Loading...
HomeMy WebLinkAboutPermit Plumbing 1997-5-16 COM M ERCIALlI N DUSTRIAL' PERMIT APPLICATION SPRINGFiELD JOB NUMBER 97c:>-?77 INSPECTION LINE: 726-3769 OFFICE: 726-3759 , , 225 Fifth Street, Springfield, Oregon 97477. LOCATION OF PROPOSED WORK: 6~1> ~~r ~~/Yr~#~~.#~ ASSESSORS MAP' /70~...:Z?... ~'"3 'TAX LOT: 3LVP ~ C'5""'S!#~ OWNER:rv/ /~L. pe~ J{<?~E ~'~,'~~PHONE:~:-f,t"~~&7p. ADDRESS:J/4/.LJe::> ~C ~~~;Z~ CITY: t3Z? t.eY' PG STATE: .~"ZIP: 9'g~?" 77~~~.~~ _~ ,~~~.~ DESCRIPTION OF WORK: ~AI(!;~~ NEW REMODEL ADDITION , DEMOLISH OTHER VALUE: NAME ADDRESS PHONE ARCHITECT: CONTRACTOR'S NAME ADDRESS CONST. CONTRACTOR # EXPIRES PHONE GENERAl' ~.., , " 1/... ~ ' ~~i_ ~~~ V6~ ~y . PLUMBING:M-4V~"'~~. ~ ~....... 9?Y"~~(_ ~7~" /~...~~':? ,?~,. /~::</ MECHANICA' . ELECTRICAL: PLUMBING I MECHANICAL NO. ' FEE CHARGE I Nn 1=1=1= r.HARnl= 7 Single Fixture / i!!J ?~~' I Furnace/ burner & vent < 100,000 BTUs Relocated Bldg. I Furnace/ burner & vent (new fix. addtll > 100.000 STUs ' Water Service I I Floor furnace and vent I ft. Sanitary Sewer I I Suspended wall or floor I' ft. mounted unit heater Storm Sewer I Appliance Vent I ft. separate I Stationary evap. I 1< Backflow Device cooler ' I I, Vent Fan/Single I I I duct I I Vent System apart I "I I from AC or htg. : I Mechanical exhaust I I I hood and duct I I I I I I Permit Issuance I $10.00 I TOTAL PERMIT 17~~1 TOTAL PERMIT I I - OFFICE USE - HANDICAP ACCESS: QUAD AREA' LAND USE: FLOOD PLAIN: ZONING: ' # OF BLDGS: # OF UNITS: CONSTA. TYPr=. HEAT SOURCE: LIGHTING POWER BUDGET: WATER HEATER: OCCY GROUP: # OF STORIES: SQ. FT. $/SQ. FT. VALUE SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER X X X TOTAL VALUE OF ,PROJECT PLAN CHECK FFI= RCPT# . DATE: BY I BUILDING PERMIT '5% State Surcharqe MECHANICAL . PLUMBING 15% State Su rcharqe , PAVING' I I I 5% State Surcharqe I FENCE VALUE $ I SIDEWALK I CURBCUT ~ 7~~' I D~iv10LlTION ~... 5!ttt:> ~./~ FT. I FT. I SUBTOTAL ' PERMITS . . I SYSTEMS DEVELOPMENT ) I I I . I 1l'd'1'V744:J1ITW I \ " ~. ". TOTAL PERMIT FEES EXCLUDING ELECTRICAl 7~ t6e> REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all ,Inspections are made at the proper time. To request an Inspection, call 726.3769 (recorder), state your City designated job number, job address, type of Inspection requested and when you will be ready for Inspection. Reql,lests received before 7:00 a,m. will' be made the same working day, requests made after 7:00 a.m. will be made the following work day. ' SITE INSPECTION: To be made after e~cavatlon; but prior to setup of forms. x ROUGH PLUMBING, . ELECTRICAL & MECHANICAL: No work Is to be covered until these Inspections have been made and approved. UNDERSLAI(PLUMBING:) ELECTRICAL &. , 'MECHANICAL: To be made before any work Is covered. ATTIC DRAFT STOPS & . CURTAIN WALLS FIREPLAcE: Prior to placing facing materials and before framing: Inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are In place and all pIpes, chimneys and vents are complete and ,the'rough electrical, plumbing and mechanical are approved. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel In place, but prior to placl ng concrete. CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, piping, accessories and other . ancillary equipment Items are In place but before any concrete is placed~ INSULATION & VAPOR BARRIER: To be made after all Insulation and requlrea vapor barriers are In place .but before any lath or gypsum board Interior wall covering Is applied. .' FIRE & SEPARATION WALL: 'Located a'nd constructed according to plans. UNDERGROUND: Plumbing, electri"cal, gas, sanitary sewer, storm sewer, wafer and drainage lines. To be made prior to covering or filling trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor insulation, decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is in place but before any, plastering Is applied or before gypsum board joints and fasteners are taped and finished. POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub.base material in place. MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415. ROOF SHEATHING AND NAILING: Prlor'to Installing any roof covering. CURB AND APPROACH APRONS: After forms are' erected but prior to placl ng concrete. PAVING: After gravel Is in pla'ce but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special Inspector shall be employed by the ,Ownerl Contractor during consfructlon of the following work. A copy of the special testing reports shall be furnished to the Building Division. STRUCTURAL CONCRETE: In excess of 2500 P.S.1. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 f) HIGH STRENGTH BOLTING: During all bolt Installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.B.C. Standards 43-8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. STDS. 25-10,11). STRUCTURAL MASONRY: (306 a.7) *In addition to the Inspec. tic;:ms specified, the Building Official may make or require other Inspections of any construction work to ensure compliance with the Building, City or Development Code. FINAL PLUMBING -----------------------------~-----------------~------- SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this Inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department Inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been Issued by the Building Division and posted on the premises. FINAL ELECTRICAL FINAL MECHANICAL \, , \ FINAL FIRE,DEPARTMENT ADDITIONAL COMMENTS: , , ....--. ' PLANS REVIEWED B~~~ DATE ~/6...9? By signature, I state and agreEl, that I have carefully examined the completed application and do hereby certify th~t all Information herein Is true and correct, and I further certify that any and all work performed shall be done In ac,c:ordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described heteln, and that NO OCCUPANCY will be made of any structure without permission of the BUilding Safety Division. I further certify that only contractors and employees who are ih compliance with ORS 701.055 will be used~ on this pr.oject. I further agree to ensure that all requlre,d Inspections are requested ~t the proper tIme, that project address Is readable from the street, that the permit card Is located at the' front of the property. and the approved set of plans will remain on the site at all times durln~tructlon. r Slgnature~ -?~-V t Date5-1c., - C(7' VALIDATION: AMOUNT RECEIVED' 79: &:, 0 '2~R,/7 , RECEIPT #: DATE PAID: RECEIVED BY: S-//(b/y ? ( ~' <;. ' (