Loading...
HomeMy WebLinkAboutPermit Building 1997-5-8 CO M M ERCIALlI N D U 5T RIAt PERMIT APPLICATION OWNER: nl J':)(1) Vl CITY: DESCRIPTION OF WORK: s4e.f)~ NEW 1)( REMODEL NAME ARCHITECT: ..;, ,I' I: ';, ~~ ~ 1.1' ?'. :': JOB NUMBER ~7~" 5 77 A INSPECTION LINE: 726-3769 OFFICE: 726-3759 MECHANICAL FEE CHARGE NO Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent > 100,000 BTUs Floor furnace, and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationaryevap. cooler Vent Fan/Single duct Vent System apart from AC or htg. Mechanical exhaust hood and duct ! ~l j' \ SPRINGFIEL;O --- /0 t:::; ~ o--D PHONE: ~&~j 1~2."/ >"/5 I I I I I I I I Permit Issuance TOTAL PERMIT _J?l.. \1 0 TAX LOT: #- ?2-0 STATE: _I >>'4 ' ~ ZIP: /~O() 4 , I I}(jp VALUE: 36 d~ ~ PHONE GENERAL: JA.l, en CONST. II.;J 'if, ' L. ADDRESS CONTRACTOR # EXPIRES0198' PHONE C?l'lfA y-g 1t?lotJ fI}.S3d srr '~M, eve? 7~fd314'7 CONTRACTOR'S NAME PLUMBING: MECHANICAL: ELECTRICAL: PLUMBING NO. Single Fixture Relocated Bldg. (new fix. addU) Water Service ft. Sanitary Sewer ft.. Storm Sewer ft. Backflow Device TOTAL PERMIT QUAD AREA: # OF BLDGS: OCCY GROUP: # OF STORIES: ," SQ. FT. SQ, FTG MAIN SQ, FTO AC,CESS ~I . SQ, F\:G'-OWiER PLAN ~HECK FEi ---,;2. ~~: 1.3 I BUILDING PERMIT I #-ft.J 5% State ?JI..' J.-I.~1 ":2 >7 Surcharge~' -r.""I . ~.' MECHANICA~ I - 15% Stat~,_.,\.:,--:-c"J._ , Surcharqe '.. .., \1, , I PAVING I " .:. ...~ " ", $ ~l;':J /' rR;J1t2sw ~~4~ ADDITION DEMOLISH OTHER ADDRESS - OFFICE USE - 1=1=1= r.I-IARnl= I I' I I I I I I I I I 'I' , I I I $10.00 LAND USE: FLOOD PLAIN: HANDICAP ACCESS: # OF UNITS: CONSTR. TYPE: HEAT:SOURCE:- ZONING: : LIGHTING POWER BUDGET: WATER HEATER' ....., $/SQ. FT. " " ' ,YALUC- x x X TOTAL VALUE OF PROJECT RCPT# 2. _('7~ ~G. DAtE f~;47 BY I PLUMBING 15% State Su rcharge I FENCE VALUE $ SIDEWALK I CURBCUT I I FTI FT. I I DEMOLITION I '-susTUTAL , '" I ~~~MITS , I SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL , " " ~ 52.. ~ ~~~ I I . I , .1 I 7~7 tro " REQUIRED INSPECTIONS . , It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. ' SITE INSPECTION: To be ROUGH PLUMBING, made after excavation, but ELECTRICAL .& ' prior to setup o! forms. MECHANICAL: 'No work is to be covered until these inspections have been made and approved. PAVING: After gravel is in place but prior to placing asphalt or concrete. UNDERSLAB PLUMBING, , ELECTRICAL &, , MECHANICAL: To be made before any work is covered. L.- SPECIAL INSPECTIONS: In accordance Section (306 of the State Specialty Code a~special inspector shall be employed by the Owner! Contrac.t()rduring construction of the"fo"llowing work. A copy oUhe special,testing reports shall be furnished to the Building Division. ATl:IC DRAFT STOPS &. , CURTAiN WALLS ~ . FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. . FIREPLACE: Prior to placing facing materials and before frami ng inspection. CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any conc'rete is placed. , FRAMING: To be made after the roof,'all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 P.S:1. (306 a.1) V /. STRUCTURAL WELDS: Performed on the job. (2722 f) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. INSULATION & VAPOR BARRIER: To' be made after all insulation and required vapor barriers are in place but before any lath or gypsum board Interior wall covering is applied. HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.B.C. Standards 43-8. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. FIRE & SEPARATION WALL: Located and constructed according to plans. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) POST & BEAM: To be made prior to Installation of floor insulation, decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before any' plastering is applied or before gypsum board Joints and fasteners are taped and finished. GLU.LAM BEAMS: Inspection Certificate by an 'approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. STDS. 25-10,11). STRUCTURAL MASONRY: (306 a.7) FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415. SIDEWALK & DRIVEWAY: Requi red for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. .In addition to the'inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. ------------------------------------------------------- FINAL PLUMBING SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as Ia.ndscaplng, parking lot striping, etc. must be completed before requesting this Inspection. FINAL ELECTRICAL ~ I ~d'WZx2 , FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and. posted on the premises. . c::!5~~ C--~ ;~&hI?~/T /5 ....f~d~ ~ /"'~AfIJ'~ y ~ " FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS: PLANS REVIEWED BY ~~ ...'-. ~ ..- DATE c- /~ 7 -/ I By signature, I state and agree, that I have carefully examined the completed application and do hereby certify thft all information herein is true ana co'rrect; and I further certi.fy that any and all work performed shall be done in"accordapce with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify,that only.contractors and employees who are in compliance with ORS 701.055 will be used on this project.. . , ' ' I further agree to ensure that all requi red inspections are requested at the proper time, that proje9t address. is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans.will remain on the site at all times during construction. Signature'~~ ~~,~. p'/ t/" / Date 5/8"/"77 ?~67 ~~ VALIDATION: AMOUNT RECEIVED: '77: ttt) (, <- /---<'i" ~-c., RECEI PT #: DATE PAID: RECEIVED BY: