Loading...
HomeMy WebLinkAboutPlan, Tentative APPLICANT 4/28/2016 (2)s NN _AAAA_.-------- �" iwlf^TAII wFI-tAI��M- INK - I -F A'P!• ____.- --'- _ 160'-011 \ -{_{+.+ + +{ ++ ++++ {�+.++{+ +{ ++ - ++t+ +++++++ + +++ + + { + + t + + _+ INV{++ {++++++{{++ ++}{{{{{{{{++++++++{{{{{ •- -. ��� iUELUIVC+{{t++ +{ +{+{® t +{}{++++} +{ +30129'2�EXISTING ++++ ++++++{++++{+++{++++ +{{+++++++ { { t++++ +++++++++ ++++ + ++++{�++t� + . -o' ++++++++++{{++{++ SHEDS +++ + + + }{ + + ++ + ++ + ++++++++ +�4+++ +++ + + + + + ++++++ +}+ t+ +++t+{} / 'A {{t + + + + + + + + + + + + + +++++++++++++++++++++ ++ +++++ 25F SETBACK FROM TO. CHANNEL BANK++ W W W W W W W W w + } t .{ + + + + + + + + { + + + + + + + + + + + + + { + + + + + + + + + + _ + + + + +++++++++++++++++. + + + + +++++++++++++ { + + + ++++++++++++ + (E) 8 CONCRETE 50 SETBACK FROM CL OF CHANNEL w W W w W AAAA w ., w W w + + + + + + + + + FF ' W w W w w w W W w w w ++++++{+++++}++}+++++++ CURB, TYR v w W w w �. W w AAAA W W W w W + + + + + + { ++++++++++++++++ ++}++++ + jj/ j� •Y W v v 'v W W v W v v v �L w v W w W W W W _--_ -�_ O NEW"CURB PROPOSEDwBETGVEEN— /// W w TOP OF CHANNEL BANK --- CHANNEL BANK AN15 SOGTH W w W w W W W W w w w W W W W W W W W W W W w W w W w W W v W W ,j// / ////j //// %!' , .• EIbg00f ST9RAAQE YARb W w W v v v W v v v v W W w v L W w w v w v w w w W W W W W w v w W W , W W / ✓.// ///////////////// //////////// , // /!. w w W W v W w w W W w W W w w W w w v w w w w W w w W w w w w v w v W w w w jCENTERUNE OF CHANNEL EASEMENTi .,jj/jj/ v v W W W v w w w W w v w w v w w W S W w v w w W W w w w w w W W W w W v W w w W W W W W w W w 0 01 0<- 0 o 17= z E I vi FE v° Lu w a d Lu 0> Ln F- CDLr)U w m N d ltl ~ Fr u- cy) - _ O uj CC Z rn I i— 7) LO f ! V) DRIVEWAY Z CURB CUT i �" L 4*' �a (E) S}DEWALK " -* W =XISTING w,W (E) L�NDSCAPE PLANTER STRIP (E) LANDSCAPE v W W w PLANTER ' • i/j//j//� W w w w _ :;_I Lu W STRIP I W .'. w w .'. AAAA w w w w w w W AAAA W W W w w w W W W w W W w w w AAAA w w w W w w LLLLLL7777 W w W w w w w w W W w w w w w v w w w w w w w w W w w W w w w w v W W EXISTING v• OYV E"V/W w AAAA w W w W W W W • AAAA.... `v, -EG �� y�T�D �"....EAW W v W w w W W W w v w w • w w w w W w W W w w v w v w A w W w v W W •, w w w �. w W w w w W w w W w w w w W W W W W w w W w ., W w w ® w• v W w w w w w w W ., W w w W w w w w w w w W w w w w . W w •� W w w W W w w w w W W W W w w W W W W W W N7qo 44,20 w w W W W W w W W W W W W W v W v W W W w W W F, W33 W w W w W W w W w W w W w w W .35' 1-10S 9 ', 05 HI W w w W w w W w 1 w W GNWAY w W w W W w W w IN y y N 890 21'45" W 238.08' (E) WOODEDNEGETATED AREA TO SERVE AS VISUAL SCREENING FOR SOUTH BOUNDARY OF OUTDOOR STORAGE YARD INSTALL NEW SCREENING SLATS AT EXISTING FENCING, TYPICAL (E) DRIVEWAY & CURB CUT -------- w w w 2 1 N LO EXISTING PARKING w w W L('y w v w w w w W W w w w w v W W W w w W w W w w C W W W Q 24 ?322 w Y W w . v (�> TRASHY w W 18 17 16 15 14 13 y w w W w ,.y�'�Lbs k w w W AAAA ., W W w W W W w w w W W w W W w W C'V w IJJV IC w W w v w w • • •�� �jlv.rl�®.Y •w w• w`® •w w w w W W w w W • • , , IN , a`Fa� s��e •`y air �Yy� .r.®. �rrrrr yes. S 88° 57' 00" W 115.34' ' SITE PLAN A0.01 SCALE: 1" = 20' IN 60'-411 , IN �-25 1 i` EXIST. DETACHE SHED STANDARD 9' X 24' 9' -OFF EXISTING 0 ATTACH ED SHED 25' SETBACK FROM TO. CHANNEL BANK (FROM 1999 SITE PLAN, UNVERIFIED) + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + O lJ N PA -V D+ + + - 50' SETBACK FROM CL OF CHANNEL + + + + + + + + + + + + + + + + + + + + + + + + + + STORAGE-Rp+ + + (E) ASPHALT (FROM 1999 SITE PLAN, UNVERIFIED) + + + + . + + + + + + + + + . . + + + + -I- + + + + + + + -r + + + ++ + + + + + + + + + + + + + + + + + + + + + + (-X42.001S.j F + + + PAVEMENT (E) STORMWATER + + + + + + + + + + + + + + + + + + + + + + + + + + + + CATCHMENT BASIN INSTALL NEW SCREENING SCATS �" _+ + + + + + + + + + + + + + + + + + + + + + + AiXfSTING 1#ENCENG, APICAL '- + + + + + + + + + + + + + + + + + + + + + + + + + + + + + (E) 8" CONCRETE tel/ + + + CURB 0— NEW CURB PROPOSED BETWEEN _ H NNELAANK EDGE OF TORAGEOYARD UTH (E} LIGHT POLE EXISTING CONCRETE TILT -UP BUILDING/WAREHOUSE MDS APPLICATION IF THE ABOVE DIMENSION DOES NOT MEASURE ONE INCH ((11 EXACTLY, THIS DRAWING WILL HAVE BEEN ENLARGED OR REDUCED, AFFECTING ALL LABELED SCALES. BY I REVISIONS DATE Date: 04.27.2016 Scale: AS NOTED Drawn: JLF Z Job: 16007 Sheet J TOP OF CHANNEL. BANK — (FROM 1999 SITE PLAN, UNVERIFIED) 2 ENLARGED SITE PLAN AAW N A0.01 SCALE: 1" = 10' A0001 M tVl WR DeVe 0 pn'N-tni- 5 APR 2 8 2016 (.184° 12120" .46' �,... T ® i 26 I 28 27 \\` 138'-6" FF � • t + 30 29 r,o...... ,- �- + + + + + + + + • , -t- + + + + + + + + + + + + + + 7 -I- + + + + + + + + + + + + + + + + + + � + + + + + + + + + + + + + + + + + + + + + + + + -I- + + + + + + + + + + + + + + + + + + + + + + + + + + + ' \r• ' • + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + 0: ----"' '+ -I- + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + o + 1 s1 F t + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + -.. . + . + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + t I COMPACT + + + + + + + + + + + + + + + + .i 7— `� + .._._ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + C6MPACT C611PACT 1 + + + + + + + + + + + + + + + + + + + + + �' ... .± + + + + + + + + + + + + + + + + + + + + + + + + + + + + COMPACT CbMPACT ` + + + + + + + + + + + + + + + + + + + + + + + +�+ ' -�- + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +±'` + -E . + + + + + + + + + + + + + + + + + + + (N) STRIPING FOR + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +___+ , + ----t+ . + + + + + + + + + + + + + + + + „ + 8 -0 STALLS 25-30 + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + - + T - . + + + + + + + + + + + + + + (E) STRIPING TO + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +—+ +- _+. + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + `1+- t_ + + + + + + + `� + -+ + + + BE REMOVED + + + + + {- + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + _ -+ ___+_ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + . +_ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + �-25 1 i` EXIST. DETACHE SHED STANDARD 9' X 24' 9' -OFF EXISTING 0 ATTACH ED SHED 25' SETBACK FROM TO. CHANNEL BANK (FROM 1999 SITE PLAN, UNVERIFIED) + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + O lJ N PA -V D+ + + - 50' SETBACK FROM CL OF CHANNEL + + + + + + + + + + + + + + + + + + + + + + + + + + STORAGE-Rp+ + + (E) ASPHALT (FROM 1999 SITE PLAN, UNVERIFIED) + + + + . + + + + + + + + + . . + + + + -I- + + + + + + + -r + + + ++ + + + + + + + + + + + + + + + + + + + + + + (-X42.001S.j F + + + PAVEMENT (E) STORMWATER + + + + + + + + + + + + + + + + + + + + + + + + + + + + CATCHMENT BASIN INSTALL NEW SCREENING SCATS �" _+ + + + + + + + + + + + + + + + + + + + + + + AiXfSTING 1#ENCENG, APICAL '- + + + + + + + + + + + + + + + + + + + + + + + + + + + + + (E) 8" CONCRETE tel/ + + + CURB 0— NEW CURB PROPOSED BETWEEN _ H NNELAANK EDGE OF TORAGEOYARD UTH (E} LIGHT POLE EXISTING CONCRETE TILT -UP BUILDING/WAREHOUSE MDS APPLICATION IF THE ABOVE DIMENSION DOES NOT MEASURE ONE INCH ((11 EXACTLY, THIS DRAWING WILL HAVE BEEN ENLARGED OR REDUCED, AFFECTING ALL LABELED SCALES. BY I REVISIONS DATE Date: 04.27.2016 Scale: AS NOTED Drawn: JLF Z Job: 16007 Sheet J TOP OF CHANNEL. BANK — (FROM 1999 SITE PLAN, UNVERIFIED) 2 ENLARGED SITE PLAN AAW N A0.01 SCALE: 1" = 10' A0001 M tVl WR DeVe 0 pn'N-tni- 5 APR 2 8 2016