)
-J:,
.!-ulX)
(/)
,
-,
~
It ~
n~
NOTE:
REF. 9jS-503
AT DOOR OPENINGS.
FOOTING Al WF COLU.MN
1"=1 '-a"
/J I r //
u<..~V\J 6- 1D Z ~ ::::J
r;:~UR-BACK "
~EF. PLAN /
#4 x 3'-0"
DOWELS
@ 48" o.c.
,
/
~
---1,
~~:
i
)2" TOOLED
JOINT wj ~\
COMPOUND
FILLER AND
1~" SEALER
~ 1/
CLR. \" \ LAP:::: Z~ ,
~ ' ~, /( REF. S-002/
'l,,~ ~ ~ 0 x x (< (<-'x'xX:
,. , ',C;;"/'; ,W; (~~~ ~~ GRADE J
REF. 1 jS-501
FOR UNDER SLAB
, '" C'~ REQUIREMENTS
-- _.tW , .. , .', a
'"
~t:::~~rr~rrt:::~' ~ '-- ___ #4x J,pOWELS
I fWm II fWlI tlilir~ II @ 48 o. c.
-3" .
dJ TYP ,
/ /' . __ REF. 8jS-501
FOR UNDER
REF. SCHEDULE 8jS-501 / FOOTING
CENTER ON WALL ' REQUIREMENTS
,.
,
/,
CD
CO NT. FOOTING AT TILT-UP PANEL
1"=1 '-0"
/ ,
/ "
---
THICKENED EDGE
CD
o
\
STEEP _
AS POS~
NOTES:
1.
2.
EXC
REF
FOF
(
N
-~.
Request for Information 061
)
,~~~~D v
iWlliD SUl
;j:1~:> "~;~~
- aUILDiNG co. -
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Ore9on 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
lmDIl"ir:\~';~~
~"~6.Jl!ti~.. ~::~,~~~ ~ I
'"',I. -~-TI iiIiiiIIIJil~~:~- _:..:~~___:;1flj_._,~~~.~ .~.,~~. _""~ :)'...l.L ~,!it~fiu:It:.tl.Ol\Il*'.';.lo~IJ"~~"""lo,a
AnsVIJ~rqomp~l1y
KPFF Consulting Engineers
111 S.w. Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Co-Respondent
Answered By
Andi Camp
Auth6iCompany
Wild ish Building Co.
P.O. Box 7428
Eugene, Oregon 97401
Author RFI Number
Authored By
Tony Dean
Subject
Footing/wall connection, E-line
Discipline Category
Cc: Company Name
Contact Name Copies Notes
Question
Reference footing/wall on E-Iine, between grids 11 and 12 (5-101 B).
Date Required: 7/31/2007
We interpreted the drawing to show a continuous footing at this location. However, the referenced detail 15/5-502
indicates a thickened slab. A continous footing has been constructed.
Would detail 5/S5-01, with Z bars on both sides of the footing be more applicable at this location?
Suggestion
Answer Date Answered: 7/27/2007
Use Detail 5/5501 with Z bars on both sides, as sketched on attached drawing by Contractor.
Prolog Manager
Printed on: 7/27/2007 JLT_Projects
Page 1
~
Request for Information 061
LlI ". -.,.,.._... ,.. ._ 1111 1IIIIlil..l.CJ ..~.-. .......__._,.........,~_...--..._.I_II..._I.I II II
Detailed. RFIs Grouped by RFI Number
5258 Anned Forces Reserve Center Complex-ll Project,. 5258
3110 Pieice Parkway Tel: (541)736-5843 Fax: (541)736-7716
SprillQfield. OfeRon 974n
~~II:lllWi&~ ~
~~....~::., ,.".,',.'.,'r';:y~\:,-~.'i?~':v,;::.,;;"JWIiii~~,?~";i;?T'::....;t',:;:-~_r:>:;..",'
Wildish Building Co. Tony Dean
P.O. Box 7428
Eugene. Oregon 97401
',~,"_"" '
'~"~.','
SubJeCt' ,
FootinglwalJ connection, E-Iine
, ,~....' , H'
""~
Cc::, ' ,compamy,wam., "
,'" ::.C;.j,;.l...c.t:Nama:: ,,~,~tioIU,
'~. ""
Reference footing/wall on E-line, between grids 11 and 12 (S-101B).
We interpreted the drawing to show a continuous footing at this location. However, the referenced detail 151S-502
indicates a thickened slab. A continous footing has been constructed.
'~~713't12CC7
Would detail 5/55-01, with Z bars on both sides of the footing be more applicable at this location?
.S~on,
Ana..,',
OSE. 'DE:fA\L. '5/$50\
As SK.eR-~~~ eN
ca.'~:
W \\1-\ ~ B~S '&:m-\
~AC-~ DMuJ\1\J4
~ mE:S
.J
'By Co~T~Thg.
~; ~ /(~\==::-
112r~7
Prolog Manager
Printed on: 7/2412007 JLT_Projeds
Page 1
~
@'
4" SLAB ON GRADE
wi #4 @ 16" o.c.
AT CENTERLINE OF
SLAB
.f1 i\. lYP
'W
@
~,
~
.
-
~
~
S70/B
FACE OF CONe. -
REF. PLAN
1~" I
ClR~ ;
FINISH GRADE~ ,,1:1/-;
" "'" ~~
,..-'
-
~ .
G
TllT-UP--
WAll PANEL
REF. PLAN
,I
)1
-
)1
1~8:"'6r,
AND SHIM::; ~ .
AS REQUIRED
)1
)1
... TOP OF FTG.
. ~ JLEV. REF. PLAN
u.._O
w......1.O
0:::01 '
w
.. J: (I)
l-u~
(/')
-'
)1
-
~'
~~
)1
'-
"
)1
.t:IOTE~
~
I
~.I
: I
~;:7J ,t<Y.'!:'''I: ;j
\,
.
,
: :~: .,:~~:~~: ~ I ~', ~I
-3"
~~/TYP.
3' -O"PQUR-BACK
REF. PLAN
#4 x 3'-0"
DOWELS
@ 48" o.c.
..
"
~
i
..:.
.J~ ..
"\,,'
',~.
__ #4x J DOWELS
@ 48" o.c.
"
,/0
REF. SCHEDULE 8/5-501
CENTER ON WALL
~
'"
~ REF. 8/S-501
FOR UNDER
FOOTING
REQUIREMENTS
REF. 9/5-503
AT DOOR OPENINGS.
o
CONT. FOOTI\JG AT TL T-U=> =>AN=_
1"=1 '-0" C Rev! \G," FoIL G tl.10 Gj i5ef~~ lI' 11- J
S S-ol
tl~~!~~
- BUilDiNG co.
Request for Information 062
~"'III,I.II.I..II,I..:.I.III.I~II..._I.,
, lall,_ L.U .J.~.....,.I:L... I.;'........ I. I,.
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
"RFr#:-'062~.'-" .,:, '.-:;'--'C'-;: ....-. -, . ,-- - - ,- Date Created: 7/24/2007
Answer Company
KPFF Consulting Engineers
111 SW. Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Answered By
Nick Saari
Author Company
Crater Iron, Inc.
419 N. Front St.
P.O. Box 3666
Central Point, Oregon 97502
Author RFI Number
Authored By
Conrad Morse
Co-Respondent
Subject
Structural Steel Questions
Discipline Category
Cc: Company Name
Contact Name Copies Notes
Question
Please review the circled areas and questions noted on the attached drawings and sketches.
Date Required: 7/31/2007
Provide approvals/comments where applicable.
Suggestion
Answer
See attached...
Date Answered: 7/31/2007
Clouded comments initialed 'NS' as well as sketches RS-7 and RS-8.
Prolog Manager
Printed on: 7/31/2007 JL T _Projects
Page 1
Page 1 of 1
Jim Thomas-Building Division
From: Nick Saari [Nick.Saari@kpff.com]
Sent: Tuesday, July 31, 20072:09 PM
To: Jim Thomas-Building Division; conrad@Nstc.com
Cc: mark@archbbl.com
Subject: RE: AF2RCC-1I RFI-6.pdf
Attachments: RS-7.pdf; RS-8.pdf; RFI 062 RESPONSE PART 2.pdf; RFI 062 RESPONSE PART 1.pdf
Jim,
Please find attached RFI response. The response to the "Part 2" is the identical document that I had
previously sent on 7/26/07. The two sketches RS-7 and RS-8 reflect some minor dimensional revisions
that have come to light due to this RFI.
Please call with any questions, etc. Thanks!
Nick Saari, P.E., S.E.
KPFF Consulting Engineers
111 SW 5th Ave., Suite 2500
Portland, OR 97204
(503) 227-3251
From: Jim Thomas-Building Division [mailto:JimTB@wildish.com]
Sent: Tuesday, July 24, 2007 11:21 AM
To: Nick Saari
Cc: mark@archbbl.com
Subject: AF2RCC-II RFI-6.pdf
Please review and respond to the attached field question as soon as possible.
Jim Thomas
Wildish Building Co.
7/31/2007
~
Request for Information 062
Detailed, RFls Grouped by RFI Number
5258 Anned Forces Reserve Center Complex..1
3110 Pierce Parkway
SprinQfield, OreQon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
m:llll'-II:Jo
A',..'-;uJiC"W,;;;: ,"
'l"l -"m~lIJj[oJ'.l~_4"-ll'J'..{IIlg
"A~~W;~;;:-lO"'''''O:'':;;''''i';,:::~,.,''''
Crater Iron, Inc. Conrad Morse
419 N. Front St.
P.O. Box 3666
Central Point, Oregon 97502
Al.ithWRPlN__
,'Co4lMPondent
Subject,
Structural Steel Questions
DltClptlne '~
CC:CoJnPInY-.n.
,. 'C~:Nairha. '~".~
~n .0eItra~fWd:'l131l2OO7
Please review the circled areas and questions noted on the attached drawings and sketches.
Provide approvals/comments where applicable.
8l;"~',II",:..,lIon '
Atniwe,
Dat& AnlJWered:
seE
A' \~f Av4tJO
C 0 I't1 f11 CrJ ~r;; / f'J IT! AL CY
(~e/ vrjcS
w E L..-{,.
A5"
IS~ 7
J
C(
/
-fir (;t-( 5/j/lIZ!
kprP.
7/7/ )67
Prolog Manager
Printed on: 7/2412007 JL T_Projects
Page 1
Jul 21 07 02:30p
Cl""atel"" II""0n Inc.
541-664-2061
p. 1
CRATER IRON, .INC.
419 N. FRONT S. Kil:l: Ii · CC" I nAL POINT. OREGON 97502
P.O. BOX 3666 PHONE (541) 779-3383 FAX (541) 664-2061
Facslmil~ Transmittal Sheet
.
To:
Company: Wildish Building Co.
Attention: Mr, James Thomas. Project Manager
Page 1 of
Date: }ulv21. 2007
8
RE:
Armed Forces Reserve Center Complex-ll - Our Job #2621
f 0/'. ~ pr:.:.r
Fax #:
541-736-7716
From:
Conrad Morse
Remarks:
Dear f.un,
Attached please find 7- 8 l/2xIl partial copies of design drawings and our SK-I & SK-2 sketches. Please review,
answer ALL clouded requests, approve and fax back to us as soon as possible, so we may complete our detailing in
these areas.
Thank you for your prompt attention to these requests.
Sincerely,
Conrad Morse
~-~''''''''''~''-''"'
".'c',", ~~"."'~~~~~""'~"""'M'"::::;,~
"",;..,".,.,,,.>.r~~""""""'~-"'""""~"'_
'-U'~~
f.JUl ~1 _~~:30P C,..ate,.. I,..on In.~~
'~;~ C~V
,.,.. \A \b (W ~ ~ ~ ""' . ~I
~ IJ ~.~ '\
!, ~~giW ' ~ J. r--
]Jh.. t~ Q 1\.; ~ \:: .~~
~l \V.J) _. \1 ~ \ "_ , _
\ ~ ~ I;l. ) ,~t J-.!t\b ~tf\;. ......
~ ~ ~ 1 '\9 \!) u\ \b J-.\L ~ ~ \'I . . ~ .
/ ~~;2u't~;~ :"7~~~~' ~.
~'^ ~~ oO.~U\\b~~~ '... 8'LJ" '" 3:. . "
I ) ~I Q JJhf\ d: J\ d\~~ 'i c. ' .- 2 -6
J :! v, - F' ...J:j. · ': . d,C6 CLR.
~V\ ~va~~ ~~ W12x16~' r:CHASE
~, .'. ." ~ ~. HSS6X6q
cr S ~ '- K\NG POST '
. 0 cu-
I.(') fa. W21 x55 [50] <* -> ,
L I I, 1".1 I "., "' I
. ~-
541-664-2081
^
I "
;it
V
p_2
1~1f~; uJ
V.
"V :
N
'---
.....
1"')'
)C.
CO'
.....
;=
!
"-
'-
W 12)( 1
" @),~,
j
~
I
.~\
',",
. ,
~
[6]
,.
co;
co
.,-
x
N
....
3=
.....,
co
L-J
.....
)( ,,,,,,,'
N"=:,
.....
3':.
I W12~16 ~:
^
It
j;Jt:
V
'v'~
'"
....... :
~'-JI
-
f"')
)(
co
.....
3:
I
i j i
, .'
( 4
.....-
.
:l~
....}..:'I~
.. ~ r--
P~/IA -
5-lozA .
__; J
JI.+
\,
:,
: '-,
W21 x55 (50] <~f'>
~-
~ II
(p -,' ../"7
/. II. j :". -,&-
'" t ,",.ir'\. I
~
, rTI '- " t ') tJ5 .
Jul 2107 02:30p _~.:ate,..,~"'O' Inc. 441~~1 r,_\\l p.3
.........1. ' /,"" f ----.. 't, I. {) · -cJ
'" t71Z-~ n f \1\ ....\,. S" - 6 . '" . I , .^. .~ . N S .^ ~ - (...,
Ai' r " t \'/~ ~ I ~~' ,~
-I' A 1, tJ~/'_:'., $1-gAi>/(s.~,?~v~~ q_'D.~, V._~/O-;;
. . \l) -!JI \ < "'t='; . '. r:::-. .~", ~ @
· I 1l3~ 1I ),,7 4~~tJ ~~t-~ 1..
\ ,~ ~ ~ ~ ( = ;" -. ;;; , 1 tJ>;;; ) ~
1 \l) \J tu .........-' , , )( - () X' t .[
I -..J ~ ~ ~\\ ~ _.-...---.....cg, - <0 ~~ ~,
\ \\..- '"'II. -' -, ...., ..... ~v. +
~ .'" --:-l ~, \~ t.... 3t 3t "'"
~ j. ~ .8cU3 ".,,-2'-6- ; 'I/Ii~~
''l" ;
-.,
cr ~~ CO ~K'NG POST ',k !
"j,~ ;o~ ~~, .W21X55,J~]~.i
; k i S'-7 'l1_1~~ do
f~ " CO~.' 'i:.r a_ ~ I ~
' .... ' : , '0-...
)( 'CO' "'\ '-- I
~,~ s' __\,'f \9
_ , 5'_p~:, :=!-7 Y&" _~ .^
~: ': . .~ --;;Jt;
v'
~ I
W12x' 6 ~" , " ~.
"I,
........ - ,
...,
W 12)( 1
.J
[6]
W.'
..-
)C' 'co"
N &....I
...
~
I, '
[6]
~
~
8'--0.
I
'"
, I
;
I
:. I.:
, I
- ,
i
I
I ~
,) ~
i
I <0
~~. ....
~, ~
-' I
~1
@
, 17.A;7z;::ri A. '- '
: ~-Io 'Z4 .
- ,
.
W21x55 (50] <*">
. ...
c"
, 10 (- 3-
'f >>
,"" rol."'"
Jul 21 07 02:31p
Nr~
Crate!'" Iron Inc.
G
( /
t-/77 ':::>=t'L I
c.uC' ~ ~
a
_\
\'J
~"
~
-
~
\
"
~
-
>L
.~
-
;
,
1-
m-+
~~~
541-664-2061
tp - "> I I' t'3
Y""':~..H' (. I -NS .
tz'?;7 \ "" ~ . .
, 4.-
\, 1GtV
~*I.~: C5>
o
-, (-'1.
~( 1-z.'t'(P
"
)D ~
)' I
~
sJ
)(..
~
-
)
...
:"\~.:t -
t- .... I
'\1\ " (/~l
wl-Z~I"" .,~~\'
-.J "
. "..
t\. \ ",
~ \.... ,".,
.......
~~
..... ..-I
,S; l ~
, W I'''z,~ l (P
(E~
p.4
~
\t
r
";
,
f
I
,
i
{
1
-\~ j
~~
, i
- j
~!
I
i
:
i
I
I
I
,/ 'I.,
~ t'4"" t'-
-~ ,
\
"
'I.
_\~
~
_I
["
~
\-
Jul 21 07 02:3110
'~~,
,'~
..... 'I 15
- J '
~f\.. \ HIJ
.
-:XI
?~
\J\j
541-664-2061
,
p.s
. - J
'if.
~
'"'"
~~
....1.0
,,....
O~...:
~:II aoc
,--~... ---
. f ,-'
-,~
i-
"'""'
O.
Q)~
....,10
,~ ......
Oi~
to i If L..
a'~
~~....
N,
N
r CSxB.2
i
"r
L
I
1- .
i ;~"""IA L. I
L_G-Io~~ .
32G 4N 10.5K
Jul 21 07 02:31p Crater Iron Inc. 541-864-2081 p.6
..... ,,--( G o~'"\R~c..-ro~ TO ) <:::..... i
f"t-';;'o ~ ~ (:OO"-"I~~r ~
'v
/'
- ~ CI... ~ ~ d~ " l,f
~ I' 1"( , I ~~e " T-'--~ ___ fJ-
~ \.. ~:~ I l..+~f L
~ (~ j&oOoO- ~
. I ',--\ ~ I'<-tv~ ~1. :-L '1' ~1'1
bvJ; J W "~ =r --- .-.- '!I / iF , L .
~ c/:h c H. r '--x-
' -1-' ,4-1
tzGr: ~ !Z. '
" <Sa ~"',;J
",<-
1'2-. I L4-\<h' I~~~t:~,-,)
~--Jt_:~ . . ..._.. / ~ "ti'S>s(",.,)(.~1'2> Cf)L.
~" ve;-< ~ ....... ./g,c.D
"fV _..:-1 L.IE %xSxo(.s' (-6".s.,)
~ 0/:1 J.. ~t:/tx ~ <::lOL. ! \
/ I~'- / J~'- (f2~tJ~ ('O~..I,.I"k:3-~)
/ ~;t '-...t.... _ _ ~
o 'dervT-Y-X ~
J5~-~1.
''''''I''
-~.. COULM CAP PL flUSH
wi BOTTOM OF ROOF DECK
(~i::~4,~KN~)
,...
-'- Y-J f'\
::;-- - - Y.. V
'---T
' ,
'-JOIST GIRDER
REF. 12/S-601 FOR
ADD.L. INFORMATlON
- COLUMN
REF. PLAN.
bIOl:a
, JOIST GIRDER ONE SIDE
ONLY AT SIM.
1\'
FLANGE
-COLUMN CONT.
WHERE OCCURS
/~: COLUMN CAP Pl SLOPE
TO MArCH BOTTOM OF'
'C!)
"11 . ,",~D"I'D.. ""',
""" v
I "" "',",IV I
1 It= 1 '-0'.
_ Y4 >
~
--
OWJ TOP CHORD
44LH Y4 f>
"'oJ
( ~~ Puw - 'SlO4>0 i, ~;-Wf::.rehJ
l I~ (j G~ IDS. @ .f.- @
. 0 TYP. HSS DRAG ~TRUT CONNECTION
1"=1'-0" " l f:<.er=, 'S6+r. ~-~b)
~
~>
J ~.&L.I~-
]' ..14- ~
"" ~
~SS"t(Jx~l8). 1\
~r::....l .~. "~
----.....- '-"-' -~~,-
PL ~)(4"
...,......
,'U . 'j
1- - - - '- .,- ".. -..
-----." -
~ '.' ----
- - - .... - - - - _.
'L_ ,-~ " ,,, j", J-
,y
,6"' ,
... lYP.~-
. ~6>
~6
\
..
~8~'
/ ~6V
\G N\ ~cTO~ -=>
10 COt:>t't iC>. J
.--....
N<>
/
\ lYP.
HSS DRAG (b >< b }(:?Ye
REF. PLAN
L.b4xJ6
~R-IC>S @))
( lVP-.
{ ~ (<<;- c..
c:
...
~~
~1~1@
w
, ...
."
n
,
ftI
ct
III
,
....
,
Q
:J
....
:J
o
,(]!
~
'....
. ': I
. ,'(1)
, '(1)
, '~
I
<: ~
, "" (1)
:". .'.::: .....
I' "',..:"
: " "(
I, "
',' ,':ji
, " ,', ':' t."
'.. ' " 'iI'
. '..' ,:,\--.J
"'C
6\Lt
-:J 'I
(tl)
........'....""" l"..~.~.., "........,...."
....;'..." .,,1._........ .. .'. .,J. ,....'..............". ".,.. r
11
'H)3
lYPo
[28] <=Jf'> '.
'~' ""1
.H,,-,~:.T. .: ~.......- .j ...iiiiiiiiiiii,~~ "..., ~"I'''T'....~",. ..........2Iiio,. ,i,'H'";'i'''
'~"'.. .- .- 1 ....- ="',. - r~-;:i,. ~.ti""illl...'C_..'H,' .., '~~'H ,',"~'~_
, . . ,.' ,,,. y (' - r 'V , -
, : .( 7~c.:,~."",, ~..._h.""',:l.!-::e...," .-?!~~~~.:?!::~~2:.(:f.,,:.;.
, . , ' ':;r~\ ~, 4-(,} ~ (p~r ,-
!~tyA~ _,,/ ,'~' w12;d'e 6-~!'-;'~- ~
v~;7i.,) - '_'H" , "H"', ~ ~_
" r " ;;" , - ~ ' ,9- ~/:'
- "-.-",-_..., b, fCD '3. : , ,,' ,
.I!: :~~
r-... ;1: . 1. 2 ~
. .. '~~ H04 ·
cj" - 6] I '___,
&-.G,
-~,."
'.5 [50]
. J
tzi-F;, P~A(' ,
'2-/S-lo~A '
L- .
...-....'.......,.,........~.... ......T-~..
WM.- 1..'..w.J..I........._u~..~~,,~ _~ ."'-'~>>..J.V'lJ"ll'J1~,oG'tI""''<<<IG1l'~''"''....i'M'~:.......r,w~~: 11 J
^
.
......
^
R
"....
, ,', /f?) , ~ "1C-"'1 ~/c. l...
( }'1- )-'- V ~~
....=;;;~.. ....;.;;~."...~._;Q~ .,~. .m,,,,,,;,~'\~~~.{E~f" ~
~O ~S ,,' ~" ~'~~1i"..".'"-=-O-
, _I~;'~" .1-tSr~1>IQ'C~
,TOP OF Sll:E~ ~'~"./,' v o;~~;;,
28' -0" , - ~ ( ',' '~ '~ . '
JBEAM '. +~s->Y, ,,/ "," '
WI'7~lb~"~ ,W16x~~
):' t' ..,.. I ,;',' , I ". ..21!.,'.~
I I)' '.....;,101' ...
" ~j "'. ~.. ,
~~~., ~
'~,.-~"....-....- . ~ g
~I/ \ ~s
o v, ~.
W16x36
-
....'
:J
n.
.
ur '
~
...
I
Q)
In,
~
, I, '
i W2'~
Q)
J'
j
,,, Ii.. .111 ,,~;. 'l,"~1 ,ilj, ,_ ~
W21 )(55 [50]
~' 'is':~
'. ,',+11 ~ )
'2- S'- .-.-~ '
,C -r-I PI)
'j-
T. 0.. ~, a::. -t-
-a
.
r'L" ,....
CXl
--
",........._'.'~,",
,I. ,', '..l: n'll'lUV
........... . . ~'-
H),ill,'~ a:l~:'~: WI
71~~:r ""IO\lllll=,..........-'lI'~
^
.
;;.t
^ : \.,J\
a LJ
~
Jul 23 07 06:24p
Crater Iron Inc.
541-664-2061
p. 1
1\\
I ,,..J
~-'~
CRATER IRON, INC.
419 N. FRONT STREET .. CENTRAL POINT, OREGON 97502
P.O. BOX 3866 PHONE (541) 779-3383 FAX (541) 664-2061
50'?;,. - 'Z '2, - '?:>;-~ S (
Facsimile Transmittal Sheet
To:
Company: ~ pp p:::
Attention: ~/{ C K.. ' SAA 1< f.J ~ 5" .
RE:A 1Z. ~ D rt> f< 0:;'5 t:<. ErS,!i=fZ.UE
Fax #: 1 - s.o~ - '3'(;7- fer fho
From:
Co ~ 1::z.A.: C'
~o e~5
8
Page 1 of 7
Date: 7/.;z2/C7
o ~". 'ZD 'P~I .
Cl::::'"iu I e::.-te '...... 0 t/Ti?:.:tt "Zb 'Z 1
/~
_,// tf/f:f,. r
/" ~..p- --::"':JI~ "
- v cc........... r
/ 1L, ~\) _,,-" '
. ..-/-
~~___J'/''''
.f AG-UEO ~-
Remarks: 'PL 'E?'.A,. SS:: 12 F5 V , 6" W -n-l EA.' I
t'21- ' ,
l::> ~y-ll -p ~ J:l t- C f) Pt{E3":;. ~ t;)~S(G1t-J O(ZAW I~~S
. t2. ts= Gt. V ~ e'?(l ;...i G, \! f3;'re ~ r::=- U:",A--r, t>-,J 4- A? r (2..D \J 4 ~
e-r== ~ -pr;;;:.c.l r: f. ~ D~'-f"'Zl..1 (. 'Sa ~ L s- C A>r't c-JU. So ...
PL~s.e; t::-A~ ?.7AC\tL) ASAP.
~~ You ~I Yo'U2.. Cfr1-l<;.JDF5f1Z-A-1-'O'"tI-i-
~~~
~
cc. -. !,../Il-'t:>1 S-I-I ~/oJ41- ,~~ '"1'71"" r-74 s. (~, -/'?;..fc-7-1I'=)
7lz?;'/07 c> k:01,"ZS ;-.......,
~-~ ,
~
..... ALL-- ok cUC?y p/,o v,/;;e
s/8 f1 S71Fr. /II XJ (?T;(rL
. ,
51> - 601 ror( W Il i-L{o r wn. )(,t;CJ
'- ~ ----. '
{ con....o.l ~ rVs-tG. C.Ol'Y\ /
Jul 23 07 06:.24p
"-'"
.--j
s-
O) ~
.- II)
~.~
It) ....
a ' p
,(.)
~,
~ :1-
24G 3N 10.5K
T/C=7.0K ' -
S
0> ~
.... It)
,~
o .
,- It) -
", u
- (.J
~~
N
N
...-.
{
@'
OPP.
S
O>:!ll!:
-- It)
~::
to') u
-(.)
:s=~
~
I
32G 5N. 1 0.5"
T/Ct7.OK-
Crater Iron
"
II
II
-II
II
II
I!
II
II
/I
If
Inc.
0~
A
TYP.
f15\
'W
r II
II
II
II
II
11
.ii~ ·
rlT -H-@)-
(!:W
II
II
II
II
II
"
"
II
II
II
II
"
". II
II
1 /I
II
II
II
I W12x1
t:::
~:
~
c
,
)C
.q
....
:.:-
-
~~
....01
....... .
~~
~~
t-
:5
~
(;9
. . :<11
-
1-
,..;c:
0,
~r~: ~OPP.
~;:~l:. ~~
'3~O
~ ~
D ~
o
~,....., N,
. ~'ft' W12x16
I rllTt, ' ,
54,-664-206,
~
if
~-r'AL
~-IC.+~
D.
-
1"
-- ,
L-.~-
TYP.
-' ... ,.,,,,.-.. .' . ..,
L--4'-
' Hl6 c
TYP. ~ '
r:
(
l8.0K
-I ,
3
'0 -
0 -
0) 0) ~ 0
..... .,... 0>
""""- ~ X .-
~ CD .......
~ - 0'
- == ~
~ -
~
0 C ~
N N 0
N
Wl '2x16
It
I
Crater Iron Inc.
. i I
,II
II
'~" 15TvP.:: --R
'S-Il3 "
II
II
II
II
II
II
II
II
II
II
" I a J
sw~;:. .-J
en ' ~
,~'" ..~,
O.N '
II) II II
,!3.0 II -
't- II 0 ~
3 ' II ~ lQ ..__- .v"-
..,. II ",. /' ' V-- ~,
... II ~ Ii ' '
~0 11 -~,' H~fG~/? "Tr'?~ Cl.4h.k~
r-? :: ~ .... \ /'0 I (' & -pfU;11 I r;;:1E; .I' .
, " ~ ' /}. ~~~ ,CG Hre. Co 9-l~~-
1 !-7t,,-_&2- ",",I 'Zi<:. t;.ClJC, I='-LG,. J
11. , '-'" ,/\. ... ~
OJ'*' 1< >~r . \ -- 1-- 'e:J .
W12x 6, ~. ' 21G 3N10.5fl.. I I (/)0 t' 32G 4N 10.
. . I ,/ T/C-1.0K LrJ ~ TI 7.0
/-0 ~
'~ /' -~
, .1 ~ .~-- W1T<1
(0"".
,- '
1 ~' . ',; C6x8.2
u 0
~ Q~ I-
-~ ~ ~
17 ~~~: ~~
HIll ~~ ~'ll 0: gi
I:~ i~,i~ ii4J ;~
o
'" ,. //, .. '7'7'
. W1~(1e ;':f"
Jul 23 07 06:24p
~
B:-;-~l
;6)(a~
'G STRUl
I
32G 4N 18.0K
-
o
en
...
.........
o
le)
~
~
o
N
"
I
'It
I
Go
..
,-
o '
-,~
v. 'iC)
....,...
",. .
o-
le) .
c.o
;:::.
~
~
541-864-2061
p.3
l?J
.
24G 3N 10.5K
T le= '7.0K
32G 4N 10.51
.
T/C::l7.0K
I I ,"
(_.J
: 50 F Sf'
~~
32G 5N 10.5K
T/C= 7.0K
, P'ktz:>t 1 A L
s- T~:>4'-B
32G 4N \
, T/C='7
I I
l
\
Jul 23 07 06:24p
____TOP OF HSS
,.- COWMN WHERE
OCCURS. PROVIDE
14. ,CAP Pl, wi
SEAJ. WELD ALL
AROUND
-4"
:..x. AT SHORT
L.J1I1:.aJ HOLES)
, ,
-c::.~
~'.i
WF BEAM
j" REF'. PLAN lYP.
~e '\ (lYP
~6 / .
)ESIGNATED ~
,\
'\r
~6V
(TYP.
. .,....,..,.
Crate~ Iron Inc.
541-664-2061 p.4
" L' 1'1. AT STD~ HOLES, W
" 1~" 'AT HORIZ. """--11-..1 '11
COPE FlANGE - 2Ji. SHORT SlOlTEO ~vw ~
AS REQUIRED t ~~. "HOLES WfZ, \d.(4'
':::- , WF BE'AMS
, ~~~ C\1, " ' / REF. PLAN
;~)~ . ~ ~:. J:.~: - -Yv' {~~
~~ ~,~, ~
d ':,~' . ~ ~
:;a. PL wI l6a.
A325 SC BOLTS
'lYP.
~6>
~6
?il"
,.(,
\
, \
~
\
\
\
\,
S"EAM TO BEAM - DESIGNATED ~ 'S~r
REF. SCHEDULE 1 0/5-601 WF.I~*
r ~ , ~RFF. PlAN .
~ e~: f +~:..;.... )c!{Cl~
REF. BEAM TO B"~ . ~ .
DETAIL NfJaoIE FO " . L '1 ' ~. stiFFENER PI-
INFORMATION NOT '" I
SHOWN. ~~,
I ,~:v, 6 > /(3)
~ 6 \S1DES
\
\
,..,"."" FULL DEPTH SHEAR PL 'DESIGNATED I XS I
"""" REF. SCHEDULE, 1 0/5-601 ~~"'~
.".... WI?~{J.7 Ii"
!Illtt:. '-'''- ..J~':'~,......j ~~~' ~-
. REF'. SCAM TO B . ~
DETAIL ABOVE FO ~
INFORMATION NOT ............. ....
SHOWN. > . l ~ . ~" sri~ER PL
~~
~6V
(3) \
SIDES I
~e "-
~6/
FULL DEPTH WELDED
SHEAR PL ..... DESIGNATED' XW I
t< E" F" . e S-"':V
Jul 23 07 06125p C~ate~ I~on Inc.
541-664-2081
p.5
~ts I
o
~~ICAL SOL TED SEAM TO BEAM . d@
CL OF' BEAM '- ~ '
I<t ~ ~ > AND COLUMN) [\j
1. MIN1"'J' ~'4,. ~ \J '
'/ /4 , ,~_ '
HOLD PL AWAY,,- w" ~ ' .". ~ ' , ' '" ::: '1
FROM WEB ., , , ----...... J/ "4, '~
\-~/rzx.4-0 " ~ 1/', 'J.m ,... . - .~
I<-ll-z..)<s.tf> ,,1-. .' . t-f.
w~it-4~ '.3' . .. · .'~~ "\. t: .,~ <TYP.
TOP OF COLUMN Pl.AN 't(EW A-A '.' ' ,
WHERE OCCURS . I ,,11" ' (; , ,
~ .,"tt'40 I'" ' co.
"Z ~ l;;1~"" , " . I ::!
i -....~ ;.---WF. COLUMN'~ 0
~,;' REF~ PLAN TYP. .q- ~
,~A .[ W!.~ wt4:-. I:::i I.i:.
, '1 ~\oOJLI ~~ D:: ,
- -'r:- ,~:..J .. t 1 V
. ,." " ~\\1 ~.....
I rl\ " I.
I .. A '
II - ..' ("\ c::;o(
, ~\ .a.
,.. pt) ~
I
I
A R
t;'"
,_,I c --
..........
'\
).
t'\ l~ ),
" %
\ ' WF BE'AM
I ' REF.. PLAN TYP.
REF. 4/5-601 FOR "'--"e' PL TOP AND '
WELD S'"Z.' BOTTOM REF. ' ,
S. PL AND eo ~1"Z)(.40 tl/~:: C, ~ * "",,8: SCHEDULE eaow
HOLE DIMENSIONS 14-( I"Z.-.c. X> ' , . ~ ~ RAllO · "till PL
r: A / ~",/'2l<5.B~III'h 2~/+. <: 3 ~"
~ $-~WI-Z~~"'_2 ~_ ~3 *". '"
BEAM TO ~OLUMN - DES'GNAJ~ X ~.s- '
. A?P/2.DV6
REF. SCHEDULE '10/5-601 "t:"1t ,I.~1- Ii
, , ,'2.J
TOP OF COW -r-t p.
WHERE OCCURS .
-k' '
p,eov I v.?c
") " r-r3(\ ~ '
A-r L.) {L~ 40
t vJ /2. 'X50 -
'"""'-.. ~
j"/;-*"
_ MAX.
j
,
- '- - + _, J_ ," 'm
, :,' . ' t '
I" ~,
m \
,
TOP OF COLUMN \'
WHERE OCCURS
, ' , J " ,
I
'.~ SECTION A-A
// i>/. ",.V'~0 '
.I VI ~~\ , ~
;/1v~~' ~ / 0 I
I ~4 ~ 'vv /' ~~
\ 'f'~ . () l po. . .,0',.'" J. ~
\ V \ ,L,J.' ,-' '4 '
\ V" r-_,,/ r/
'-' / I'~
\ /' # ';11-
"~ ;:' 1~'
TOP OF, ....
CON\A"(r:.1 t:.
WHERE
OCCURS
\::#~TESi .
'~~::;)> REF. 15/S-601 FOR"
:,'/::: >,'EMBEDS AT PANEl.. JOINT.
':.}:::~<.;. ".' . .". .
':-2' 'f:,',,:, ~ '11/S 601 FOR
.,:" .'<', ".... . - .
!~"_~:SCHEDULL "
"'Y(~;;-'TYPICAL SINGLE SHEAR PLATE
~:"C.QNNEG.TION AT CONCRETE WALL
,~j~'f\:'1lgl'=1~~ON ( ~ T t AL ~~e=;-l. S -'=01 ')
,,,,~,o'>t':o~:';L1'<;;,;,:,,,,,~'-"" .., , -
Jul 23 07 06:25p
Cr-ater Iron Inc.
\'" ~___.r
. .
~~
~
!C
f
~.
~~
, \~,
f D
~;t:;. "
. ,
~,
~, "
, ~r
" ':.NI'
z. ~
u u ,
~d
(I)~'AI
~O
w
>
,
I
?~;~.;'.'
, f(?GC;
.r:~:',:,~,~' ......
-.}i'~<::':,,/!:<, .-
/~:,~; '.", PL Jix9xH wi -
~:t?,::-, (Q) *-'x3li- HEADED
:"~:;:"{, STUDS IN (2) ROWS
::i.:,{,....', 0 '6" o.e. HORIZONTAL
to.......... .
"l~~I/; :.:
\,
...,' .r:,.;...
541-664-2081 p.s
WHERE OCCURS
...'
to
-----'
, ,. ~=e..
17 .L. "-: ~-
~'1< I 'Z- /I~(M~)I!
~
~"Z-
l~'~ '
wi ER~TION
(2PLTS IN
(Sl\JIIt.LJ HOLES
~ REQUIRED
2 1/2"
(RETURN
TOP AND
BOTTOM '
- ~A
.,
~ -
'...WF BEAM .-
t(t.r- . PlAN :r:
~6[> C
I P
~6 \ TYP. E
r
-'" ,". ... ~.
cv
(j.':::~; 6'
~'
,
30'-0"
(N.T.S.)
~
(2) #7 CHORD BARS
TYP. '
r3
~~ 1
r (~
I
I
I
,
I
I
I
, ~ :
x, "!' :
, I
I
. . , 1'- - - - - - - - - _ _ _ _ _ _ 1 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.~ ;- :
I
I
'-
r
1/
I'
~
~XL
~"";1
RS-j ·
\
*,
;
, ;/
/I
I
-_.,----------------------~-------------------------
I
I
I
I
I
V
/}i
-tl
<5
<>
~ ,
t'l
...
,.
"
@
10
"I::
I
- - -.~.-.-~-"'-,----,.-.-~....~._.... '_R...
#.4 ..tp.. 15" Q,c....
I
I
'----------------------1-----------------------__
I
" ,
,~
\!c;.~ S-201 PANClEL\';.v',
1-'3I-ol
~
PANEL
W=29'-~"
T=S"
s
~
o{-s
(-4' -0")
I
\
:; 'F.O. PIT'
())
I
$~s
'"':..=>~OO
ltJ "
o
s--
~,
,
BIDDER DESIGNED
STEEL STAIR
,
"
(X') ;
c1s-~
I-
L
-.J@
r A~Tl A L FD/'J, PLAN
s- lot A
7-3 I-OJ
-. -'----..
~~!l!
~
BUILDING CO.
~nS1a;
~
....:.&.01...,1.."" .......'..,
Request for Information 063
.................. - ~. .~ -'-"' ~ ..,..
- ~-,.. -- ~.--"~,","." .,~.~"
.
~
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
RFI #<063 ',- --:-' -- -:;-,-' --:---- -: - ---- - - '- Date Createa: 7/25/2007
Answer Company
KPFF Consulting Engineers
111 S.w. Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Co-Respondent
Answered By
Andi Camp
Author Company
Wild ish Building Co.
P.O. Box 7428
Eugene, Oregon 97401
Author RFI Number
Authored By
Tony Dean
Subject
Chord Bars vs brace embed
Discipline
Structural
Category
Drawing Discrepancies
Cc: Company Name
Contact Name
Copies Notes
Question Date Required: 8/1/2007
Reference Brace Frame embed, detail2/S-304 and tilt panel wall elevation, panel #18 (as an example), S-201
We believe there is not enough clearance to satisfy the minimum concrete cover requirements for the brace installation,
taking into account the diameter of the #8 vertical bars and the #7 diamameter (including the knurling) to allow the
minimum 3/4" concrete cover for the #7 chord bars.
Please review and clarify installation,
Suggestion
Answer Date Answered: 7/27/2007
Provide (13) #9 x 5'-6" A706 bars in one row at centerline of wall panel, allowing chord bars to run by on either side. See
attached RS-6.
Prolog Manager
Printed on: 7/27/2007 JLT_Projects
Page 1
~- '
- - ,... ...
:~~..~~~~~ .
Request for Information 063
J
Detailed. RFls Grouped by RFI Number
5258 Anned Forces Reserve Center Complex-ll Project # 5258
3110 Pierce Parkway Tel: (541)736-5843 Fax: (541)736-n16
Springfield, Oregon 97477
)~fl'#.:"OB3'_':'~ ~,c'" _" "."__~;".;,,,~ __,_ ,..~' _, . , __.. _, _,H' ,__.. '~' -~Oate,Cr,e',Hed~~7125/200.?,
~'~-~,,~tr; ..'.,
"'.:.'\'.t:'n_r:;':','
'~~::/f',<".,
Wildish Building Co~
P.O. Box 7428
Eugene. Oregon 97401
AutItOt..~:" "
'\,.~c.i,'~"':,?~:lj(<':':, '..
Tony Dean
,~'
:S~',
Chord Bars vs brace embed
,DIacIpIhie,~':'~"J: '
Structural Drawing DiscrepanCies
Cc:, :,~nyNaine '
/~:-- '~<.....:,'
~.. , , , " " .' ".. .. ,:_i.....JkMf.!OO7
Reference Brace Frame embed, detail 2/5-304 and tilt panel wall elevation, panel #18 (as an example), 5-201
We believe there is not enough clearance to satisfy the minimum conaete cover requirements for the L.a...,: installation,
taking into account the diameter of the #8 vertical bars and the #7 dia...a...c~.ar (including the knurfing) to aDow the
minimum 3/4" conaete cover for the #7 chord bars.
Please review and clarify installation.
'~~i~'
Anawer '
D8I8 Ari8wer8d:
f~o"- \Df.
6~) it- Cf
X. 51... b II It ""1t::k B ^" s
,~
6.... ~ ~ \JlS
A:r
c.e:U'T~\....\ ~E.
of'
W A-u..-
fl\W'E,L) AU-Ov.Jll'J~
G\t)E .
~
BA9-s
1l) '}t\lN ;By C)rJ E:.\~c;L
-S~~ J\i\ Au-\S~ 'R s - L .
4~; ~ /i'-F'Fr
1-/Z'7-/D~
", .ii...., Manager
Printed on: 7125/2007 JLT_ProJects
Page 1
EMBEDOED PLATE-
1x6 (50 KSI)
CL OF" COLUt.AN__
HSS COLUMN _
REF. ELEVATION
TOP OF" CONCRETE PANEL
tL RE.f. PlAN
~
:~:
(
,: Ui.
-c~ 1YP:
~~
~-7
. N
'2.1. \I T'(~ .
SECTION A-A~~~":~~,
OlDO 0 I)". a...o.e .,,'~
"R.w.\I\'S.~ 5€c.:nON A-A
(4) SIDES \
lVP, I 9-,SV 14
~......--
I
I ,
. ..... ~ : ..........--..... ../
:~ ------ ---------
, 1 I
. II
~,i
" ,
"'"-::-, ~ ,,~
'"I
;' /d
AL
-1A
---
9
(3) ~~CE CONN. AT PRECAST PANEL
530'-/
~
"t" .. GUSSET
PL THICKNESS.
_ HSS BRACE
REF. ELE.VAnON
--- CL OF" BRACE
HAND nGHTENED
EREcnON SaLTS
/IS REQUIRED
*" GUSSET PL PLATE
(50 1(51) ,
PRECAST PANEL
"'/----.....,.
--.....
/'/
~......---,-~........,,-
......1
0,.
(',
')
I
!" ... ~~.,........ _ .....h'.. '"
, !,
, ..... .....~..,.-,.~._~.._......
'.... . f.,..,-. ...._~-..~. ,.'....-., . .;,
j
i
i
I
I
I
;
iF:" ,.".,... .,;,,,.....,, h . _",
.,.....-......_..t..........._._...
_ _ .. _L ----________.. 'P-"'___
..,._-~_.- ...........
...~ .-- -'-"- ~""'-'"
'j
I
"
"
:11
"
II
i
o
I.,
0'
r:
~...- -... 'f - --. -.--
"'---....
. '\
..- .,..................-.. ...........-......-.....- ..........-....---....
I
./
,
',-_... - ..... -, ", ".'...
.. ..........-...-..
II
,/
, 'i. ::
#'<0 /OJ t~ 1\ ,
, , .~~::
- ..-,~._. .......,.~----i; '1_
f!tiPllJ ' ,." l :
-
.." -'"
;l"
,l
'Z'"
..' -~: "'I" ";;~iHl~'." "~~f. :
". l. ~:. ~ " '.'~;;:;;l."'.. I ..
" ,,::, · -, ' '11-7", .. ,'J 61>
..." y~.
. :-. / '--:--
I
!
f Y. ~ ('Le-Ak.~1\t~
.. , '/I
i .. ~e6-.<.J, ~s fA'
I
, 1
I
R~r Z!S3,ot7
g.>t.~}'Vl"~ ~:~irl,. ~it~ J SZol
. .
,
;"
j ::: ,I
. . '.. - ''''''--. '-" ,- ._d.... _ _'na._.. ...". .~.. .
~WI~I)JStll'
.~
BUILDING CO.
~.....r-..IIo:..,,,..il,"""~
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Im::llti*'I!~ 1 ~ ll.l!l LlJIIIn
Answer Company
Green Building Services
133 SW Second Avenue, Suite 201
Portland, Oregon 97204
Co-Respondent
Request for Information 064
Detailed, RFls Grouped by RFI Number
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
p~
;
IJ; ma:.. a:r. ,':lo"W'jI'(:fr.DIif.
Authored By
Tony Dean
._ .,~ .4_0 .....~..." _ ,...~.~.... ,,\~_ ,.>V'"""'.....",. ",~T '" . l . _,,___~,
AnsvveredBy
Alan Scott
Subject
Length of Studs, S-603
Cc: Company Name
Author Company
Wild ish Building Co.
P.O. Box 7428
Eugene, Oregon 97401
Author RFI Number
Discipline Category
Contact Name Copies Notes
Question
Reference detail 15/S603
What is the desired lenght of the 1/2" diameter studs shown on detail 15/S-603?
Suggestion
Answer
Provide 5" embedment.
Prolog Manager
Printed on: 7/27/2007 JL T _Projects
Date Required: 8/2/2007
Date Answered: 7/27/2007
Page 1
Request for Information 064
Detailed, RFls Grouped by RFI Number
5258 Anned Forces Reserve Center Complex-ll Project # 5258
3110 Pierce Parkway Tel: (541)736-5843 Fax: (541)736-n16
SprinQlield, Oregon 974n
E~,~
~~~r~"" ,.,' "\"::,"i'r~>!i~"i1i.iii.:\"Y ""'''':'
". .'" "
'. .. ",. ,-... . . '. '.
~ _ ._~......,,~- :r~""'- -.-
......BL~,fNJ'...~.1q~l~.~.I.t..
. J.iji_'f..tyr'C::",,?!::-,~ot'3'J~~~i_;;:\':{ ',' ,
Wildish Building Co. Tony Dean
P.O. Box 7428
Eugene, Oregon 97401
,'.~
~:.ni~
, SUbjeCt,
Length of Studs, S-603
: . "CI" !,....ll',.... .' '.
., ',', C......"
cc~ ' ,:C,:.,!<.'....'",JW:JN8me
,'~':"""'"
'~/''''..":,'.,.,,
~"
Reference detaR 15/5603
What is the desired lenght of the 112" diameter studs shown on detail 151S-603?
'~,ifon: : "
,~,.~.~
"AMW8r:'
~ A.........'.....'J:
f@.. 0\1 \ t>~
S'I
Ef"1.&Ql)N t:Nr.
f.N~: c., /t<:F'FF
1 !2t,~r
~
..~Y
Pra/og Manager
Printed on: 712612007 Jl T_projects
Page 1
~6>
~6
.....
PL )4x3xO' -8ft
METAL DECK~
AS OCCURS L __\
t==-=
~METAL DECK
/ REF. PLAN
~."'.~. ,,-. '.':';';ll_~';~.'----- w' ,=J..
I ___
.,
c--..
L4x4
REF. PLAN
~
TILT-UP PANEL
REF. PLAN
.
--' r----
@
S -(, 03
fVJ. ROOF DEC.(
oE~:>E\J):CU~AR TO WALL
1"=1'-0"
, (,
fWiffiOlSlf
~,~ ,!#,,~~,',,-, .,,;
~,,~~,~ ~
- BUIlDiNG co.
-
Request for Information 065
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843
Fax: (541)736-7716
1I~~I!_OI;\f--"''''''-'.
,H
-"
~~.~~_.....
Jib.LlsJ:ilI~~i,~l~{ejif..(o!~
KPFF Consulting Engineers Andi Camp
111 SW. Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Crater Iron, Inc.
419 N. Front St.
P.O. Box 3666
Central Point, Oregon 97502
Conrad Morse
Structural steel questions
Please review the attached questions and sketches from Crater Iron and respond as soon as possible.
1. HSS sizes @ grid 1 & grid 22 between B&C are correct.
2. See attached RS-7: Provide 16 ga bent plate for roof deck attachment.
Prolog Manager
Printed on: 7130/2007 JL T_projects
Page 1
~
Request for Information 065
II 11,1, I ~III 111111111 1.__II__I-...r
Detailed, RFls Grouped by RFI Number
5258 Anned Forces Reserve Center Complex'" Project tI 5258
3110 Pierce Parkway Tel: (541)736-5843 Fax: (541)736-7716
Sprirmfield. Oreqon 97477
_~dl:J'~~W~~:17.....i:u'.i.:\t""i\iilr''.''\'f'. '\tulii:"'~' -- -~"Ji1~t*!:F~""~:~I'i.ril~~"'~)'~~~Il~_.....~.iiDJrlJl
~.~'~i";:':';'<'<?:';;;~:;:-:!~.\f~~t"'<::'!t'~~~.~~:~~t,':~3~;i'~!:.;~i~;~.J/"~';"-':"'.:
Crater Iron. Ine. Conrad Morse
419 N. Front St.
P.O. Box 3666
CenIrBI Point, Oregon 97502
:~_~~':;t;,"'",,:
CORl.~__" '
.~.:';..: :,
,&Ibjed", ': , :' .'
Strudural steel questions
""~:
. . .. :. ..~ "
,':,.,'....~,"
'CC:,:..~'...- '
-:/~":'"
,~:;_...~,;O:';/<,...,;, ::
. '~.. ;.~~
. "', ."
au....:"."" ..':., ""- :",:, :",...., .. :..' : ..' ;.,'." ,,'" -, .... " ";.',12iifiil:~!\""
Please review the attached questions and sketches from Crater Iron and respond as soon as possible. ' , , . .
:~
Aa~,:'.'
< :,:__il~~~;.....;;.JJ:"
e 6l2J.1:) \ ~ cSRJ.ti 2.. 2..
I. \--\ Ss '&\1:C::S
Cd<<. e.c;:{'.
BE'f'v-J E:c..>J 'B +' G
f>.?E...
2. &=r-:
rDR.
A--rr ~D
~F ~E;-c.K:
"R s - 1-: r"Ro '-i \. t> (::.
P(rr AU\ME:N T .
tk.
G{>...
-oSl'o-lT
~
Ar<D: ~ / t:lf'fF
"1- /30/07-
Prolog m,..,..."',.."
Printed on: 7/3012007 JLT_~.~;....
Page 1
Jul 30 07 08:49p
C/"'ater- Iron Inc.
541-664-2061
p.l
CRATER IRON, INC.
,
419 N.. FRONT;'lftGIl:I + CENTRAL paINT, OREGON 97502
P.O. BOX 3666 PHONE (541) 779-3383 FAX (541) &64-2061
S7>~- Z"Z7 - -27-zS I
Facsimile Transmittal Sheet
a
.,
To:
COmpany: K'F F P Page 1 of '2-
Att ~. ~c tL 7kA1Z I -p,=- Date: 1/%/07
9uuun. ..1 -- · , . oBt,4-~ 'Pl>T.
RE: k~"",eiv ~er> 1Z~t:rJ2U~~lcrlZ _ D~"1{::. 'Z~el
Fax#: \.... ~'>- 'Z"Z7-"'7CY ce.O
From:
e tnJ,rz..A...o
'f.-'lD1ZSG
//;;p.
( 17~d'1
\,'1.
Remarks: P~~5 VT5-f2,.lF--Y I-r:~~ 'S>I~S: @ a."(Ztc'- .. c:a.e~D '2'Z
~.~ c;;,e to'O:: e>.zf- c. _ t:/~{~,J ';J.kU!,Y30 ~-/O~A 4- S- 'o~""
~~o I CA<<..S FP-iZ.... 14'SS t-~~b~3-/~ 1'. G/Z:.JO "'2~ @ D/S~'"3>o1
""
CA,U-7 ~ kt--:..S 1t-)!..lD \Co t/"Z- ..
~..
\
'1. P~C'if A -r"P' eo \1 &
t.b lC 4-x: ~/~'z( o'-~ @
v'Gf2=rt CA l- #
DV12- ~~- 'Ie. C~~e6~ TD
I
J<'etrF 0 .w.J Dl"'7,r J c. "" It TZ> '8-&
Ce::; '. lLhl-bl?~ ck.J....... .;..;"..' ~ ~ S
'!==--.Q y; ~fI,- 7A?b_ J' , I (, D'S ',s.o ,..;;, .
.. .Jul 30 07 08: 49p
Crater IrQn Inc.
541-664-2061
p.2
/.'
\ {pl- ~,z...
,
,
.A-rz.~~
~'7~sr ~~
~/~07
I
~".,~~ .sf-a ~
/
-
1 '-qL.~
/
StL - (e..
f3.rr - ....;-
~~~1'
!l\lJ .--
ow.To 6r / I
. . .
--
r:--~ ,
...: pl:J#..e;tf ~
l~ I 4- tzvo ' _______ / ~ 'P,zv li8 )
..--- I C b~9 ,~ ,1 ,/
/ .- ,If P'Lt? t'/'P )
./ "" ' .,
~ I _
"---=t ~-.... ~
LIP }cif-x ~I& ~ e~ ,
'-k,. -i ~ID. P IPEi-
I II
~r... ~ 1"7z.I
1Z.PtrF t;;:> s=e.-K-
~ Va V3-12 31>
,~
S~CT - :x-
ft<-eF- ~,~ os .1~ r~.. '\
l' "5 -bDfa )
8 c:.kr 01'<'-<' f\",", ",g k>t>
L.c.NN. . ~
~
.
Request for Information 068
II ..'.....1 ,;11'. '" .1Ii"","".l~" ...~". I ".,... .lI.l I io; . . ....1... "',.,I~ I.,...; I 1.1;. . I. _l.. -' ~ 10."1&............... ..,,;..... K:.o......l.... .-.o..J.., ... ~,....
....Ill......
Detailed. RFls Grouped by RFJ' Number
5258 Armed Forces Reserve Center Complex-ll Project # 5258
3110 Pierce Parkway Tel: (541)736-5843 Fax: (541)736-7716
Springfield. oregon 97477
.: II
Witdish Building Co,
P.O, Box 7428
.J:::~. O~8f.l,,_~?~Q~.__,__._________,_.______
Reveal \IS Rebar Issue
Many of the tilt wall panels have intergal columns with reinforcing steel running vertically, with 314" concrete cover, The
rewa! Sfrips run horizontafy, ......v....these columns. It is impossible to maintain concrete cover between the reveal strips
and column rebar.
Please advise,
r~!Iii~~~~~I~\,
MA I t-J T A. , tJ -;3 / y i( C 3 lJ E;e LO
!-oNel (vIJlllJAL /<..f?/ItJP: A J
r< e tle;Q L S A ~ 1O 0 P F ::; E I
\ IE<; pn DJ/L\ tee-veAL ~
) t'f: /2) - q A 7TA?4W
NI c Lr
SAIl/C/
?C Iff
0/2~7
Prolog Manager
Printed on: 81212007 Jl T _Projects
Pagel
IOZV
--
-
. "
..
.
-
..
. .
.
- ". .
.
" .
.
,
. .
..
. .
. .
.
. "
,"
".
"
.
.
'.
.
. .
'.
".
.. .
.
.
. '
. '
.
.
.
. .
...~, . -,......
. '1~ -.
.......-..-., ..-
.
.
.
. .
..
. .
*. ,"
-',jTITIJJ
. ...,......,~.~.
I
" I
OF PANEl
!5'-~-
I OF PANEL
25'-~"
(4) in.-
CHORD BARS
TYP.
@
~
1
I
30'-0"
(N.T.S.)
REF.~ '
PLAN' ,
r~"
"- TYP.
7.- U.N.O.
I (N.T.S.)
I
/
b~
(2) 117 CHORD BARS
TYP.
,
,
j
~ 'j
;
i
= !
I .~ '
1 t
'I
I
I
"
I
f
I
I
I
I
I
I
Ii
I
-----
--~r-_
:\,., . ". .
~~<t!O.<._.lI,,~"-""~".,..,"'"~.,.~'f'
~~~~ :U$1 ~ 1'~i~
u
d
I
,I
,I
~I
t
I
~ I
:Wl
r- . 5-5ln
I
~
@
to
~
,
~
N
"
,
."
I
t
I
I
I
,
- It
"
~~-:-~--------------
~-----"r
F
~~\
14 C 15" o.c.
I i
' ,
-~-~.----------------- -,
. ,
"
[DJ
PANEL
W==30' -1138-
T=6"
Vs taL-
TILT-UP PANEL PIER-
-- #3 TIES AND CROSSTIES
@ 6" a.c.
Q.
~
.- ~
\2v
~~
1
~ .r;
G - cr
.~ ~..,J
_ ,0
(
,..
REF. ELEVATION
'\
~ <
;-( 12) #5 VERTS FULL
" HEIGHT
.;
.. """-_'_":11;,1,1.,.",_'.1.1,' ".,
\ ,.
. J/.,
. .. ~ 1.('1' olWolfW'/I,
~iAL.
@S~3
TI'_T-UP -P;ER J:TA:L
1"= 1 '-0"
- I
... ,~... . ,., '....". "" 00_",., ,,,., _,... ',.__""''"..'.~..,...,.. 'H...
I Project
..... , Locofion
~!!/IJlM Consulting Engineers
'Client
Portland, Oregon I
~
~
"
'-
o
,
""
q
L ~('Je CJ:>()N~
E'i1L
'"
"
" /il
" )oS /,
--. :=~~/ I ~
~ < /
~.i<
.B
")
. ~
~, .-J
~ W i <(.
w ~ Iii
-\LC~
t- 0 rr.~
-
~
":J
\-
-~
.j- '-..J<.
__ z........
.t'\ ()o ~
(- ---i ex
~N
-
I By N S
I Dote'f1 /'1/ 07
I I I
Revised
, Date
...."
"
'\.
."
<E9
CC)
~.
~
~
~
-q
c
, Sheet No.
,f)'-l
I Job No,
I
'.~n~VlSIII
~
BUILDING CO.
f o~1QJ j
liLo~~"""'"
Transmittal Cover Sheet
~::tt~_-=~!lI:l"~~UI. Jill ,II!o.I.~ _
. I II III ...". ... J ~.. .,~_. _ LI:' ~ oll .:.......L:..",;..,.,~ .,,~I. ..
Detailed, Grouped by Each Transmittal Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
'Date:_.--8/22/2007-:-:-";:'-:":.;:_._-_"::',-::';:"_';'-,::,:_.:..._,~...:::.. -_.--.:....;:. ----:", '.. '_;=-:-~':: -:-:"-:-;::~Ref~ ...,0290:
Transmitted To
Andy Elliott
Meadowburke
Transmitted By
James Thomas
Wildish Building Co.
3110 Pierce Parkway
Springfield, Oregon 97477
Tel: (541)736-5843
Fax: (541)736-7716
Tel: (916)920-2876
Fax:
o Acknowledgement Required
Package Transmitted For
Information, As Requested
Delivered Via
Electronic Mail
Tracking Number
Item #
001
Qty
Item
Request For
Information
Reference
Number: 069 -
Date Created:
8/7/2007
Description
Tilt Wall Panel Questions
Notes Status
Required: 8/14/2007 ; Answered:
8/22/2007
Cc: Company Name
White Cap construction Supply
Farwest Steel Corporation
Contact Name
Marc Lesher
Kevin O'Brien
Copies Notes
1
1
Remarks
Please note the comments provide by the Architect and proceed accordingly
L I
/1' ..-/--
Signature
g .. "2-" . 07
Signed Date
Prolog Mar{gtfer
Printed on: 8/22/2007 JL T _Projects
Page 1
-IWdI!I)JSHf
~
BUILDING CO.
_L..I(1l11 I.., '"' ...:;Ir.;.:..;...
Request for Information 069
._---~--"'.. ."~
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
~~~'::IIi:JWlil~11 .....- '111'11 .~,~
Answer Company
Barrentine Bates Lee, AlA
200 North State Street
Lake Oswego, Oregon 97304
Co-Respondent
...~,:.;;.;.~;.::~.1.;."" '......;,,"~.. _ - _.: ~...:;.~.~ .. "1.,." , '. ~<.
Answered. By
Mark Danielson
-.-, -.-..--....-.'........u.."'__...,..'" ".... ",., "1f.riOi:lflOJ.:I(:1,iIIif;),/...XI\i;M
Author Corn pany
Meadowburke
Authored By
Andy Elliott
Author RFI Number
Subject
Tilt Wall Panel Questions
Discipline Category
Cc: Company Name
Contact Name Copies Notes
Question
Please see the attached marked up drawings.
Suggestion
Date Required: 8114/2007
Answer
Note the revisions on the attached copy.
Date Answered: 8/22/2007
Prolog Manager
Printed on: 8/22/2007 JL T _Projects
Page 1
FROM :WILDISH BUILDING CO
FAX NO. :541-736-7716
Aug_ 21 2007 06:40AM Pi
~,<""""""
: .' . ....":-
. . '. ..' ~
e 'II.
,. J:.
Transmittal Cover Sheet
9,zl~lJ?
j11 AR.1L--
Detailed, Grouped by Eech TrE:1nsmit~' Number
5258 Armed Forces Reaerve Center Compl~l(-Il
3110 Pierce Parlc.Wl'IY
~1J"ingfield. Oregon 97477
Proj~ct '# 5258
Tel: (541)736-5543
Fait: (541)736-1716
~-
Transri'dtllBd To . Transmltted'By'
Nick Saari James Thomas
KPFF Consulting J;:nginl'K.!rs Wildish BUilding Co,
111 S.W. Fifth Avenue. Suite 2500 3110 Pierce Parkway
Portland, Oragon 97204..3628 Springfield, Oregon' 9747"1
Tel: (503)227-3251 Tel: (541)736-5843
Fax; (503)227-7980 Fax: (541)736-7716
o Acknowledgemunt R~quired
Packag~ Trllll'1tlll'l1ltted For
Comments
Qeliv_l"ed' \lia
Electronic Mall
. -Tracki"'9 Number
Item'"
001
c:ity '.Iteam
1 Hequesl Far
Informatioll
Rell'elrelllce '
Nl.Im~r: 089 -
Date Cr61sted:
8/7/20C!7
Contact Name
t)e"erlptlon
1111 Wall Ponel QlJestiom;
Notes Status
~9qlJlr8d: 8/1411.007; Anllwered:
Cc: Companll Name
Caples . Hot$$
Remarks
PI~liIse respond to thfl attached questions as soon as possible.
J.j
~ 1/
-kPllA,;>",' ~____.___ ___. , _,_.. ,_ ,
./. Signature
p;;;;' .- ~;;~;;~:"--""'-p;;~i~;;';;-~:- ~fr~ooi " ... .JL'I"Jl>rDJects
_ fJ..-:Z: 9.?__
Signed Date
PliIge 1
FROM :WILDISH BUILDING CO
FAX NO. :541-736-7716
Aug. 21 2007 06:40AM P2
.~
Request for Information 069
., .I
~~. -"".",,,,-~._.- ,- - '" --.. M4.!hl ..)'''''~"'''"T-''-. - ---..- -.'-.=:; ,,~.~._ :,,'
Detsiled,Rrl~ Grouped by RFI Number
Project 11 525$
Tel: (541)736-5843 Fall': (541)736-7716,
Co,;,R~p'cndef'lt .. ", .
.Author RFI Nun,bor
Subjel:t
Till Wall Panel Queslions
Cc:,: .: e<impaiuy 'Name
DIscipline
Category
. C...,.i....t Name
Copies Netes
Que4tlen
Please see thsl attech~d marked up drawings.
'SugSl8e:tlon
Date Required: 8/14/2007
Al1s\IIrQr'
'Date Answered,:
Prolog Mansget'"
Printed on: 81712007
JLT _Projo;:cts
Prige1
TOP OF PANEL
El. 20'-1~. ,
,,- M4 R
,rJ.(
i
!
!
t<
(2) 117 CHORD BARS
1Y?
I
, i
, l' "I vi
.?'~c; 2.'kJ
.. .
, I ~
'I' '
,'"\
,
Ii
I i1it A
, 1/ 0
l -b ~ 1
j~t!
~" II
;;ll~ D J)oO/L. "f1UfYY\t (rZr<-
~~l.! WI~l\e.- /t ~7 ';
."
;u
'0
3:
..
E:
.....
(i) b
U1
I
tI:l
C
.....
r
t:I
.....
Z
Q
n
0
&,4- @ 15"
D.C. ~
~
ANEL
5'-2~.
"=8"
/
."
D
X
Z
P
~J
;
...
u
o
..
()J
A
....
I
-.J
0J
0'1
I
-.J
-.J
....
0'1
:
N
@
Ln
'tl:
I'
)
f
D
j:
.. 'fl'
[\J
....
[\J
(S)
(S)
-.J
(S)
0'1
..
A
(S)
D
3:
"'U
0J
FROM :WILDISH BUILDING CO
~:
g
.
N
@
Il')
~
'-,.
@
,.' -';,I!
, '-0"--"
~f
, ,.
~r
FAX NO. :541-736-7716
30'-0"
..-- ~N.T.S.)
.....-.. ..---.......-----... ...---
q
N~
.-1
@
Il').
~
,d__ ~4~" '1C'-y-_
I@
PANEL
W"'20'-~"
T=8~
sto,
~
Aug. 21 2007 06:40AM P4
~
fa
'O'~~"
TOP OF" PANEL
EL. .30'-1'"
to Q
71 )f 7 ))0/lA..
L1MPI.IIM, I<. b.
~
I. o.s~ ?
ctl,... D - 0 j
t~r.i c.f'I.. 60 1'Io/IlOo(' lJ
J'JOl7.... WJa'1' ~
BOn-OM OF PANEL
EL O'-l~"
TOP OF_ SlA8
EL. 0'-0" .-
.@
,
,
f
,
FROM :WILDISH BUILDING CO
FAX NO. :541-736-7716
Aug. 21 2007 06:40AM P5
cr
~~
10'-0"
20'-fZ,t'
30'-011 .
Z e (loll.. ~fA(~)
e~.1f-t61131_2"
..., ,;.,-~
-
- - - - - --- - --'. - -.. - - - - --.
--- - - - - _.. .- - - - - ....... - - - - -.. .- - - -
~
1 .
, 1,
./.'-:...---.
~ . . '-
.\
"
".r
-
,.
~
~
I
-~
;
--
...
-
------
Q
-
------..
--..
~~._- .- CA Ti-JALI<1.V 41-:-611
()
------
--
-----
--
-
.J ..."
- CA TWALI< fi) 10'-cZJf"
------ .
T------
-
--------
----
Q>-
. -- CA TI-JAL-K 'fi) 14' _~"
(" -.\
\" )
....--..
<,
----
-------
~
---
----
- -' 8'-0"
. ___________. . I'! ...~ r
.......
I....,~...
0----.,. . I
I
I
I
I
'-
~-
---
lv ;;-7
..-.-' -;-~,
(2'\ I \
\-:=.:~;J ~ \ ,1 ~ )
~-
ct;--/r
- .,.&,.. ~"':
..~ I
. I
I' ,I
, ~'
,. i , -, . I
iPq
.. '1l _ _,~,...Ol
@
VESTI~UL..E
I 2B6i I
I
..... J 17)211
1.~8
FROM -;WILDISHBUILDING CO
1Il1'., "
1;1.'El
D..~:';
~rj~
l1.
"
,...
@
FAX NO. :541-736-7716
.-......~ . l
r~~,~"....,.- "_,,,..... _
,-~.J ..~-- ----------~~ <€~
. ....
...,. ui
.' ..."
Oz
...,~
, ,r~'L, ,.. -'i
~- ".F .r. o;j
~~~~
""-.
Jf1
~~
- ~
( ~r.--..;t:
...
r
'S
~p:
~I=
,::I
Pi.
:J:
~,
'"'
...
~,
R
~
c.
"
~
.
Aug. 21 2007 06:41AM P6
~~
!-1-
_ ~Iu..
-,.,<()
d~
~'j
~b S'~
~. ut.
r.I c
~ ~a1
~ i2
"'.
1
~.....~u....--..;;;r'J''i-.~'_
, -___......... . \J\ ~ ~----
;::N_. ___
- _ i: ' '::-<",:
_-~"~a> -~--~._-._
:1
'" -~ I". ~
'~~., /....I'~
..... ~
.$/
,,- .:.~~,~ '
~. -'
, '\'ho' """,~
r---~. ,l i
. I ...1
---..- --i --..-... - .--.-
. - - " .. - - ~ .. - - - - " - ... .
, - -..t,
, - ..-- .~ ~ ,.. .....j
--._~J_ .__--
kl~~-
- . ----..---..
,.........----- .......,,"""--,..
.....
"
"" ,<,.., .01 iIIl 9"
,
,
,
l.
,
,
I
.,=-~;.="-:.-!~~~!~._- ,.:' --'-~r'.""
, ,
~.
.
'"
,.
'..~
........ .......
'- ./'
'- /
"', '- .
~
// "" '''-...
/~ .... "
./ . ........
'- _./ '-......
'--.- - I
;::e
...'::f
A
~~.
ITlI1 .' 'D
l:AJ c it
a.:...,....
\I
i!=
-~~
!
,
':::J ~ 'O-,..J \
:- I \r~
NV ~
tf!'
nmw'1~ .
hnl.'-~ q
~ii'''''
""
TOP Cf PAllEl
a. 2-4'-4"
(..) ,7 CtlC'''U &",RS ~
T)'p, \
30' -0"
'~N_7.s..}
la'-!l"
(2} '7 CI-ORO a4~S
LiYP'
'"
------:---------
cv
~..:l
lr.N,a. I
(kT.S.)
:/~:
' -, /,
"
------~-------.._~
oj
a
.
~
D
.n
....
, .
j .-
~f!}b"-~
------....-...------
il
' \
I _ \ /
I \,1
~, \/
w': -I /\
/ \\
. / I,
.-----------.....--
I'
~
FANEl
W=la'-7lll
T=6'
- .-. -..- -.- '.- -...-
S'107
3(1'-8'
{)I"T.S,)
o
. 'u--)'
1
,
/~'
~~L
~f\. ','
,
-- ---..'-. .!. " ----.. -. .
,---------
)('
1':
Ii
Ii
~
~
o
on
'Ib
~' It lS" ",,,,
, "
,
\ /
X
;' \
/ \
~/~
t' I
-~
L
!~
. - - -' - - - ... - - - " .
~--- -
~
P~M:~
\'0'=30' -~.
~~6'
;~
[)
rop OF PANE~
EL LS'-Si'
1CP OF 2ND ;:;'OOR
a. 14'-:)"1
~O? OF 5"...b2
EL. 1,)' -Q~
OOlTOM OF ~mE~
R. -1-4,l$
,
StA6 '0 {MIlDU60( O~eYPill6-.
(i"p) \~S
"
;;0
o
'3
..
E
.....
b
.....
r.n,
I
tJ:I
C
.....
r
t:I
.....
Z
Q
()
o
"
D
X
~
..
111
~
.....
I
~
I
-,J
-,J
.....
(]'I
D
C
\D
I\J
.....
I\J
(S)
(S)
-,J
(S)
(]'I
~
.....
D
3:
:tJ
lor> OF ~Atle:l
EL :;4'-4"
AT GRID C
1
(~, '7 OlCRO 3.AilS
T'!1> .
-,f- m.
111.11.(>.
, [II.T,S.;'
I
:/
l~e;. v'2.~"'v
I"-r ,'-
\ ,
, 1.1 \' ,\ I) : I t
J X:=~~~t:;:~~ _~~~~~~_v,;_ n_.'.. _ 'IL
J'\ ;, COMFJJ.M &/7,6- 0;-' OP(IiIHfI- I
'''><' ,-~..., I ',.
/ .-', ~V'
~,- .. ,.~ ~/ "! ~,'--J
" /. I\. "
t2
II)!
@
;
I
I
I
,
I
I :
- - - - - - - - - .. - - - - -- - - - - -- - -- - - -1- _ - -', _ _ _ __ _ _ _ _ _ _ _ _ ye _. . _ _ _ _ _ I
I I
. ::>\~
. ',1 I
- ":- - _! .. -.- - - - - - - ., - - - - - - - - - "- _ _ J
Jt~;<. '\II~< { '\/'
;1 " / \ I /\ t \
I / 'I \ : / \
( 01 \t: :!\~, ~/ \,
';,. ". ...l I r' " , ; oJ ,:. ". ....~
..,. .-- - -J. -. -1" ... n__ - - -'.-. ..... u.. - -~.. hu -. - _. -n-...)L- n_..]
I
-~-
, "
, ~
"L,
" IfJ
(41 ,7 C ;, RC B/.RS
TYP.
;r
()
1
\ . ..': .Ii,
- - . - - .. - - " - -- - - - - - - .'- - - - - - ~ - - - - - - - - - - - - - - - - - - - - -.- - - - J
.------------------.----
1/
.;
N
-"
,
,
't
o
III
....
71"
I
i
I
I
r-
- - - - - -.. - - - - - - - - - - - - - - - - 'P"
,
..~
~
"ANa
W..29'-lilj';
'r.:e"
~
i>AIIEL
1'I=30'-~.
"T=S'
S~~I
1
.
.!3
L~
''i-
~
n.
I '
I I
. ;
. ,
~ >...)
i.
I
- .
... .
2~'
. \
-~l
!
,
"1l
::u
o
4
..
E:
......
r;
.....
(fJ
J:
tt!
C
......
r
t:1
.....
Z
G'J
n
o
-
"
D
X
Z
P
..
UI
.t:>.
f-"
I
--.J
(..oj
()'I
I
,...J
--.J
f-"
()'I
D
r::
tp
-..
I\)
f-"
I\)
(S)
(S)
--.J
(S)
()'I
.t:>.
f-"
D
3:
lJ
CD
FROM :WILDISH BUILDING CO
FAX NO. :541-736-7716
Aug, 21 2007 06:41AM P9 .
[)
~)
_,__.,...,~lt';:.:~:..... '"
r- A -rol (.. 111lJU.1J16
rd-.JI '
~"'O-.... lJJl~Il,1i U'
. 1
~;~;./~~.
.~-"._--
l"'l-l\ \,D ,~ e> f-1' ~ ~'"'\- ,J l!) I.N\
~.
-~
(4) 117 CHORD BARS-'-__
TYP. '" .
,-- ~'\'
_____to:
- ---
-= -=..'-
--=r '. .~.
\....,1. .
~ . /
.. 'S~ ~ - - -. .~
~
)'-;-0:,.
:na1'Nt: A4b'lll "DJn,fll').... l:NAn"~ '"
Dg W' NlAlil'fA'" .".,,, rL II fAfJ;,'r,.
Cl1bd ....0 f)Pf"~"" GUrAb"tr.. c.'"./JlA.14l )
V th'ilf'4.
(2) #7 CHORD HARS____
TYP.
"
7~:
I '
------- ----1
....t" q - -.---~----- -- .
----- --~----
-...-.-- -.---....
-- . vi
...
,;
2
.
.
11)
.-
... - 0'---
4lIl
~;t.. _.,~
U
<3 L-
A
~.!V
~~
lO
~a"
.
It>
o
7'-
~ ~1J!(j 15" 0.1':.
.. ' . " - - - : ' ~ ,l- -- - ,- .. ., ..-
'L ' ,..---,.."..
. .
~
PANEL
W..,.J6'" o.
r';'8" .
5207
FROM :WILDISH BUILDING CO
FRX NO, :541-736-7716
Aug. 21 2007 06:42AM P10
@*
@
30' -O~
-----.-- ---------.. '(N~f.s.) --- -----.. - ..-
... .rJfJ
... .~-_..~. W -...... i / -
r I...
, .
I
I .'
(.l
" l!" 0
X >>
en
....
@
",~ 10
~
TOP'Of PANEL
. EL. 26' -~-
--- ~---------- -------...
I .........-~-(4): #5.- '--:'_~-
cry, u~ ~~/ 'd, ~ )
. ."
. .........>< ~ i
~ :>.~. ~ .
" / I~:. iL.
-'.~'w.~: .I ,,-
I
, .
I
I' - ,- - .. - , '- - - - . , ., - - - -- , ,
I
,
.j-rJ. '...::'x~"
~\) \1 ! .
. ,
-oS i .",
'~~,.. "f'I'
,.. ~"I} "'- :J
"
TOP OF 2ND fLOO~
EL- .'14'''':0;'-
,
fi
"
" -
~"I~
,
/- - _. - - - - - - -. -.- -~y
I -- .'__."..'M~'.'
..
~~((><':~
{--~_..'
. ., ~
" ~ L. ~
""- ' . \
"\ __ ..1;", 15-~..
~ ~.. ...- u f - - - -- - . t~
t
.
I
-~I..,_.-._-
lOP o~ SLAB
_h' EL 0'-0.
--
.....-
BOTTOM or PANEL
fL. -1'-~-
'l12I
PANEL J
W="S'-11~"
1'...R"
N5D fi,'vA'"iJM-- .
.$', M I4-AIl. 7,) fP,lJeL~ ~ 0, 4 I, '124 4~ J; 'I .
.C'Z oS"'
FROM :WILDISH BUILDING CO
/'
~~-
~
.JJ... -<:"
0:-
X
.~-
~
$"
~
l
€)
Q
~
.' ,-
~~
~
F
~-
~
. L.. .@
.~. L~
, n
. .._..~' f1~
=J "I
FAX NO. :541-736-7716
I I 'ro)' , ' '" ,', ' .' ',' '.-:
: : . / "',. J;l1:t-l ,:' ',- " .' " " ::,' ..
11/ .,.~:. ..', ," ,,'.
I' ." '.' ,
I I .'
I I
I J
II
I I
I I
I I
I I
, I
I J
I I
1 I
II . ..:::......_:'.,.._~
I '.
I
I
1
I
I
I
I
I
I
J
J
I
I
I
,
I f :0),' "
1 I
I I
I I
I I
I I
I I
I I
II
I I . "
I I .. '..- ....
I I
I I
, I
I I
, I
I I
I J
I', . ._-,....--.,~-
I I
I I
I I "
I I " " ..,'
I I ' -=-_:_:... ... __,.:... ,
: : r'~""'''~: "".,' "1'::--:' " =:: -- ;:"
.,. f . " , ' .' ,:, "
J', '<, . < '. " :',
:;- .,.,: :,1 :. < .. : ',' .:.. .':; ',': >'~
r lTIJ....".. 'J'.:'" ".1-:' -': .
\If !.'II I I ' ' ' '. ..;
~II'-~:..,...,., -.,-:...:.-, -,II
...J ~ I I I ,:', . . : , .: ~.-: La'---
V 1"'" ,.., , ". ! ,...
_. I,.' l: " 't:f . ,., r ..
~ Tf-ll,' ',1; ".:~' ,;.: '~.,~'-. >'....:!, ,~.
~ : :;j ,....,~' ::' ',...~ > ',-~;..,-
j ; Ii::,': . .....' gL:",,:".'~~"'::!.,
: : h".:- .: I' '.. ,: :', .
I I ., '. c , '
I I ',< : . ~ ,':
I j I"-~ . -1-<1. "
I " ~-'!__
I -.-... .,-' , , . t-:-
," , "
,
I
I
I
I
I
I
I
N"I' 'T'''-'''" I.,
........:.... .
: ",':. "..~.. ','l "1" .:' ::~:
-:--'::, .. r~. ,'~.: >;. ' ~,', ,'..~.
. ... ..l~.: :.~ , ...
. .' .
. 'I' .
I" .
.'
-- .
Ill. " '.
~ .' ,,,' .',.
. .. :'.... '.. .';"', -I---=--:
, ,', ' ' '-.,',- - ~t -,' .
.' ,,'. . r'.
0' . . . . '.
.', . " " . . : ...... ",;! .' .
'. : "
" . __:J .-.
';"-, '1
"1:1 ..
.,..' " I
~. . M
>-
.'U
"""t\
-.':,
. ..!
;
. ',' --. -. :. ..
. .... .:- . ',' " ,.; ..... ..
rI2i " "
a:m. ,
....
. .... '"
':-:-- .:. ..J
.,
. . . ~ -. j
, '__h_'h
--.""j'
Aug. 21 2007 06:42AM P11
.au,._
....@)
"d
-"
@)
'. .., -.--8)
...)
a
'IJ
r-
~
~
~
r
.J
ii
-'1''''
-@
FROM :WILDISH BUILDING CO
6fJ
_.._'.
~'
~.~
,
FAX NO. :541-736-7716
Aug, 21 2007 06:42AM P12
30'-O~
,(I..,-:r:S.) ,---....
.
, I '
I" ,./'"'",' ~(4) #5
. I r
, ~x~- ,
~, ~
.:~. - - - - - - - ~.
;i ~
\, II;
~~O: ~'
,.~\.
.'-
- - - - - - -~k,--
i,l~
L- ~;_.!._~
:><
I ,
:'"
I
I
I
I
I
I
1
..
I
I
I
I
I
I
I
J
J
I
I
I
t
I'
'i~,
~
PANEL
W=29'-1 ,~..
T"'-B"
--~
@
TOP OF PANEL
EL 26"-3" '
--:....:.~
\
, ~
,I
;/':_-
II. ' .
" BOTTOM OF PAIIlf.:l
"EL. -1'-~~ ... ,..
TOP OF SLAB
EL. o' .:::Ori""'--"
FROM :WILDISH BUILDING CO
if-
~j ,
o
,
U
1;
I
'"
z
FAX NO. :541-736-7716
21-tZ>~!I C;..O...
. ,
I
J
f"'--- .-.....-.--_.~__ .._____..._ _ .. __ .... _._.
-'\
0' _0'.
~ FL..OOR LINE
TYPE X
~
~..'.
3/411 =_mi'-::'?ii,i-~-
Rug, 21 2007 06:42AM P13
~I& r:tl/I...R~;"c,..-
FRot' :WILDISH BUILDING CO
e
,,"-'
r-AIDI~
REF"~.
PLAN" .
-f..o.:p ( S '01 a)
~~EL 1011
::>ANEL
5liR
#7/
:lRD BARS
I
........
-~
FAX NO. :541-736-7716
30'-.0"
.---.-- .' (lilTs.)' ',~ U -...
t!.. All, SNawS, F4.AMlnf:. e..~S7 bl&r;J II
~IUJ J.> 'OI/.Ji.l:f.."'t t
wUetl.f ,\,. VP'rAt.'- 1/11 -So'1 f
,..---- (:it) #7 CHORD BARS
/ TYP.
tJ
_ ,I 4
! .
. ~ . ,
1
,
:1
,I
,I
,I
"
I
!I
it
:.
I:
"
}-
Aug. 21 2007 06:42AM P14
@
.. ......... ~ t_
(,~"
TYP.
-, r U,III,Q,
(N.T.S,)
,t: ,"
.'(
'............. /'"
, . ....--
", ><~'
,,! ./
~ )6ti,
-:' ,- '",I
; --...... -- ,--
. , -----.------ , I
--~ 'I
~ ....__-- _____i'i
r\~- ~~(
, ~:
, i !
, --:....
0___.._---------...
ra :
tj
r.i
o
.
1'1
@
If)
~
/:'.
L- __
I
-ur ,. ..-----------..
I
I
~ ,I , . _ __ . ..__ "_
.
I
.
I
I
,
1
I
I
-r--
I
I
I
t
I
I
I
_..~~4 <<D 1!\,:,..,p,r.,
~
~
,
-,
-J.
;
'- I
-------------..---
I
,I -..--_________
I
[D]
f>ANf.L
W=3D'-11~"
T=6R
SMI' Q.u"~..11 O'l$. fUlL IAnI-I.- / b
S'Zoz...
@)
v
;,
"
:--...'<
" ,,//
"
.-JL4 @ 15" o~
FROM :WILDISH BUILDING CO
o
3Sbl ::
-tel)
~
-
.
~
("f
o
:JSbl j
11\-
0-
t:L- '
--.~~~
--.
.
,
,
~~-'
"17 I"'"
-
.- \r'''ij
4'11'\
FAX NO. :541-736-7716
Aug. 21 2007 06:43AM Pi5
I
I
I
I
I
I
I
,
r
I
I ~
I
I \.\l
I .:: l
: 0"'-~.'j)~ h<"lP ~ ~
,I ~ ~\J\
I ,~<( _I ~ t.
~-q- \..9 i ~
w = ,t'::s'
, ',- ',Q \j~
~~_i /
.'~
'\
'U
~O
12
- H
~:I
U
w
Vl
I
I
I
~
= ,
~!O
I , ,
rU
,~
"l:-
. ~ /~.~
~- .... ~\,.". ._.,,=~J! bo...._
8~~=
· -Id)
\0 ~.\'f
tr -
- r-
J
::1$61
, ,
. ,
.. ';;- -=1'4 '
", R-
"'" .
= \.0
~{
-
-'- .\,
", =
, &'Il'lI~
"\ tr
^- , ~'~ '-=11"\4
{}}~.,. a-
~
.
~ I
7"S'bl
...
\g
I
'q"
'1,'
'==1
- ,
~O
q ,
i-U
Cf~
..
'~ -
.9~
~ -'
~~
~.
ro
0-
.
"""'- '
.
r. -
FROM :WILDISH BUILDING CO
FAX NO. :541-736-7716
Aug, 21 2007 06:43AM P16
~
30' -0"
, '-.,-.-. "'-'--7;.
\N.T,S.)
"
([0
l
~
-
, --
,\,: ..---
'~
I
I
I
I
I
I
I
V
/'~
--
J,
"
"
L--.___ II
, " -.. .- .. -,-' - - - -. -. .
, -
I
I
- - .., - - - - - T - - -. - .. - - - - - - ..
I
I
o
d
{><~
'3l_0 ". ~K -- --- -~I'
, I} W I
, -~) :
:~ Pea. Albl(..:.:r.. :.r... C"..u,-': ~
I
I
#4 @ 15" ~c"_ ,,'.,., I
~
o
@
11')'
qjo
., I.,.
I
-, -- -- - - ...- -- - - - - - - - - - - - - - - - - - - - - - -l- - - ,. - .. .,
I
I
Q]
PANEl.
W=~9'-11J14N
T=S"
S2.03
"
o
....
~
~
.. - ~ ;. ('
fu~~o
I (N.T.S.)
',4
I!
:~
~
,:-
,.
-~
r -.. - --
A
d
d
;)t
I
I!
~'-
;
!~tmn!~J!f
~~~
- BUilDING CO,
.......""
Request for Information 070
j
----I<JiI
Detailed, RFls Grouped by RFI Number
Af1'N ! {JifYI fJ. ~ D
5258 Armed Forces Reserve Center Complex-II
311 0 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
~:.OIIi;ilt!IIIIJrlf_l~,.. "l'l1iIU~,I.I!n__-- 1II.11! !llflf!!i_I)!!1SL'-IflIlI''''"~I!I'~!!IIIU''''''''-'''''-lIhlt4L1f(:F-Ii:t.fIIt:''I,...(iiIJr.
Answer Company
KPFF Consulting Engineers
111 S,W. Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Answered By
Nick Saari
Author Company
Crater Iron, Inc,
419 N, Front St.
P.O. Box 3666
Central Point, Oregon 97502
Author RFI Number
Authored By
Conrad Morse
Co-Respondent
Subject
Connection for W12x16
Discipline Category
Cc: Company Name
Contact Name Copies Notes
Question
Please review the attached field question from Crater Iron.
Suggestion
Date Required: 8/14/2007
Answer
Connections per 1/S606, typical. Trim horizontal leg of angle as required,
Date Answered: 8/8/2007
Prolog JlIlanager
Printed on: 8/8/2007
JL T _Projects
Page 1
,
e
~~J
Request for Information 070
..J
.........,...~ ..,.... .. -~ ,.~...~ .,........ ~. ....~ .,,~.,..'._^
Detailed. RFls Grouped by RFI Number
5258 Anned Forces Reserve Center Comp/ex./I Project # 5258
3110 Pierce Parkway Tel: (541)736-5843 Fax: (541)736-7716
Springfield, Oregon 97477 .
:;;;;;;..~
Crater Iron, Inc. Conrad Morse
419 N. Front Sf.
P,O. Box 3666
Central Point. Oregon 97502
~;,"FJ~_
C~pondent '
SUbjGct ,
Connection for W12x16
'DttClpUn.~.y ,
cc:company;Name
COritsCt\Namec~:,::,..
,,~
Please review the attached field question from Crater Iron.
S~on
'~'~.8M4I200r
Ati....~..~
DatlaArlswer.Dd:
Co/V.N,
/e/Z. 1/>6'0 6
T7P
7~/m
kOIe; L ..
Lee Or
A /((' t:" t-C
~<; )ft?QU/~W.
(Vt {q' S/l~!t I
I(f/Fr
eft??
ProIogManagw
Printed On: sn/2007 JLT_Projects
Page 1
AU.,g 07 07 08: 2710
"
Crater Iron Inc.
541-664-2061
p. 1
,
r
RATE
JRON, JNC.
... ". _M'__ __,.._. ,_~... .. ~.,"".., _"... ..,_. .. 0"""'" __ '."__".,._..__. __._ _'_'~ . .. _ ....... _.....~... "'.' . ..."
419 N. FRONT STREET -+ CENTRAL POUNT, OREGON 97502
P.O. BOX 3666 PHONE (5411) 779-3383 FAX (541) 664-2061
So'S- -Z'27-?'"'Z. S I
Facsimile Transmittal Sheet
a
WI
To:
Company:
1< J-"-; r=
Page 1 of ~
Date: 8/7/0 7
{) Z?>f", 'ZS V"D/ .
Attention:
f-.l Ie ~ SA A r-<-/ I P.5-..
A e31->e:1' ~ r... ,2e.e;.~ _ r .w-::.,V-.;iIL _.PI
tzG5-'='I4-.vEf Ct=:3-I-i~"--' .... ~,_ ~ G;.,
RE:
Fax#: So >- "2"'27- '"7 Cf go
From:
~'r-L~ M~Se:-
Remarks: j?L~5 f"ftZov IDc C~ -v-J~S. Ft:nz:. W'~"""l<a
I () ~"2. K DW r f \M /7.-~L~ ~ C '=:>)<.. g. 'Z..
, G.Er?-t.~.... IV C z> '-"7 t--t 0 1--1 'Z ,.. L. K. ($J ~ ~..
P~~~5 tz::=-AY" J~CK- A-SA p- 1~4Y...-
l~~ YOeJ'1'
/ ~. J
~~A-CJ
c Co -:.
1A!/Lbl<7J-f. c/o J~.:7-::' I};:!;), -,'-'l 50
~ X". ;. + 1- 7~ '- '7 t ~
-.......""~....--------~--~--.--. '-~"""--""-'-.""'-'--""-
5'-0. 5'-0" 5'-6.
f ,J ,I- l'
~ ~, ~
. "'..1 c . cc '~~'" c. "'fLH (350/19 ' , . ..
,C'''~, '",- -- "..T!~~K, '" _ '. ,.__. _" _I_~. .-.,'n
. .~ ".~:. ~~r;~]~~"~-T:-' -~ r-'- r' '-~3:'(:J~~:; i"-i
.... ~ TirC"""'7~K II \ ! IT 'C=1 ,75K I ....
Z - I, II ,,., "'J
~ 16/ (J50/90) 11 I I 1 (J/l90) ;
r,rc";1.1~J( n [T/c-1'I,'5K ]
II . 'i
· W14,.n HIG~.: : : ~ ',8x35IH/GH '
,'..., '~.....W14x41{lOW::: ' :2 ~-'- W18X3S"'iow
II on~.
" "TI
II
II
II
"
J I
II
, --
II .
"
1/
"
I
.. ~
-.
.J.
, rl
0)
c -"",_. ~_,_-.-_~~~.~~ -",': ~ \'_ , _ "
-- ..~ -- -.---..------.., ; (I) I .
~ 111!~ ::
IX , l
*"~~10X6W4 .. I,
~ -".-r :,
'~-o. I
, 110 I
~~~ ~~l3i:
Czl; ~am r
- . I
J!leJ~ m~g I
1;20 r:-cnO I
~:'1a ~-i~ r
Omi: ab1 I
zr--> 0 I.
~d I
fY1::r I
I
I
I
I
.1
tN
J\)
G')
....
z
....
o
bl
"
22K (350/ ,m
T/C=1.75
...
I
V\
I
-
t)
t
\\)
~
~
"
:D'
'l:
n
s~ , 0
8' -8 · r 5'-0'" ., ,5'-0" 5'-0"" 5'-0" .; 5' -c-.1
."7 ' f ,; F 0
-, ','- J
161< (2~()11_30)
T/C=1.75K
en
+
...
I
."
(I)
.fl-
,
I'\)
o
-(I)
...
281< (330/130)
T/C=1.15K
161< (260/145)
TIC:; jSK
281< (360/145)
T/C=1,15K
16K (290/160)
T/C;';1.75K '
J\),
OI!.;
c!,i
, -'
2BK (390/160)
T/C=l :151<
16K (330/175)
T/CmljSI< '
-F
,!
~
281< (430/175)
T/c=1.15K
1:1
.
I'\)
"DV f.u:.n/,On\
I
A,~ 07 07 08:28p
.J..!\:I dfo". I I U.Oi'\
.,
.
Crater Iron Inc.
· .l d~- ~
1-:_1 ;~ ~
- .......... .
, ~ ON
. 't II) /I
: H08 a~
, ' ' :s ~
~ ~ ':
~:-
c;
~
)C . ,
~ .
....
~
6~
......
o
C>>.~
....11)
ar--;
10....
an
,(.)
~.~
NO-
N
i
I
'il"
f:i\~
,i f,;~
: CJ'~
. ,i k ;';:'
· HSS6X6~~~ '~i Wl2x
, :,-----------.J ~c..-- _... ___
,
~ ~rtS ;~ I
........:..... ....
0= .
~:ii : fil
-.0 ~
~ .;:::- 0::
~~. m
,
I
32G 5N 10.5K
32G 4N 15.BK
~.'~'
1"'
541-664-2061
p.3
w
a..
9
CIJ
EL :
'/~~
/ 32G
-~
It)
~~
10-
,." , U
-'(.)
~:~
~:
I :
LaJ
a..
9
en
f
- v "--
:'\
P"L.l:fJ,~ SEE P ~ ,~t\ IJ ,. oE5
Ct)")4.(4,i-t. ro -2~K. v~
.....-..........'
\
\.~
\
'-
32G 5N 10.5K 32G 4N1 O.5K
}L~
. . 50; PSF, i HIGH
~.II1nf4]]l[,J: ~ ,AND
" I ; LOW
, 12' -0" 11 L :
, :,.[ i
~ :
~:
o~
cn,~
.....11D
,;....
o.,~
, In .-
.." . II
-0
~ ,;:::-
~i
......
:;t
.0
;...1
'-
-,
o
cn,~
...-:'10
;::11 ~ ~
r5( It) ..-
cg nR
,(0 (.)
'CI) ~,
,CI) N I:-
L_'J: .@.
l..." ' "
~~..~_.._.._~==-----,-,._.._____.".~_.v__~._..,<"'___,.._."._.._'-'~--~
,,~.
)
,
. ,.....,,~.
....,.
.:..................' ._,;.~__..._~_.:e... It~'
. I
32(
, ~17107
'S-JD4 c.
Mj;f~DJSH1'
~
- BUILDiNG co,
"'~"'" , ., .. . ~...
Request for Information 071
~ ~~, -.~
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
~:~:iI':Salt1l~l'lr"'t"'''i!r:;':'ilII.:w-'Hil'~~j';;jfi'ii:~~::::~m.1:.~~T.:~~1-11~rcJmr:r.q;'m"~'I'ii
Answer Company Answered By Author Company Authored By
KPFF Consulting Engineers Nick Saari Crater Iron, Inc. Conrad Morse
111 SW. Fifth Avenue, Suite 2500 419 N. Front St.
Portland, Oregon 97204-3628 P,O. Box 3666
Central Point, Oregon 97502
Co-Respondent
Author RFI Number
Subject
Revise canopy columns
Discipline Category
Cc: Company Name
Contact Name Copies Notes
Question Date Required: 8/15/2007
When columns were changed to standard pipe from HSS x 1/4, design detail 7/S-601 needs to be revised,
Please review, approve or supply revised detail for this condition.
Suggestion
Answer
Confirmed, proposed detail is acceptable,
Date Answered: 8/20/2007
Prolog Manager
Printed on: 8/20/2007 JL T _Projects
Page 1
FROt1 : CJILDISH BUILDlr,jG co
FA~-< r-lO. :541-736-7716
A'"Ig. 138 213137 134: 11pr.-1 P2
Request for Information 071
, "..
Detailed, RFls Grouped by RFI Number
5258 Armed Forces R8$tfrve Cent6r Complex-II Project # 5258
3110 Pierce Parkway Tel: (541)736-5843 Fax: (541)736-7716
SprinQfield, OreQon 97477
W'lflJllOU"W -'If'.... ,.,~."'.;""..."_..."'""""_-r- !~',. 'i",:IJ;,.,,~
j.;"l'lllwe)'!:Q6mpDMy '-:An8iw!)i~d By Author'COrtlp"riv
Crater Iron, Ine,
419 N, Front St.
P,O. Box 3666
Cen_tralJ.C?intlOre{l~n 97502
.Autlior:~~IN.umber': .'
:Jj,it\',i.,j}i;;\P';:,..;r;~,.:.,lm~C{1i'f~r~
AiJthoredBy ,
Conrad Morse
;,Co.R~~"ahd&tit , '
:Sub}l!()t, ",
Revise canopy columns
Dhlclpilne .tatoQbry
'Oc;:domj:)':li'iy.~-me'
-Col'itact Nama: ' Co'plolil:NoteR
. Que1Jtt<>n.' " "tlateRequlred: 8/15/2007
When columns were changed to standard pipe from HSS x 1/4, design delaIl7/S-601 needs to be revised,
Please review, approve or supply revised detail for this condition.
Sog'ge-lttlClr(" _: '
:'(i1&'wii"::, "
Date Anflwer8d:
C 0(0 'f~(V1 tiJ)
p (2 'D (/<:>..5 'G-O
.0 -e-n l \..
lS
Ace e-fP17\ a Lb .
;VI C-?( S/l~R (
kr~((
'B/lO/O(
,-.'
Prolog Mb":J(JGr
PrInted on: 8/812007 JL T _ProJl!Ict~
pa.ge 1
,~~~.~~~-~^.-::-:-::.:.~~'::.~,~
FROf'.1 : U ] LD ] SH BU] LD I ~,IG CD
At/'f; 08 07 10: 04p
So,>_Z?7-~"ZSI
To:
Company:
Attention:
RE:
FAX ~,n : 541-736-7716
AI.l9. 08 2007 04: 11Pf1 P3
Crater Iron Inc,
542-864-2061
p, 1
CRATER IRON, INC.
419 N. fRONT STREET .. CENTRAL POINT, OREGON 97502
P.O. BOX 3686 PHONE (541) 779.3383 FAX (541) 664-2061
Facsimile Transmittal Sheet
/.~p yr
N t c.,t.. ~"'4-- A r-z. I .P."5 .
,
Ar:::- r.;z c - PN745'G II: C'O~~'2b'Zi)
Page 1 of '2- /
Date: 8 / ~/<{) 7
Jo I, eo T?p T
Fax #: . So 3 -- -Z "-~7- f , ~ C)
From:
c ~ e:-A<-D 'f-q tr{Z..5-e,
Remarks: WJ+t;;-/-J C.eLS. W'E51ZF.5 C~.tG,-'6-P 10 S+~D.~
PI PEE ~ J--Is..s s'd x. //4>.. b"EE-"?lbN- Diii:-7~ 7/S-bO I
/
r--L~ '5 T"O f?;. t=: [2:= V l S. q--"D-
Pt-"lG~'7f3
~c:;\JL""7~
tz 'G \) le5'~f. A.17r'f20 U G erf2- S r/P PL. Y
, /
D~ tl- ~ -rl-t'/~ C{7-Jl-i, C> ITIO ~ -
'1l4;~)L f'tpu- /
~~)~_.~
c C".. I/vtll. 171 s.-l-!, C' Ii? ~ k-r-1 ~c;:.,. ~-4''S
~~ 54-1-7~b- / 7L~
-=--~~~.!l,:~~";";':"'~";"-~_'~~'~____~__~__"'---~__~_~ _ -~"--
" .
FRm1 : I)J I LD I SH BU I LD I t.jG CO
,~\~
:J,
-.0
\5 ~.
'1~
tl~
~I}\
~::t
, ,'.-- '_.~ ...-"-N...}
\'-"__ ,.I -~:
~ I
~.-- ,.
.' ~'4...
\- 1\
L - -;,:-::..~. "
~:'"~-=~\;;>=:"~'\' ~
\ I \ I ' \, --...' , ~
' .,.. ..---"''-.' .____,...h... -- --1-'
--.', ,-'. \.' - I,'.
,l\ ~ ,~ '.---t~ . ,
.\:1.' " .'- ._, \'. "'~.:.-::,,:/ \ .. ..
. -'M~-'l'~ ~
...* ~ \1 ~
..J .:.I. t', ~
\b ~ "t- V..t~
~ ~ lJ\~
\LJU\ J
....~ '^
;:J:
, ."'1
. (.
, 1 \J
\' \~
~,\lJ
};\ ~I-
:i ~ \ I
~ IX
\; {)
\J .,
\i
<1L
.4
.,....
~
_,I
o
?<-
--f}
':L
~
.~ '
\.-\\-
~'d
~\
.9 ., s '--k
J-\ T
V\
\.IJ ~ \
1902-~99"l"'S
I
~
k
,,.,I
\,;.:::..~
-.- -'
FA>~ t-lO. : 541-736-7716
Aug. 08 2007 04: llPf'1 P4
lb '
,~ -t! ID
~.J\ ~~
.~ Xli'
eJ ~~
rv\ ~it
'iT 4. '-::l ~
~ ~ \J\, ,],
L~ .s \t r , '. ,
. tf'I~ V'\ - ': h:-..~ ..::-:::- ~:v. -, -~ r0\
~~~ 'I .- i' ,-..._....._-~-,....t, ~ }
, )::----,-1 I \~
~_ -=::~ I
;:. It "
.. ~ , ~
I' '1 l' ~
, ..1\ - b..
, ~ I () _
; 0 ,0 ~~
, N . r II"
/; ~ ' \J\ ir
~ II )-.' ~ PIJ\
-:-1 ~ ~\~~
~ ;, ~ \ 1n U'
..... / II ~ '^
k\~ ,:r
/,;" ~.' 1.11 (".~~~....
~",. I J\
\f\ ~~' ~ i~t
~ ~ \w
J: ~ l{j~
1 ~ I ~~
i'-J t-,
:' i g
.... ,
VII 4-
-~
~~
V
j
'~
W~
~
~
)l~
':"-
~'
')iJ
:t-
~
--~~~
//'.-...r,-...'...."....'....'"
( ~ s,;.>;:., ",
~ ~~-~~ \,
'-~ ~ t> '.. )
-'" <;;/ "
". ....ol' /' :
,-",..-"".", \m
.. ..,._-,_.._."--"".,.~-,,..-~-- ,
--.----....,- "...,. .' ' ,~,.~.
-:JUI
UO..l!
....a':\e..l:J
'cl~o;ot LO 80 'n~
"--~
-lWrmnISHf
~
BUILDING CO.
...:..,;.... ., I u.kI
Request for Information 072
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
311 0 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
1II~~=~!_.i'i~'~~~f7\.--"""'L,,::~~'i.jl> "Jit.dfi..,."jii!iliIiijhtfl~~,,,.~~rDF.lt.I.~h;'if:r.fIiliII;fjl!;''',.morJi
Answer Company
Wildish Building Co,
3110 Pierce Parkway
Springfield, Oregon 97477
Co-Respondent
Answered By
James Thomas
Author Company
North Star Industries, Inc,
Portland, OR 97230
Authored By
Stuart Holgate
Author RFI Number
Subject
Roof Tie-off Locations
Discipline Category
Cc: Company Name
Contact Name Copies Notes
Question Date Required: 8/20/2007
Please provide location of OSHA room tie-offs. It is my understanding that each tie-off is engineered for a 5,0001b load.
If the tie off loads create addtional panel point loads to the joist girders, please provide the added panel point load
magnitudes and the location of such load for each girder.
Suggestion
Answer Date Answered:
No roof tie-off pOints are required per Rocky Champagne, ORSHA (roof is less than 2/12 pitch, and equipment is over 6'
away from the edge of the roof or opening),
However, at least 6' of guardrail needs to be provided on both sides of ladder access to the roof from the mechanical
equipment well.
Prolog Manager
Printed on: 8/22/2007 JL T _Projects
Page 1
M'iIDDlSlli
~
- BUILDING CD,
.......-'0. fi<. I
I"
Request for Information 073
"'l'8o.~. .
.-
~
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II Project # 5258
3110 Pierce Parkway Tel: (541)736-5843 Fax: (541)736-7716
Springfield, Oregon 97477
l.ialf_!~.i;'J...'1~~~lIi'~"""""----_~-""-""""-~-:Jmr:r.r'ti
Answer Company Answered By Author Company Authored By
KPFF Consulting Engineers Nick Saari North Star Industries, Inc. Stuart Holgate
111 S,w. Fifth Avenue, Suite 2500 Portland, OR 97230
Portland, Oregon 97204-3628
Co-Respondent
Author RFI Number
2
Subject
Connection, RS10
Discipline Category
Cc: Company Name
Contact Name Copies Notes
Question Date Required: 8/20/2007
See the attached partial roof framing plan, note the clouded areas. At the Sketch RS10, Grid line C near Grids 13 and 10
there is shown 22Kjoist framing into a W12 x 16 ridge beam. The sketch detaiI4/S-607 doe snot show the joist
connection detail.
Please provide the joist connection detail for both locations,
Suggestion
Answer Date Answered: 8/13/2007
Joist bears on W12; W12 was incorrectly shown on details. See RS-16.1 (4/S-607); RS-21 (4/S-606),
Prolog Manager
Printed on: 8/13/2007 JL T _Projects
Page 1
Page 1 of 1
Jim Thomas-Building Division
From: Nick Saari [Nick.Saari@kpff,com]
Sent: Monday, August 13, 2007 12:09 PM,
To: Jim Thomas-Building Division
Cc: Mark Danielson (mark@archbbl.com)
Subject: RE: AFRCC-II RFI-73.pdf
Attachments: RFI 073 RESPONSE.pdf; RS16.1,pdf; RS21,pdf
Jim,
Please find attached response, I had incorrectly shown the top of W12 as being at the bottom of the
roof deck, but it actually is 4" down to allow the joist to bear on top. The attached sketches reflect this.
Nick Saari, P.E., S,E.
KPFF Consulting Engineers
111 SW 5th Ave., Suite 2500
Portland, OR 97204
(503) 227-3251
from: Jim Thomas-Building Division [mailto:JimTB@wildish,com]
Sent: Monday, August 13,200711:42 AM
To: Nick Saari
Subject: AFRCC-II RA-73,pdf
Please respond to the attached field question as soon as possible,
Jim Thomas
Wildish Building Co.
8/13/2007
~
~_ _~~e~t ~~ l~f~~~~iOn O:-=----J
Detailed, RFls Grouped by RFI Number
5258 Anned Forces Reserve Center Complex'" Project # 5258
3110 Pierce Pa'''~'''1 Tel: (541)736-5843 Fax: (541)736-7716
Springfield, Oregon 97477
li:l;l.:_i};M_.It:o.....~~~~__,___,__ie/lIII._D.lmiIr~~'r.q
An8w.rmim_',:,. ,'.',',.,, ':~\.,<>., :;'~~_?;:'?'f~::~:~:'i'l";:lrt::~f~;".
North Star Industries, Inc.
Portland, OR 97230
.~RFtNttm....
2
-DfUll'J~ Category
Stuart Holgate
~~
'$q~;;.,',':.,'
Connection, RS10
Cc:,,;. C()ftllp&mj:,NG....
ComacUISm. C9P1HNotlts
,f;l~'i:-" ~Requ'~~ ,IWOI2007
See the attached partial roof framing plan, note the douded areas. At the Sketch RS 1 0, Grid Line C near Grids 13 and 10
there is shown 22K joist framing Into a W12 x 16 ridge beam, The sketch detail 4/8-607 doe soot show the joist
connection detail.
Please provide the Joist connection detail for both locations.
S~
AM....
,Data- Answered:
:r 0 l S,
13 C'1\ V'l S. b f\..J
c....J ) 2 j
/10 CO~I2EC-TL7 ~l-lowAJ
~L- c.=- f<) - /6. I (t; /S -60 7j
,e~ - ~ I {J/S-60tj
LV}""L WAS
o 1\1 IJ r::174 t L. SJ
/VIe k
SA,4;e/ K/ r;=,
ai/riD?
Prolog Manager
Printed on: 8/1312007 JL T_Projects
Page 1
-~._-'-_.._.._---~-.._-,.._,-------.,----.---_._....-...--.-_._...._--_.._.-.--.,-"..~-_.-
I project_L.AUE CUI.J/~?-' ).JrK'C
I Location
Consulting Engineers/
Client 15 'G' L
I
I By N S j Sheet No, --16
: DateS/IO/Df I f<S
I Job No,
/2033' 2 :?, /0
,
Revised
Portland. Oregon
Date
,-~ ~
'\
"-
"-
{~b^ :J ge-Nr
2 L.
~13\..:J wC'tpIJ
-::rOl$T~
KO-O'F ~Ec..t-( ~
~
'JJJ6. ~ I~ ~lL
J/lf:. V } '/2,. -I (,
])
~ 0 c..v::r '- .
~~~
l0 11- ) R c'F, PLA~
[SE.NT R::
fEP, 6/~-60'7
) <;:-(0/
o
RIDGE.. STEP
R S'/6.l - ~Eli. e(r3/o7
PL %x3x1'-8"
rHSS4x4>df6 ~
-- - ~ = ~ - ~ -- - - - _1 Ya ~ 2-12
-----,~.-'_ ~ Ja V2-12
~
If
I\.
"-JOIST GIRDER
REF, PLAN
I
j
r~ ,rr--
BENT PL %xSx12"x1'-S" LONG-----...
wi (S) #Sx4' -0" DOWELS '"
@ 3" Q,C, STAGGERED AND "\
(4) %"(llx4" HEADED STUDS
@ 14" Q,C,
\
~r
~r
@
. .
1~"
'"lU"J\ ~ '"lU"
U4 ,- U04-
4- d.. I
I I /'
-=:.....-
~ S -11
8)
S" aa 6C6
~fVl5tlJ 8( 13/D7
SECTION A-A,
DRAG CONNECTION
1 n=1'_0"
i,M1!t)j,~ ~DlSHi
~"'.,".,..~.,.
~....-::~~~ ~
BUILDING CO,
..._ ","',' ..".it<?.."",
v
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield. Oregon 97477
""'"
Request for Information 074
Detailed, RFls Grouped by RFI Number
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
-'~~'~..~"-"~..- -,~
~~:ddo~d1~~.1",,,,~,..J..II__Jt.IIIU~'--IF.I~~JJ14.0IOff.
Answer Company
KPFF Consulting Engineers
111 SW. Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Answered By
Nick Saari
Co-Respondent
Subject
Steel questions
Cc: Company Name
Author Company
Crater Iron, Inc,
419 N. Front St.
P.O. Box 3666
Central Point, Oregon 97502
Author RFI Number
Discipline Category
Contact Name Copies Notes
Question
The attached review questions were sent directly to KPFF for a response.
Suggestion
Answer
See attached drawings as noted by KPFF.
Prolog Manager
Printed on: 8/13/2007 JL T _Projects
Authored By
Conrad Morse
Date Required: 7/30/2007
Date Answered: 7/26/2007
Page 1
Page 1 of 1
Jim Thomas-Building Division
From: Nick Saari [Nick.Saari@kpff,com]
Sent: Thursday, July 26, 20074:56 PM
To: conrad@rvstc,com
Cc: Jim Thomas-Building Division; Bob McDonald; Mark Danielson (mark@archbbl.com)
Subject: Lane County AFRC, Structural Steel
Attachments: Crater Iron RFI 7-23-07,pdf
Conrad,
Please find attached my response to your questions. I will send the response to the other questions as
soon as I can,
Nick Saari, P,E" S,E,
KPFF Consulting Engineers
111 SW 5th Ave" Suite 2500
Portland, OR 97204
(503) 227-3251
7/26/2007
Jul 23 07 06:24p
Crater Iron Inc.
541-664-2061
p. 1
\\\
L..........-J
CRA~I'.ER IRON, INC.
419 N. FRONT ~u..EET ... CENTRAL POINT, OREGON 97502
P.O. BOX 3666 PHONE (541) 779-3383 FAX (541) 664-2061
s...P~- ~'Z/ - '"3>"GS I
Company: ~ pp p::
Attention: t'--../(C~ SAAf<f. ~6.
...
~A 1< i--4ES D re f< Q:i-'5 r-<. -S:Sl:riZ-lJS
1-s.o~ -"Z"i;7-7crSo
To:
RE:
Facsimile Transmittal Sheet
e
Page 1 of 7
Date: 7/ "Z 2 /07
o (...~.. '2..0 'P~r .
c~ I ~ __ 0 vrz:;;;J:f "'2b"Z 1
~~
_,// ~p~ r
,/' ,b,.p... ?.. ~ "
r ~ ~ I'
.J (JL.. ~ \) ,.,1
I ~--,
\...~___ J"'-''''''''/
Remarks: 'PL'E3-ASt:: f2.T5VI'GW -n-iE A, .fA,GWED 0-
~L~"?ll -P~~L. COPtC-.:,. trF= t;)tG-SfG7t-l OIZAWIJ~S
, ~ ts= Q..lJ ~;.-{l ,w; G;, 'i/ ~ , r:::: l CA--r t 0-...1 4- A t? P" f2-D \J 4 ~
e--F= ~ Pt;;=-C-l r= l c::;,. D~~, '- s I:.. L ~- C A>rt c;-,..,l So ....
Fax #:
From:
17 L lE:?;A, c:;. 5"
Co f-J tz.Ac C'
~o reSET
~\L- You ~(Ye,CA2- Cf)-e...l.SJD5~A-t-'~'"
~
------
j:::-A~ ??4G\L 1 ASAP..
, I
cc.... ~......ill...bl 'SoH c/cJ~s ""'nL .--1.45 (Sifl --r~fo-77/'=')
7/G.?:/07 C> ~""ZS ~'-"I
---
~
_ ALL.- ok cue?y p.fotl//?t:
s / t3 f-t S?1Fr. ,4 { XJ {3T7f "'C-
. ,
5/>- 601 rDte c.utl~4o rwn)r:,~e:>
'- ~~~
{ co~('cJ. Q... r Vs-tc: 0 c.ofY"\ I
,,' J~~ .23 ~7 06:.24p
s
0) ~
.- II)
~....
It) ....:
", 0
--0
~ "
~ ,....
?~G 3N 10.5K
'T ic= 7,O-K" '. i
s
(I) :x:
..- ,It)
....... '....
o '
It) .-
", u
- u
~~
N
N
-~
~
OPP.
'S
O)~
-10
g~
", II
-0
~~
N
N
J
32G 5N 10.5,(
T/Ct7.OK
Crater Iron
" . -
II
II
..-_. - - II
"
II
I r
II
"
II
"
Ino,
t-J~
t
54~-664-20St
~
~
TYP.
~
,
P"-A1Z'I' AL
~-IC 4--B
r II
II
II
II
II
II
::.~
II~
r --LJ... .
1("- (0
(~_~~_" . '__'_'hn
" o'jt
100
II .a,
" J-
" :5
" ~
:: v ~ ---/ -\~
Ii (7) ~;; ~. f~ t:::Gl~;
'III, '--0 ~I -ro j?jl2.O . c;o ...,11-1. · r
II ,f':7 I ..6~C~ ~'. ./~5'J'/
II I ~~o- 1_ <=:t>L. ~ '-'~
1 II @ vJ' rz~ ~.lP ...,....-
:; Wl2xlSo.-~/~-----~?iJ
D.
~
1"
L-~-
TYP.
~-
Jul 23 07 06:24p
~.6x6~
.G STRUt
I
.
32G4N' 18.0K
"
"I
'fit
I
Go
~
.4\
0-..
- ,
. ..
"'. .
. -...:"
, ,
. .., . ~ ~I
-
o
Q)
.....
ci'
~
......
~
o
N
Crater-Iron Inc.
II
, 'II
II
- II
~5JYP.::
s-IIl "
II
II
II
.11
II
II
II
II
II
\I
I :! I
~..~~J
!~f" .~ I
ON '
.oj ' II II
"'0 \I -
-, II O~
:1 I- II ~ ~ ./-.."'----.....,_lYP.~, -..r ~
~ II 0.....' J,
II ~ ~ J /,....~ ~ ~ ~ "'",",?~ CJ..JA-tr.l6t::"P
r;.: ~ II -.......: NCII'"' " ? f2Jt;tJ I ~ .
6 :: " .... 10 II -n: ~ CD>S.;.
:: ~-1">- ~~~42' Cot:. ~.",J'
::'--7/-,~..'
>b II / '-"'\~ /~__.~
,,,'is jl: / 9 '--€V
,/ 22...c; 3N 10,5k- ,en ,~. 32G 4N, 1 O~
W12x 6,. ~~ : ',I ..,. ' T/ 7.0
~ .rT/C-7.0K ....
0..
..~ ~
541-664-2061
'-
o~
0)',10
....."
-.......' .
g. -
I C. 0
'.......
:!lI:1-
~
24G 3N 10.5K
TIC: ,7.0K
1'1
j"
I
'"'
:c
~g
--
/:
'N /
"1 ~ J:~:"W12"<1
- CO or ,
. ;%. '.. . C6x8.2
A~~:.'> Ii ~:
1t!Y ~ -'-' ~ I
g:~ lj ~'~ 0:,
...' 9 '1,",'
~ S,lI , ih\
~- ~' :!'~
~. ID .3:
o
eN
,...,
o~
aJlO
,''''':
o'~
It) , 0
""'0
-~
~
'"'
t'4.
,r',r .r,r ~
W12Jc16 '~'7T .
(:1
: ;0 F Sf'
~
32G 5N 10.5K I I
T/C=-7.0K ,
I Pk1Z>tlAL
5- r ~:>1-'- B
p.3
?J
.
32G 4N 10.51
T/C="7.0K
J
32G 4N 1
, T/C= 7
\
~
Jul 23 07 06:24p
____ TOP OF HSS
",- COLUMN WHERE
OCCURS. PROVIDE
14" ,CAP Pl, wi
SE"AL WELD ALL
AROUND
-4"
:~" AT SHORT
il.ull~ HOLES)
1
, .
~_,i
WF &AM
REF. PU\N lYP,
i"
~8'\, IlYP
9'16 / \ '
)ESIGNATED [R]
~
-\
\rl
~6V
(TYP.
II~I""\
Crater Iron Inc.
541-664-2061 p.4
~'J2" AT STO, HOLES W
1~" 'AT HORIZ. ~vJ~?
COPE FlANGE -~.. SHORT SWII t.IJ ."I-? ,~IIA.
AS REQUIRED ( HOLES -'''/~-r
~ ~WFB~S
o.~~ ' C\ 1" REF. PLAN'
b:E \_ .... I ~I
l~ .~ ~:/-'-lr~ -*(~
a.. ..., ,'. '
d \.-/ J;',-,' ~ ~'
JA" PL wi ~a.
A325 SC BOLTS
TYP.
~6)
~6
);?i4.
\
\
~
\
\
I
\.
.w:u:Eo.
REF, BEAM TO B
DETAIL ABOVE FO
INFORMATION NOT
SHOWN,
TO BEAM - DESIGNATED ~ 5~r
REF. SCHEDULE 10/S--:-6~WFI~l+
) /' I REF, PU\N .
tit: f "'ul"r .,' \ (CL ~EAM
trI. :1 ~ V _ '
il ............ /"'-- .
:L. " . ---- %" sTtFFENER PL
........'
"' -.
-r- ~ ~6.) ((3)
~6 SIDES
\
"
.,
\..,,_ FULL DEPTH SHEAR PL - 'DESIGNATED I XS I
"" REF. SCHEDULE, 10/S":601 ,.. , $J..Mr',,/~
" WI? ,(,,7
"", ~ ~F h
;:~~ M~~- .....~;~~ ~;(~
INFORMATION NOT ............... ............... f~-
SHOWN. -"::>'l " ----I~" snFFENER p~
/Llb- ~i .
~6V
(3) \
SIDES /
~6\
~1e /
FULL DEPTH WELDED
SHEAR PL - DESIGNATED I XW I
t::? 6" F" . @:;;-":0
~~ICAL BOLTED BEAM TO BEAM i ~
Cl OF' BEAM - ~
~ ~ y.) AND COLUMN) tl \j
18 MI y,4 , ' ~ \'I .
~~ 4 ':'=::).
-,~"~~~~:riE) .~
=-+1. '.
'op. ~- . "'\ r... ~ IlYP.
',W;, Y4- V \
PLAN A-A '
. ....
, ~ ".048, ~ .
"Z '~,:l ;1~" . I ::!
"; of..;;, jI.---WF COLUMN ~ 0
/ ' REFw PlAN TYP. 'It ~
1- : . .-1 ( v.J~"';!!.t.... . ~ Lie
- I ' tJ\ '- ;.
1'\ c:o<
III a:
",~
\
J I, j'Y_:;*8 .. WF BEAM
\ REF", PLAN TYP.
REF. 4/5-601 FOR --~.. - "-ebJk.trEF~D .
WELDS. PL AND BO ~'-Z)<.40"2 tl/~ - "b~ * IJ- ~ ' SCHEDULE BELOW
HOLE DIMENSIONS ""'( 1L..'f', $0) - . .. ~ ~ RAllO "t8 PL
~/S-b~ "'1-Zl<S8~ Ill+: -Z"o/+ < 3 ~.
~ ? W/'2)c:'1'~~H/$=- "Z_'Z. ,f; ~ 3_~_L*. J
BEAM TO COLUMN - DESfGNJ\r I X ~
. REF. SCHEDULE 10/5-601 ,,1"F1'/2D'f',(
TOP OF COLUMN I.- If:'- ~ S. 'Z>
WHERE OCCURS TOP OF COL, Ti P.
WHERE OCCURS '
--k-
p~\J I vJE
~(31\ ~
A'l W /l );. 40
t t;V /1. 't5CJ -
"-... ---
,Jul 23 07 06:25p
541-664-2061
p.s
Cr-ater- Ir-on Inc.
lsl
o
HOLD PL AWAY. . . J'" -
FROM WEB '''''" -' ~
'-'~ 1'2 )C. 40 ' i.. II
\d l-z. ')(:. SO .
'yc..{ I-z..";c. St;5 , 4- ,. ,
W I ..z ~ ~ c.e, ,f:p
C(!f:)L. $...
TOP OF COLUMN
WHERE OCCURS
---
.'\
,
r
')
).
- - - +-'- '"7b
,I - .'.r.-,
I
, j<i'
" _ _ I' _ _, ,
, n,,~ .,
" ;1+"
Jul 23 07 06:25p
ti}~;i~.. :": .
wi/
. ......:,:(...:. .
;'~;?'i' PL ~9xH wI -
:t:t:-, (Q) *..X~. HE"AOED
:~/',<. STUDS IN (2) ROWS
;f!~,e:" ,: 0 '6" 0.0. HORIZONTAL
~"'~0Tffl; .
~
"
<
!
--
-I.
J;:,,: '
~.... .
if~,'::';
"..:.
'~:.i~;.,.": .
Crater Iron Inc.
\''.. ~___..t'
II .
~~
541-664-2061 p.6
WHERE OCCURS
-
to
----
'.~ ') SECTION A-A
//r'. ~4. A'.j#~(I) ,
.J /A>- V; ~(i\ , ~
/"1v17'f~' ~ f I
! r-... 1/ ; vV. / ~ rz.
\ \"- () ~ p.. ',./ .r' . ,
\ C/ \t' /--_// )/ d4 I rz.,
'-\ /' .' l~~
\~ ~ 1"
~P~- I I
- t'
CONCRETE -3t. I
WHERE ~~ ""; lV4
OCCURS ~ ....
, \,
, "~=e=~
f? 1.. ~SI..87'
~ ')(' 1 'Z- .L I(
I (~ I~ M"Q)l!
I "--::'
~"Z- \ X :
L ~"~ ~f() ;
wi ER~~ION A~
SPLTS IN
(SLOt I toL> HOLES - ~
A:;j REQUIRED
2 1/2"
I RETURN
\ TOP AND
BOTTOM i
,
:
. ...
~-,
.... ~
f n --: il/4"l-4~
I n- -- -_ ~ :I'I~ /
\ · i / J
- I -
n I
~,//~\ ;
-~
-
...
~ .....
~
G It...
Z. ~
U u '...
~d
cn~'AI
~O
w
>
IA
\
...
~
'-WF BEAM
REF, PLAN
,E
C
P
'E
~s>
~6
/
\ TYP.
,f:;):- REF. 15/S-601 FOR
:/' :: ;..:-EMBEOS AT PANEl JOINT.
>~~;'REf'.11/S-601 FOR r,
:;~t;~;- _ SCHEDULE.
;~;~}:-\':"- , ,"
~.~. ~~~ ....- . .
:{l,~i~;is::h":'TYPICAL SINGL"E SHEAR PLATE
:~r:,~ON'NEGTION AT CONCRETE WALL
::J1\~t2.'"l;-O' ( t"'A-rz. T I A~ ~crl' ~ -,'=0./)
'.' .r.....:_.
-\WimmSH"
~
- BUILDiNG ca. -
~I..J.L~I."""
Request for Information 086
- - ~
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
ImoiltiMtt:{. 1 J ~ t' "
Answer Company
KPFF Consulting Engineers
111 S.W, Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Co-Respondent
.....
- - - ~'-,. ..,.- ... ,- .-....-_._..._'-'lmr.l.ifl:Tftr:tilili:f.I;f..~lh,.
AuthorCompany Authored By
Farwest Steel Corporation Kevin O'Brien
90340 Hwy 99 North
Eugene, Oregon 97402
Author RFI Number
Answered By
Nick Saari
Subject
Rebar at tilt-wall panel edges
Cc: Company Name
Discipline Category
Contact Name Copies Notes
Question Date Required: 8/23/2007
At the outside edge of the tilt-up wall panels, is 1 1/2' clearance from the end of the rebar to the edge of the panel
acceptable?
Is the intent to have the edge trim bars to be continuous around the outside corners?
Suggestion
Answer
1 1/2" clear at panel edges is acceptable.
Corner bars are NOT required for the panel edges.
Date Answered: 8/21/2007
Prolog Manager
Printed on: 8/21/2007 JL T _Projects
Page 1
~
Request for Information 086
-
......... ,~ ..."..,.,.... -,."-_-.'.......;.--~"
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex"l Project # 5258
3110 Pierce Parkway Tel: (541)736--5843 Fax: (541)736-7716
Springfield, Oregon 97477
RFI # Ofit3 " ,:'.... - ., .. , :' ,-. - - , -- ,- :-r.L;te:GrC:zif~(1 'ti~f6j2Q6r
riI'.1IJj11 r"'~lU."i-~~'N """".'''M11 jl"f ._~.rl'I' l~t,.~
J . I, '., ..,.... " ,.~>,!~~:t,."l: I lL , ..." ',. Jl J" ,'.,.-
KPFF Consulting Engineers Nick Saari Farwest Steel Corporation Kevin O'Brien
. 111 S.W. Fifth Avenue, Suite 2500 90340 Hwy 99 North
Portland, Oregon 97204-3628 Eugene, Oregon 97402
, ct.'.:" :' ...... I.~ ~:l I i<ti.~ ~ b --f.; t
.1~~'jl1~_~~J
", ~ "7.::'r~,: ';i;~~..,~;'\\~':A.~ =l:.i...-:
_~~Wi
t[;;.~t~"~l ~~~,J::~~~t~," ~. :r~ti:{~,.(~:~(~ ~. ". .' ~:~ :';O\~i~!\~:".~t~/..~~~~I::':-;~-" -,,",,~;q(P. .'" ,:,"v",~~,,, ,-f;);';~;" ~~~':,/~-~~;:tr.~;~';'tYI! L:['{I.,n
~~~
Rebar at t11t-wa1l panel edges
__..lII~lll_~ll~JlI.mlW 1I1!1l__11rllDt~~%
~1t\i~ll1lt_~i{.--'-~:>>~
At the outside edge of the tilt-up wall panels, is 1 112' clearance from the end of the rebar to tha edge of the panel
acceptable?
Is the Intent to have the edge trim bars to be continuous around the outside corners?
r.~~'>r~~Vf,t~~itt:1$,1f-~t1ii~1.\Wt.llW)liil!!'j~~:'. '," ~" <~,,' ' ,"-'r:'
'. , ~ . .. ~~""~~ ~1).!.... . ...~ ,~". . ~.. .... ~.~~~:i;tiJ,~~<<~~~~~)fK~ _ lh ~ ...' ,..<;'" . . W:i_~. ,.<t :\ . ;.' .l~ .'~.)O.
.~;t :1(.7~~*,W~~tf,~~)
':>~:~ ," ~ ~...~: ,-: '(~ 'J; .-.: ~:; ~ ~"-li~",l' J~
, "-
.",' __' . ",.",', ,., ,. ' ".0, "". ..,:., ,. " ll!II!IIlJL..l
. 1\(1.\\ C LE At<... AT PANEL e oCr:S
[S AC-L C-V'Tf\G L G .
cP C 0 1Z. IV l:::: f<.. 8 A {li Arzs ,ru 'D--r-
~ E d V I v2... C:f:J rU/( 1 t-t r=:-. va ,A file L E. ~ G cS- .
N/t,t( r-4A,f/
!rPPr
&P.1/07
Prolog M.ii ~ll.JI':l
Printed on: 8/1612007 JL T _Projects
Page 1
Page 1 of 1
Jim Thomas-Building Division
From: Tony Dean
Sent: Thursday, August 16, 20073:16 PM
To: Jim thomas-Building Division
Subject: FW:
From: Kevin O'Brien [mallto:Kevin.O'Brlen@farweststeel.com]
Sent: Thursday, August 16, 20072:57 PM
To: Tony Dean
Subject:
Another two questions:
Can you ask the engineer If I should assume 1 112" clearance from edge of panel to end of bar (not to be
confused wfth detail 11/S-502)?
Also, does he want the edge trim to have comer bars making the trim continuous?
8/16/2007
~WimDISHi
It-{~qp,j~~f:~~
~~-::~.-~~
BUILDING CO,
-' II .II Ill. .J~:" .'" 1_. ,!.Sb
'-
Request for Information 087
'-"""._..~.-,,-,_.,.~-_...,_.... '.~"~ _.~ ~~.'" ~ "
<
i
.-- ....'J
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
I:Hlft:.ol:lr.llIJ.A~~~UI.,...",...l.lI"JL...-,... .'.' -",~, .~~, ","." .""""",
Answer Company Answered By Author Company
KPFF Consulting Engineers Nick Saari Crater Iron, Inc,
111 S, W. Fifth Avenue, Suite 2500 419 N. Front St.
Portland, Oregon 97204-3628 P,O. Box 3666
Central Point, Oregon
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
'0' u'..hlr:l.ert:3H,dl:W:J.F.lf.liliul
Authored By
Conrad Morse
97502
Co-Respondent
Author RFI Number
Subject
Connection of panel joints
Discipline Category
Cc: Company Name
Contact Name Copies Notes
Question Date Required: 8/23/2007
Please confirm the attached sketch of SK-SP1, splice plate sizes for 2c; 3c; 5c connections @ panel joints per design
detail 15/S601,
Suggestion
Answer
Confirmed
Date Answered: 8/20/2007
Prolog Manager
Printed on: 8/20/2007 JL T _Projects
Page 1
~
Request for Information 087
-===1.IUiJlII....IIliI'lIi1l1.l~ li.,IIIIIIliiil.......liIliU,~IIli.;. ......1 ....IIIIlW.II. I
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-ll Project fI. 5258
3110 Pierce Parkway Tel: (541)736-5843 Fax: (541)736-7716
SprinRfietd, OreQon 97477
RFI;J 01::7 , ..... _.. .__ ' _'.,. O:lle Cre:lled 3j16/2jl9.I
-:;.:- :1::.',' '.,;. .~. h'tf"}i.:"'~ ;~':'~J;\~~~~~~'\:#':-:-.'
KPFF Consulting Engineers
111 S, W. Fifth Avenue, Suite 2500
Portland, Oregon 972CJ4..3628
,.j'....~I~~I_'~.mMI,ojhL~' "
Nick Saari Crater Iron, Inc.
419 N. Front St
P.O. Box 3666
Central Point, Oregon 97502
"k
. . - .'. ." ~,;:'
Conrad Morse
,"~:' ':')'" _ . ~~;:/,~:,I,.;:1$?J;~[';; !~ ~'i.t<t~~':;~1:~;:::~ :J':;f;.;~~T.s1~it~.(f~"f ;.\:.(t;;~l~~},,~
'. '"' .' ." f. ,,, ~. .
.- $l. ',~ .~~f
,~...;)jj\111J""i"I.iWli.\l;ji>.~:lf,t,i;';;J!!"'N"'J;"';B;~.;ti"''f~'''''<l;~.IltiM\>l'.1il~!'.l~!~':\\i\\lI~~Ii'"t'''I''''''''''''4'''''''.l!~mill\il~);l~~\i!'''\rl~>J,'',"'
\lI1IlM_f;lli~~",~~J:~t~#V)l~'l<'i~~~~\kfm~$'~~~~",",~'j.&4!Y!}llljm!{,.~_il~~t,~~j';~~\Wi$r.t
Connection, of panel joints
.' "'" "',,,~ '. ' '.""'il,<;\_'-' ..'I_.~'""~"l;_:' "'~."';'."," ,,','" "'~',;;,'r"""",Jo,','""''','
,'.,., '" ''''','-,1'' )_,;~,,,-.~,!~,','.,!f,".'f,;.. ,'.,.', '..', ",."..' :" "',' "'- 1!(EW.....;<<."'/I""" ,"
,.., ..... ..~~ . .,.. -' .,"(~i, '....~ '~'. . ,-.'" ,:... ,~~. ~. ..~~:,. ~.. ~"~''''' .. ...~.,:.~~.::,:.~l~.,~.;~~:.
.i~i&~(~.
Please confirm the attached sketch of SK-8P1. splice plate sizes for 2C; 3c; 5c connections @ panel joints per design
detail 15/S601.
.m~.\t;I'~%'Mfi.~t'~'~..\IMi!>li,~~'~~""'iU~~ililt~'i@'f~i!.''''~lii~Sili~'i''Iii'~~~~\~'';'l;;'lJ''~_iW''':
. ". '"'' -., .' .~~wt:~;~::k,,;.}lh~~~;.~~~~~q~~w~~~t~J;{~~~~:'...~~t~~!i~~,;~:!~'il.1f~~~~\:I:I~~'~~..m.~~~.IJn~~." .,,~.~1,.~:;r:
.~~~'-'~,"'"
-.. r:Jt:~. , . '. '". .,. '.. .
.~.rr." .....
;. "'1'., .
. ~' . I .....
~x
,.'.'
CoN f (~vVtEC:J.
fV0k S 1111121
Krrrc
f3/?u/67
PrDIog Manager
Pnnted on: 811 SI2OO7 JL T _projects
Page 1
~~~'""'=~=~.-....~
Rug 16 07 06:16p
To:
Company:
Attention:
RE:
Fax #:
From:
Cl"'ater Iron Inc.
541-664-2061
p.3
CRATER IRON, INC..
419 N. FRONT .;p. rA.!!ET .. CENTRAL DBODNT, OREGON 97502
P.O. BOX 3866 PHONE (541) 779-3383 FAX (541) 664-2061
Facsimile Transmittal Sheet
e
~ Pt:: f=
i-llCK- ~ 'IJ<-re I, y, 5 ..
A F 12.. c -1.L ~ ' 0 '~)Z. "* 'Zb 7..1
r' .
Page 1 of '2..
Date: tJ!J b h, "7
O~~/O PP/
~ ~ "J. ,...~ _ -, Q tiIO.."..."
..__v 1; -."- -' ~. f I c:;;t '-"
1;
, ~IA ~,i~
! <ive iJ-'V
~ ,.~
'\ /
'- -----
~f ., A Cd..,lGb
J.L ~J~e;:..S
C-o '/-.J ("e,A7.:;)
~'1~e7S-
Remarks: PLC--AS6 Ct:n-Vrtrzt---J -rJ.+6
~ -c;;:.. i <.-lo+! S IL. - ~ PI. ' c;. pt.. I c15
/
J=="".;, ,Z I"Z G \ ~l~ elk I s G. \ CO'I-J 1-1 G: e,f D"l4-I S'
@ P~r;:.~ ..~ 2' J,'i-CT~" ., "'P:e7Z. bE5~/67 H
D~i At<.- IS /s-~o(.
PL~..~ FA ~ -r7A-C~ AS-A.? I -z;;'oA Y...
. I~~ YD"
~~
c c.: \./vIII.... D t 7 H-
e 1-0 J 11-"7 . J r1r:> ,....,.., AS."... ;:: A ~ s4-1 - 7"?;.~ _ ; II (p
Ob~.ISppr
@
CONCRETE -
TILT-UP
WAll PANEL
REF. 11
(3) ~.(6 WELDED _
STUD BOLTS
~. Pl__
1~.
~o/
II
~
.... '-}
, -0
PANEL
JOINT
(CONCRETE
TILT-UP
WALL PANEL
~
~ - eJ re:=!
~
- -
~ (3) 16". WELDED
STUD BOLTS IN
19{e"x2Jf' HORZ.
SLC, I I t.1J HOLE.
CENTERED STUDS
IN SLOT
REF. SCHEDULE
FOR CONNECTION.
~..
u::;-
'" '"
c::>
,
"
.
o c:::> 9
..
....
o c:::>
-~,
,
,.
" -6"
,
BEAM WEB
j
W= B=AM TO PA\lE_ AT JOINT
1"=11-0"
c
Rug 16 07 OS:1Sp Crater Iron Inc.
tii~
R ;~< ,,~ ;~'/~?Z1 OIMOl
-...N ' j ~f ~8'~: ~fl-::>'l..l7']l\~z,r}VI CI
~ -" ~
X . -z.,. a.t.; " '~ll ?SJ ~1fY\ ~
J\'~ . .. 1 I" p a. l' I I ,1'1 ()#\01;<f;' ~ .
~ . E' ~.~. E't~t.~t~~
: ~:".. . '[ .r:~_m..l ..... '~ ~ f-
:,-~~~ 0, ," ~____..._ ~!
u .. . Q
, no- M
v .~
'" \ '-.~. i....d
,"I -f ~ , u
i _t
(~~
\ I~
\ \D \.t. \
( ~ ~ ~, (
\ V' W ~ \
\ -', \
) r V\ ,.t \
I ~\J\./
ltl rJ
\ it '1 \\) :
!.i ~ ~ \
I \)~: \
i . \J
\ \JJ~ t\
: IJ.\ ~ .~
/ ~[ ....
( lb. ~ 0 )
\ ~ V "--1~
'''y
,
,
'-'-...... ....
~
<.J -.
- /\
, )I.. __ ':t
't'3 \J ~
~.i-
~ ~
~QJ~
~
541-884-2081
-..
.()
~
. . ..
...
'"
1"
,
,',
, 01 M C>
,
," +'/YI~"t1 M ~
" '
, C/')} JV\ €>
/
,"I ' ~Jm cv
c7J
b
0':'- ~
. ,
~J'
.
~.
."> \
I
" .
;'
i
)~
--
~ ~:
I '-
(;" <i\
~-J
J
,.:. lb
~ l
ill ~
~
p.4
0-
ifJ r-
,~
~~
fj15S)
"'"
{P./.f:D
?;/t7(1fl
A{feuf;ffVI .' Con/-;4 0
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oreqon 97477
~:,,::u.r:""':lC~.
~
-
Request for Information 093
_...lI
Detailed. RFls Grouped by RFI Number
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
.. ). ....'" "... ;..:, ~.~.~!:....'_:.;:~",;:~':;" _A :'~r- A";.... ':~\.i;",.;~.:' e.._..;;........;...... ....' ,.....":';:.....:..:;".......:...~. ......:l..A....~.-...,..::..-:t:'
Answer Company
KPFF Consulting Engineers
111 S, W. Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Answered By
Andi Camp
Co-Respondent
Author Company
Crater Iron, Inc.
419 N. Front St.
P.O. Box 3666
Central Point, Oregon 97502
Author RFI Number
Subject Discipline Category
Connections @ center Penthouse Roof
Cc: Company Name Contact Name Copies Notes
. ....ir.Il:lll........,...IIIllot:fY4met.)-lI
Authored By
Conrad Morse
Question Date Required: 9/3/2007
Please review the attached SK-48 that is the Contractor's interpretation of the design connection of the center penthouse
column to roof structure members (Reference drawings S1048 and details 12 and 13 S605),
Sketches SK-48a is the suggested detail for two locations noted.
Suggestion
Answer
Provide connection top and bottom as shown clouded on SK-48a.
Prolog Manager
Printed on: 8/27/2007 JL T _Projects
Date Answered: 8/27/2007
Page 1
~
Request for Information 093
Detailed, RFls Grouped by RFI Number
5258 Anned F~, ........ Reserve Center Complex-II
3110 Pierce Parkway
SprtnQfield, Ore!:lon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
8F.1#:~093 ',.. ,:f~'- ,,: '...:. -~'"~'''~''r''' n.:.. ' .,. ~ :. .~ ".; - ; ~ ~':~-"""'-~,:,'Q?t~'Gi@ill~d:-"8!nJ20DT.
A.,:..f;,~;dric-o.iPiiUij'Y>,::,. ,.,.'..<.~},
KPFF Consulting Engineers Nick Saari
111 S.W. Fifth Avenue, Suite 2500
Portland. Oregon 97204-3628
~~,>~:,~:.:~...;.;.:.:-.~.
'..';:-'-:'~'~{_."':
Conrad Morse
;~t
Crater Iron, Ioc.
419 N. Front Sl
P.0.8ox3666
Central Point, Oregon
~:RF1th.~~b,.;r
97502
,SUJ>>JHt ' ' 'DI$CIPIfIJe '., ~
Connections @ center Penthouse Roof
Cc: C,"'i,;"~.",,nyNaina C,':~~c...",;Uqill1. . . Co;p_ ::NO,ijes.
Queelcm ' .' ,-- , ' . : ': Dflte:R~: tl$l;2OG7
Please review the attached SK-48 that is the Contractor's interpretation of the design connection of the center penthouse
column to roof structure members (Reference drawings S1048 and details 12 and 13 S605).
Sketches SK-48a is the suggested deta~ for two locations noted.
SU..,doJo"".JOri
Answer,
oatG.~:
V~O-J \ bE..
c.t..ou \) eJ.:>
CoeJ t-I ~"'("~....J ~ T'C;:. -+-- t:>arr C)M.
A.'). S I \ _.eJ r-1
t)kJ
S K - Lt8q", .
&0: ~ /~Ff/8-Z't-01-
ProlOg Manager
Printed on: 812712007 JLT_Projects
Page 1
Rug 24 07 OB:28p
To:
Company:
Attention:
RE:
Fax #:
From:
Cr-ater Iron Inc.
541-664-2061
p.l
([J
CRATER IRON, INC.
419 N. /FRONT STREET .. CENTRAL POINT, OREGON 97502'
PaO. BOX 3666 PHONE (541) 779--3383 FAX (541) 664-2061
facsimile Transmittal Sheet
e
KP~r
tJ-llG~ 7.!\'A 121 ~ -p, l5.
A t=: t:Z C -lL Cv c.HZ;if?b "Z{ ")
~"'3>- -Z~7-7~'Z>Z>
Page 1 of 3
Date: ~/~/07
.!J 81, --ze:, PPT .
Cf)1-l.~ ~e-f2.,S6"
Remarks: PL~1Ef f2,/5VU;;;W ~ c::J~-~. ~J4.-'c.4 IS
,
(;J Vl'2- I 'i-fi r= ~ ~ '=" , 4---"'" () 'I-l Q r= De:;. -==- ( c=v t-A Co 0: I-J t--I ..
PL~,S6 7~ ~,1L-1"e..CL) '?cJ~Gtri::=;~"7t5D ~~ I'-.a.
~ ~G "2- Le f""."\.=rlo-J$.. PL.~S=
f2.. EfV t~W f A 17 P I2D \/l5-
PL~7tf5 ~k ~/A-c.~, A.c,A-p Ie;- I--'~y'...
,
Cc'~ WIt..bL"Sr1-+ ~/D -l1J-? '-t'1;{~ r ."'7A S
S~I-7'?6-77/(p s/'Z4 oe:"2SPdI
) )fOl
) >fOG'
) )laC:
~
",I
... .
>e-
N,
or- i
~f
} )lOC:
) )tOZ;
J )fOZ
fD
>e
~
3;
) >I0Z
I >IOZ
J )fOZ
1tI
...
~vllt\
\ f~!\
~6 "V
c.
..."
n
z(.)
Itl;:::'
Ir.r~,
oq
- "
z ·
..,~
(!II-
N
l')
.V-,S
N
C'I
..
.....
i
.
o
I
'ixl
l')
3d01S
('0/
N
x
.....
~
>ISL'l=o/l
(06l/OSf) >I~
I
[i~"
I :
I :
I :
I
I :
;, i ~
,;,
~ ~
z
::s
a..
<..?
z
-
::E
~
u..
LL
O~
0"
tt:!
(0
~
-S-
o
(/)
_. {-U~s IE>}< h<.~ '( ~ 9'~
'?l..-o p't; (1Z (-"7; ': 1'2-
r---- ___f
1 J
! I
11): }'\.
..... I
""0'/'-1== = = = '1 - - . - -j
-IN r 1_
\D ,r- . -; I
'\ " I I
;L . ....~ I WS~';.rboIJ~,
, -}- CoL. AJf6
I .1. I Vt.JPe:~
~:;'SI~)<.'MC"+ -""i 1
fq~ 'l;--n':
ir--l.
...,. - ':"'!r-
--.,
12>,7 "
;f , 'I
: I_,__r ,,'. ~ -, -.. ~
1,...__, : CDl..,e,+~ . pr;;"'3>l&.i-1. D~t,<- . \
': '. ~ Vt-lPt:i::----( '7-.Q.y~.... tzE?F'. 7/$~6:>ol j
::"tJ: -- '7 ~Cen.J~. f
l"~' -./
1-- - .::._..:..J_ - - - -t ~ __ ,-~..........--~
. 1 t
I ~. ~\ '?1E1!3 ? (-'. - ti>a.-
~ - - - - _ J . ~ 7-V-6IGJS:-"c::-{:)
" ' \'l>-ESSIC:::>}<;.'h.:l,: ,;.N.'1'2. ~II-t6C-r7"f7V.l W{..flDlt
I ":>L.. pe;:. Eo ~ ~ I ~ )
';& ,? "51 ~.. 'T'D '~/5~C)S.
Aug 24 07 OB:28p
@
Cl
_I
-
o
_I
"
tl'
'4.,g
@ ~,
-rrl.l
lI)J
~J
Crater Iron Inc.
541-664-2061
p.2
(j)
'.
JIJ
@
~ 7 1t_ l
fol$";:.lo)<4-l'.1f4..7 J' ~ .,
1='q"2 ....~e-F. S ~ j.JQZ
~r- - ==--";1--- {~6F't"2-
I I' - --_ I
,L _ ___ _It - - - J-'~
.
47~t::'~~1
e lC>4-8 I
(wr:!ifSo-rPJJt:E; ,
,
I
--
4-7Cl..1 r..J.';: (SIJ,-="'-f 1=Aq5;
€ A+<O
.'
.
,I i
I I
I I
c~L~A4€>~~: ,:1
Col. ~4S. I
I
I I-
I ,
I I
i ~
I
II
W, L D t c.;:..~
~ Ft<C. - rr:
fi:J( '2.4-1-0 7 ~tL - ~
Au~ 24 07 08:28p
Crater Iron Inc.
541-664-2061
p.3
&
o
_I
,~
...J I
-if. _ tJ-';.--:'lor--4-~L ~ ")
')(,1 A.J.----il- ./ 'Per 1-' /, ./AL7l/ v~ I
",&" --r--"~_ ~.-z - (K1L,~;'._ ~ (/1
JJ\ ~ ;7 J"' 7 (... { \'\' '-r y ,-
~ ',',P-=:/; .P \"~~/"f'~- J
~ ".,. ~ .z / ' V
.... - -., 'I It .Y
-l~\: I"p .(-r'f-
I ; t - \ 7/C>,4-~!:"'1
': I. . N Cf ~ cS e-':Z. .l; J ~ ~6z> ro
~ I ;~1-~~--\17----
~- ," tiJ.
1'1 -~
I. '1_
11'l:::- --=:;- .,. ..,-:----:-
.., .--'.- - .......
I I
I I
r--:; ~st(r~-!f. -d-,Ao..
\ cot.- - r.;'f"c;;;;>
I
13 I L-~
~J ~
A It
-....
@If\~' -
@
"1717 .
...
"
" b,
/ $01-
~t.." +"2-0 It:> ~
'..
If-
'1--'"
\S~~t;.;6~/,EfD
f-,'e::::rt 44 L .
--s
~Fr:zc.-lL
o (-vf /07
S~- #3et-
o
TOP OF HSS
EL REF. PlAN
2'-0.
VERIFY
r---_ /-
:' . {------,---t
l~___
: -----~
I ,
: HSS
I
I
,."Y:
r
..L -1
;'
::m:J:.L STUDS FRAME
lIGHT TO HSS
REF. 5-701
@
HSS AT SCREEN WALL
1 "= 1'-(J"
\ 1
TYP'I 1'- \ "
~6~ ~~ "-0" 'f
--r' ~-,
10---+--+---
--- L .. .J
---
\
lYP./ ~6V
'nc4x4 CAP PL
c:.A I tJ"lSION
AT STRUT
SECTION A-A
2'-0.
VERIfY
At fA
HSS
REF, PLAN
BEYOND
l- CAP PL
o
~-----
: ,-i:-":;-- =~i:::
I" c-'
I ~_____
, -- -""'-'.-
I
I
I
I
I
-,--,
ANGLE
REF, 7/S-60'
TYP,
@)
HSS CONN.
1";:: 1 '..()"
S~O~
-----
- CL BE'AM
tKm
REF.
FOR
INF'Of
PLX
WF E
REF,
;:)1~tJ
DEFU
REF.
'@-
METAl
REF.
PL X
WFB
REF.
'0-
WILDlS"
~
BUILDING CO.
Request for Information 092
.-'''~ - -.. .J
Detailed, RFls Grouped by RFI Number
5258 Armed Forces Reserve Center Complex-I!
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
, ,:., ..__ ,:_.: ..~__..:. ".'- . .....-.;. -_..-'-." ".,.., .... " "- q., ""'-".. ___ ,__,~ a e r.
r:r.":flo'.4Cflo'.{11I1A
Answer Company
KPFF Consulting Engineers
111 S.W, Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
Answered By
Nick Saari
Author Company
Crater Iron, Inc.
419 N. Front St.
P,O. Box 3666
Central Point, Oregon 97502
Author RFI Number
Authored By
Conrad Morse
Co-Respondent
Subject
Brace Splice 2/S-303
Discipline Category
Cc: Company Name
Contact Name Copies Notes
Question
Please clarify and approve HSS brace splice (21S-303) as shown on our sketch SK-B1.
Suggestion
Date Required: 8/30/2007
Answer Date Answered: 8/23/2007
Plate width and thickness are acceptable, Weld lengths required at each 6x6 brace are (4) x 19" long lines of 5/15"
effective throat flare bevel weld to each HSS brase (twice what is shown on sketch). (4) x 13" at each HSS 5x5.
Prolog Manager
Printed on: 8/23/2007 JL T _Projects
Page 1
~
Request for Information 092
III. .ILI~I_...'II.'...IW.ll....l..,:...JlIja:=.lLIIIIlII.LIII.I", Jill.' .111 I j,llllIlllliollllllll
Detailed, RFls Grouped by RFI Number
5258 Anned Forces Reserve Center Complex-ll Project # 5258
3110 Pierce Parkway Tel: (541)736-5843 Fax: (541)736-7716
Springfield. Oregon 97477
'RFI # 092 . . -, '" - . -. -- Date treatecf ai23!2007
A~r;e'_t1Y"";' '. .",., _~.":"'/~.,;:"~'.-'.'.'d
KPFF Consulting Engineers Nick Saari
111 S. W. Fifth Avenue, Suite 2500
Portland, Oregon 97204-3628
'l_x~ii6Y';':":;-" ."?;;.:,,,~,:,!,:~i~'A~1~::,',\i.'::
'Co-R.sp()i'ldem '
Crater Iron, Inc.
419 N. Front S1.
P.O. Box 3666
Central Point, Oregon 97502
AUthcJF~Ff'Ntiti1ber
Conrad Morse
Subj8Ct, '
Brace Splice 2/5-303
'Cc:Company N~me
".DlsclPllne '
,.~,:_.'
COhtaCtNama '
Copies NOteS. "
~tlon- : , ' ' , "
Please clarify and approve HSS brace splice (2/5-303) as shown on our sketch SK-B1.
Suggestion.
" '.~F!equlM:.''IJ3OJ2~
Answer
.' , Date'Answered:
P lATE kJltiTf.I J 1!1fCklle>j; p.. E
/lC C ["7/ Y/Q1{5 L5-".
L.>ELvO
LEtJG77-tS
!<. (3 Q J I ~ .c----;Cl
!Iv nCH
L / IJ LP) 0 F 5";/6 <( E Pre? rl (/E f7f..e cJ/lr
f?-A a e l3eve L WeL-l') 10 t?fI c U
/J/2Atc( TGutc..E UJHAT IS 3~r]L..OJ.-I t:>f'-J
S&cETC H) , {f)'X/5 tf Ar;
/Ult?C S;?!~/Z I
o ):)-6
B/C AcE
ARE
& A 19'( t...oN~
I-t s- J
crfJ clt
!Cpp.c
I/{' S ~.kS"
8/2J/o7
Prolog Manager
Printed on: 8/23/2007 Jl T _Projects
Page 1
.... _.<r>"'~-.._..,..,._.".
__"'~"..,_....~~~='.._. J'.!. _~.... "_"'_'_~~__
~~.1l:s.=~.
""~~-
r€ ~4>< e, {6,S~ @ l-lSCS~*
rt ~A-y: 7 (li.s,) e ~jS5$.r.{r
"4 >
Y4 .
/
;/ ' {If
.-- q~
I (~ "
~M. --(TYPo e H~'::> ~ #
oL "
-I ~
.
L II .
! (7 ~~I-+$S St(1 ~
7~ 0
-..J
:Jl
C
\1Yl
o
CD
..
~
0')
""CJ
n
,
III
('t
(J)
-I'
I.....
,
o
:J
w ~S (p t:/t ~i6
e-tZ-
l-J~s s# t<. S;)(o tl"t)F/S>O'7.
.....
:J
o
e AI '13>.1("1 D Is >0 .
o
o
I .
~~
~,
~-\\
/-~\)~~\ )'
! ,!\t?
" /" 06 110"0 \) /
r{ ~1\ ., //,' ,
\ Il \.; \'..1 .,,/ ~ /''''/'''0; I
,,\~~t/ :~~:;\7
U1
~
....
I
0')
0')
~
I
I\l
o
0')
....
o
BRACE SPLICE
1"=11-0"
-
S-'30 '2
~
,
,/'
31_3D
f
.I
2"_
>. ,
" ,
""CJ
.
B.1i H f
lYP. ,.
I\l
o
o
o
,
n
n
4l,
~w;mDlSH'
/lli"'~w~_~",
~
BUILDING CO.
'.
. ......'F_~" ~ _. .. .,'_"'-.J
Request for Information 095
~_., b'" __..,~. ~_~~,.~,~_.
Detailed, RFls Grouped by RFI Number
po~/
5258 Armed Forces Reserve Center Complex-I!
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
r:T::JA:!:H!li}:L"liWlMIIILI'W...IIII..."'.....,., _,~.".~..,,' "" ...." "'",,____ ~"",' ".,. " ...__" .... ~'. ~'" ,~.' ,
Answer Company Answered By Author Company
KPFF Consulting Engineers Nick Saari Ecklund Industries
111 SW. Fifth Avenue, Suite 2500 3001 leghorn Lane
Portland, Oregon 97204-3628 Eugene, Oregon 97402
'" ,-. 'tIIliI..);"l~erJmn;./~.;1~n)onr.i;1
Authored By
Ralph Bloom
Co-Respondent
Author RFI Number
Subject Discipline Category
Dimensions of studs on panel joint plates
Cc: Company Name Contact Name Copies Notes
Question Date Required: 8/31/2007
Reference 5/8" and 3/4"threaded welded studs on 4/S-605 and 5/S-605, please clarify dimensions.
Detail 4
Please clarify the sizes of the 3/4" plate and 1/2" plate. I believe they are both 1'-0", however do not show that way, Can
the studs be located the same distance from the center of the plate (now the location is asymmetrical of the plate
centerline")?
Detail 5
Please clarify dimension questions noted on the attached detail. Can the studs be symmetrical about the plate center
lines(s)?
Suggestion
Answer Date Answered: 8/31/2007
Dimensions are clouded on attached sketches. Note that threaded welded studs are to be field welded,
Prolog Manager
Printed on: 8/31/2007 JLT_Projects
Page 1
IIlIJI
.~
Request for Information 095
Detailed, RFls Grouped by RFI Number
5258 Anned Forces Reserve Center Complex~n Project # 5258
3110 Pierce Parkway Tel: (541)736-5843 Fax: (541)736-n16
SprinRfield, OreQon 974n
1iIIiIIv:~.,1 __~~"1..." .,-W--~ "'"'' ~I.III~~~~.~'IDfJ
MMrC:"""'l,'":1rt ", ,\:,~,A'ti:::;(,~:~~~:::J;_"'" AUifiar.~_:. ' ,- ;:':":"";~U,!,~,:J'BY .
KPFF Consulting Engineers Nick Saari Ecklund Industries Ralph Bloom
111 S. W. Fifth Avenue, Suite 2500 3001 leghorn Lane
Portland. Oregon 97204-3628,~~pene. Orepon 97402
Co-RMpcindent
AuItIot .fNumber.,
Subject
Dimensions of studs on panel joint plates
Dleclpllne
Category
Cc: Company Name
ContIct Name
CopIeS' NiOteI
CluGdcn ~RGqMlred: 8131t~,
Reference 518" and 3/4"threaded welded studs on 4/$.605 and 5/5-605, please clarify dimensions.
Detail 4
Please clarify the sizes ofthe,3/4n plate and 112" plate. I believe they are both 1'-0", however do not show that way. Can
the studs be located the same distance from the center of the plate (now the location is asymmetrical of the plate
, ...",..~....line")?
Detail 5
Please clarify dimension questions noted on the attached detaiL Can the studs be symmetrical about the plate center
Iines(s)?
~~..
Anawer.' "
D \ M ~61 0,'-.\5 A.fUG
Date An8wenNI:
c.L00beD
or--) fi.:\f~E:..D 0.\<'E.\C\-t-f:;S.
NOI'2
WA"\ '-~.....gADeD \N~Lbm ~\1.Jl)S
I\~ To \j ~ ~\ E:UJ WE'. If)"tb ~
A~~~ ~ /KPFF /5-31-0'7-
Prolog Manager
Printed on: 813112007 JLT_Projects
Page 1
y-u .~
b
I
..
or-
TYP. JOIST
EMBEDMENT
RECESS AS
REO'D. TO ~---~--
MAINTAIN lYp/ 'J't '\
BEARING / / 2\~ 0 \
EL7~JIO~k~ . /\
/ / -~ 1/-0 (I ~ .. ,/
./ / .,.<4
=-"'::l
r---J . ~~ -~ . / I
' J;: ;:~;; ;;'_1
./' II /I II II
""'----/" g g g g
IS I'-I\B~ N:.. ----
i.x: boX 1\-0"
w( 0) 3/~\'95 X b\(
l-\-l2.A1) et 6~ @. Gl" <) ,(. .
EA. w\~e. o~ _~'
'f AJ..! e: L .J.c. \rJ,,\ ...-_________/.--... \
/'
~-,/ PANEL ~,-
_~ JOINT I"
/
SECTION 8-8
056 oS
n1
, , -7 ~ '4' C"'~ "'" PM ""'~~::&-1' YI.""'" 6/J ~ -r! p""~",, )
, H/
: :~
~ -:----
~
II
N
'\.
,
"Xsltx2" SLOTTED
HOLES. CENTER
STU D IN SLOT
SECTION
At
1Ji"A d:,o/1Ji"
A-A
A
B
-
TOP or WAlL PANEL
REF. ELEVATION
~
1-;:: \
H
"~(2) 'i(."- THREADED
STUDS TO EACH
EMBEDMENT
t
:
~r--
-8
'I "YPsJO~ST AT PA "=L JOj:\JT
1 ": 1 r..on
. .. ..
r '\
2- "\ to., 1)2"
rl") ," #7-lYp
,- 1 /,' Ii 1\
~16 V.',. ~,-?.::/-
: 0 0-,/
: ' , I (:, I,
---~;:'
~o o-~~I~\\ J V
2- ~6
TYP. JOIST BRACKET
, .
: 4" r~" O\~)
: b,' / -{- ~~yl~~ -Lax4x-}Bx1"-," LLV
1~8"x2" SLOlTEr ~ 2 --:~ I '<J:/ DO NOT WELD TO
HOLES. ALIGN CII")~~~~e'"i~~-L _, . _ EMBEDMENTS,
~U~L~tt.~~.~~."""" ":)0 I 0,0 1. 0 ~ _ . ~"
OF Mr~ :r . 0, ):: e-t 0 :.;: '':)
::4-. , II +- ...
_____ ./ " .' . r ______ C<SN1" e,,- . 13 Rk<.A".eT
(4) *"(l5 THREADED- :. 0 / 0 0 0 ON el"l B\'::. t>-5 J
STUDS ../ "._ . ~/
:xs '" STIFFENER PL - --- 'I' I ............. ~ ~ lYP. EMBEDMENT
· -}=-- ----- ~ AT EACH PANEL
' . Z
: ' , REF. lYP. JOI,ST BRACK,EI
- EMBEDDED
PL ~x9x1' -3" wi
(6) *"(&x4" HEADED STUDS
L6x4~xO' -6"-
~.. STIFFENER PL-
TYP. ,JOIST, BRACKET AT PANEL JOINT
o
TV=-. JO~ST BRAe <=:T
1"=1'.()"
S6~
Page I of I
Jim Thomas-Building Division
From: Tony Dean
Sent: Thursday, August 30,20074:43 PM
To: Jim Thomas-Building Division
Subject: FW: Need help
From: Ralph B~.......... [mailto:rbloom@ecklundindustries.mm]
Sent: Thursday, August 30,20072:50 PM
To: Tony Dean
Cc: John Rawlings
Subject: Need help
Tony,
With regard to the 5/8" and 314" threaded weld studs on 4/ S-605 and 5 / 5-605, we can't clearly
find the c":~ ~~et ioeationS:' " ., ,
:Q~t_4
On the lk" x 6" x l' - 0" plates, it looks like they are on 3" centers, but what about from the end of
the plate? I see there is a 314" plate that will go over the studs and one ends has holes at 1112" in and
the other end has slots that are 2" in, I'm sure you don't want RIB and L/H embeds.
Det5
On the 3/8" x 9" x l' - 3" plates, it looks like they are centered on the 9" dim and 3" centers, but
again from the end of the plates is not clear.
Can you fill in the blanks for me?
Thanks!
Ralph M. Bloom
Ecldund Industries, Ine.
Sr. ProjectMgr. I Chief Estimator
Ph (541) 689-6677 Fax 689-7159
8/31/2007
Record of Conversation
1
.,
Detailed, Grouped by Each Number
5258 Armed Forces Reserve Center Complex-II
3110 Pierce Parkway
Springfield, Oregon 97477
Project # 5258
Tel: (541)736-5843 Fax: (541)736-7716
1111111 I
rL .: -..'
.. ".1
To:
BlM
Eugene Youngman
Logged By:
Wildish Building Co,
James Thomas
3110 Pierce Parkway
Springfield, Oregon 97477
Subject Due Date
Conduits to BLM Building
Details:
Don Davey, BHE, had indicated to me he failed to include the three 3" conduits under the footing (to extend to the
warehouse) as requested by the 35% review comments,
So we have 1-2"; 2-3" and 3-4" conduits instead of 3-3" and 3-4" as requested,
Eugene indicated this is "probably alright".
Cc: Company Name
Contact Name
Copies
Notes
Prolog Manager
Signature
Printed on: 8/31/2007 JL T _Projects
Signed Date
Page 1