Loading...
HomeMy WebLinkAboutItem 09 P41020 Channel 6 Firm Update Direct Appointment Contract AGENDA ITEM SUMMARY Meeting Date: 3/7/2016 Meeting Type: Regular Meeting Staff Contact/Dept.: Molly Markarian/DPW Staff Phone No: 541-726-4611 Estimated Time: Consent Calendar S P R I N G F I E L D C I T Y C O U N C I L Council Goals: Maintain and Improve Infrastructure and Facilities ITEM TITLE: P41020 CHANNEL 6 FIRM UPDATE DIRECT APPOINTMENT CONTRACT ACTION REQUESTED: By motion: TO APPROVE DIRECT APPOINTMENT OF AMEC FOSTER WHEELER FOR THE CHANNEL 6 FIRM UPDATE ENGINEERING SERVICES CONTRACT IN THE AMOUNT OF $50,993 AND AUTHORIZE THE CITY MANAGER TO EXECUTE THE CONTRACT. ISSUE STATEMENT: The City is proceeding with the next step towards implementing the recommendations of the 2014 Channel 6 Stormwater Master Plan, which includes improving the accuracy of the FEMA floodplain maps for the Channel 6 basin. ATTACHMENTS: 1. Contract 2. Direct Appointment DISCUSSION/ FINANCIAL IMPACT: The City used a competitive Request for Proposals process in April 2013 for professional engineering services to develop a Stormwater Master Plan that would analyze the Channel 6 basin’s capacity and functions in order to inform and prioritize the design and construction of future capital projects. The City ultimately selected AMEC Environmental & Infrastructure, Inc. (AMEC) and executed a contract in July 2013. AMEC’s scope of work specified the development of hydrologic and hydraulic modeling for Channel 6 using the standards and guidelines established by FEMA to allow the model to be used to later convert the Channel 6 floodplain mapping from an approximate study with no established base flood elevations to a detailed study with base flood elevations established and floodplains and floodways accurately mapped. AMEC completed the Stormwater Master Plan in 2014, and the City is proceeding with the floodplain mapping updates for Channel 6. Direct appointment of AMEC to provide the required specialized engineering services for this project would not diminish competition as the firm has the institutional knowledge of the project, and it is in the City’s and the public’s best interest to continue working with AMEC. In direct appointing AMEC for this task, the City will accrue cost savings by building on AMEC’s prior modeling work in the Channel 6 basin to prepare a complete submission package to FEMA. In addition, cost savings will accrue from employing a direct appointment process in lieu of a separate formal solicitation. The fee for this phase of the project is estimated to be $50,993. Combined with the work under a previous contract ($144,403), the total contract value is below the state threshold of $250,000 for direct appointment contracts, as stipulated in OAR 137-048-0200 (1)(c)(A)(B)(C). AT T 1, Pa g e 1 of 23 AT T 1, Pa g e 2 of 23 AT T 1, Pa g e 3 of 23 AT T 1, Pa g e 4 of 23 AT T 1, Pa g e 5 of 23 AT T 1, Pa g e 6 of 23 AT T 1, Pa g e 7 of 23 AT T 1, Pa g e 8 of 23 AT T 1, Pa g e 9 of 23 AT T 1, Pa g e 10 of 23 AT T 1, Pa g e 11 of 23 AT T 1, Pa g e 12 of 23 AT T 1, Pa g e 13 of 23 AT T 1, Pa g e 14 of 23 AT T 1, Pa g e 15 of 23 AT T 1, Pa g e 16 of 23 AT T 1, Pa g e 17 of 23 AT T 1, Pa g e 18 of 23 AT T 1, Pa g e 19 of 23 ATTACHMENT 1: Channel 6 LOMR Scoping Map CHANNEL 6 Existing HEC-RAS Base Model Convert from SWMM to HEC-RAS Existing Detail Study HWY 126 I-5 FREEWAY Q STREET CHANNEL New HEC-RAS Model C1630 AMEC Foster Wheeler Page 20 of 23 ATT 1, Page 20 of 23 Schedule - Channel 6 Floodplain Mapping LOMR Date: February 3, 2016 Task and Activity Start Finish Feb Mar Apr May Jun Jul Notice to Proceed 2/25/2016 l 1 Project Coordination 2/25/2016 7/31/2016 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1.1 Project kick-off meeting 2/28/2016 l 1.2 Progress billings Monthly l l l l l l 2 Reconnaisance and Data Review 2.1 Locate Sections for Ground Survey of Downstream Area 3/3/2016 3/9/2016 1 2.2 Field Reconnaissance of Downstream Area and Structures 3/10/2016 3/16/2016 1 2.3 Obtain Water Surface Data from the City 3/4/2016 l 3 Coordinate with City's Downstream Ground Survey 3/10/2016 3/21/2016 1 1 City Performs Downstream Survey 3/10/2016 3/21/2016 4 Downstream Flow Analysis 3/10/2016 3/30/2016 1 1 1 5 Hydraulic Floodplain & Floodway Modeling 5.1 Obtain LiDAR Ground Surface 3/4/2016 l 5.2 Expand base mapping 3/3/2016 3/16/2016 1 1 5.3 Create Downstream Hydraulic Model 3/24/2016 4/13/2016 1 1 1 5.4 Convert Upstream Hydraulic Model 3/17/2016 4/13/2016 1 1 1 1 5.5 Execute & Check Hydraulic Model 4/7/2016 4/20/2016 1 1 5.6 Calibrate Hydraulic Model 4/14/2016 4/20/2016 1 5.7 Map Floodplain Boundaries 3/31/2016 4/27/2016 1 1 1 1 5.8 Establish & Map Floodway 4/21/2016 5/4/2016 1 1 5.9 Hydraulic Model QA /QC 5/5/2016 5/9/2016 1 5.10Complete Digital Workmap and Certification 5/9/2016 l 6 Prepare Engineer Report 4/21/2016 5/9/2016 1 1 1 7 FEMA LOMR Submittal 7.1 Prepare FEMA MT-2 Forms 3/17/2016 4/13/2016 1 1 1 1 7.2 Assist City with Public Notification Requirements 3/17/2016 4/13/2016 1 1 1 1 7.3 Assemble submittal files 5/12/2016 5/16/2016 1 8 Respond to FEMA Review Comments 5/19/2016 (FEMA review) 9 Hydraulic Modeling of Priority CIP Sites 9.1 Model and Map Floodplain Boundaries for Priority CIPs 5/5/2016 6/1/2016 1 1 1 1 9.2 Model LOMR Floodway with Proposed CIPs 5/19/2016 6/1/2016 1 1 9.3 Prepare a Technical Memorandum on Findings 5/26/2016 6/13/2016 1 1 1 Legend:1 Period of activity by Amec Foster Wheeler Period of occasional activity for Amec Foster Wheeler to respond to FEMA comments Period of survey data measuring by City crews 2016 C1630 AMEC Foster Wheeler Page 21 of 23 ATT 1, Page 21 of 23 Ch a n n e l 6 F I R M U p d a t e F e e E s t i m a t e - A m e c F o s t e r W h e e l e r - 1 / 0 8 / 2 0 1 6 PM Q A / Q C Ad m i n S u p p o r t Task Hours Task Cost St a f f N a m e H. M a t i n S. J e l e n T. M a r l e y A. Y e l l o w b e a r Ho u r l y r a t e 16 4 $ 1 6 4 $ 1 0 5 $ 6 0 $ Ta s k Ta s k D e s c r i p t i o n 1 Pr o j e c t C o o r d i n a t i o n 8 4 1 13 2,024 $ 1. 1 Pr o j e c t k i c k - o f f m e e t i n g 4 4 1 9 1. 2 Pr o g r e s s b i l l i n g s 4 4 2 Re c o n n a i s a n c e a n d D a t a R e v i e w 1 7 8 16 2,147 $ 2. 1 Lo c a t e S e c t i o n s f o r G r o u n d S u r v e y o f D o w n s t r e a m A r e a 1 3 4 2. 2 Fi e l d R e c o n n a i s s a n c e o f D o w n s t r e a m A r e a a n d S t r u c t u r e s 4 6 10 2. 3 Ob t a i n W a t e r S u r f a c e D a t a f r o m t h e C i t y 2 2 3 Co o r d i n a t e w i t h C i t y ' s D o w n s t r e a m G r o u n d S u r v e y 1 3 4 478 $ 4 Do w n s t r e a m F l o w A n a l y s i s 2 4 16 22 2,657 $ 5 Hy d r a u l i c F l o o d p l a i n & F l o o d w a y M o d e l i n g 14 80 32 126 18,734 $ 5. 1 Ob t a i n L i D A R G r o u n d S u r f a c e 2 2 5. 2 Ex p a n d b a s e m a p p i n g 1 4 12 17 5. 3 Cr e a t e D o w n s t r e a m H y d r a u l i c M o d e l 2 16 6 24 5. 4 Co n v e r t U p s t r e a m H y d r a u l i c M o d e l 2 16 6 24 5. 5 Ex e c u t e & C h e c k H y d r a u l i c M o d e l 2 8 4 14 5. 6 Ca l i b r a t e H y d r a u l i c M o d e l 1 8 2 11 5. 7 Ma p F l o o d p l a i n B o u n d a r i e s 1 4 5 5. 8 Es t a b l i s h & M a p F l o o d w a y 1 16 17 5. 9 Hy d r a u l i c M o d e l Q A / Q C 4 4 8 5. 1 0 Co m p l e t e D i g i t a l W o r k m a p a n d C e r t i f i c a t i o n 4 4 6 Pr e p a r e E n g i n e e r R e p o r t 4 16 8 1 29 4,170 $ 7 FE M A L O M R S u b m i t t a l 5 22 4 1 32 4,897 $ 7. 1 Pr e p a r e F E M A M T - 2 F o r m s 2 12 14 7. 2 As s i s t C i t y w i t h P u b l i c N o t i f i c a t i o n R e q u i r e m e n t s 1 2 3 7. 3 As s e m b l e s u b m i t t a l f i l e s 2 8 4 1 15 8 Re s p o n d t o F E M A R e v i e w C o m m e n t s 2 16 2 20 3,155 $ 9 Hy d r a u l i c M o d e l i n g o f P r i o r i t y C I P S i t e s 9 40 16 65 9,694 $ 9. 1 Mo d e l a n d M a p F l o o d p l a i n B o u n d a r i e s f o r P r i o r i t y C I P s 4 24 12 40 9. 2 Mo d e l L O M R F l o o d w a y w i t h P r o p o s e d C I P s 1 4 5 9. 3 Pr e p a r e a T e c h n i c a l M e m o r a n d u m o n F i n d i n g s 4 12 4 20 Ta s k 1 t h r o u g h 9 T o t a l H o u r s 46 18 9 89 3 327 47,956 $ Ta s k s 1 t h r o u g h 9 T o t a l C o s t 7, 5 2 8 $ 30 , 9 3 0 $ 9, 3 1 9 $ 179 $ Op t i o n a l T a s k 10 Pu b l i c I n v o l v e m e n t ( O p t i o n a l ) 8 8 4 20 3,037 $ 10 . 1 Op e n H o u s e F l o o d p l a i n R e v i e w M e e t i n g 4 4 2 10 10 . 2 FE M A P u b l i c M e e t i n g 4 4 2 10 Hy d r a u l i c M o d e l i n g / F E M A S u b m i t t a l C1 6 3 0 A M E C F o s t e r W h e e l e r Pa g e 2 2 o f 2 3 AT T 1, Pa g e 22 of 23 AT T 1, Pa g e 23 of 23 At t a c h m e n t 2, Pa g e 1 of 1