HomeMy WebLinkAboutPermit Plumbing 1985-11-6
.. RESIDE'.IAL..
APPLICATION/PERMIT
225 North 5th Street
Springfield~ Oregon 97477
Building Division
726-3753
. i
~fIA~
. SPRINGFIELD
Job Location: 7;;L1
~
ASGessors Map #
Suhdivision:
T= Lot #
fAmeI': ~ ~A(~
Addres;: . qS-c;s:' CSc"W~~
City:)t~~ - ~
I Np.w
I Addition
I Remodel
~ Nobile Home
Phone: t/:; 3. i - ~S;'II
Zip:
~s~
/l-~-~~.
I Contractors
I
I
Ii
Ii
Date of Application
General
vazw#
AdcLwess
Electrical
~~.
88' ~gf' 1~r..tt.M." c,,/ ---31t/~
. VI
'1//e/l(,
. ,
Plumbing
Mechar.icd
Construction Lender
.ce:pt ,Ii
- ,
I~ v!5S-p
.........
t~
j~i
Sigr..ed:
Date:
.~
Lise. II' \
Expines .
Phone
---.. ,
It is the responsibility of the permit hoUier to see that all inspections are made; at t~e proper time, that each ~ess is ren~n~:e
from the street, and that the permit card is located at the front of the property.
~BuiZding Divicion approved Flan shall remain on the Building Site at all times.
PROCEDURE FOR INSPECTION REQUEST:CALL726-3769 (recorder) state your City designated job nwnber, job aa=ess, type of inspecticn
requested and when you will be ready for inspection, Contractors 01' fAmel'S ncme and phone number. Requests received before 7:00 ~
;,.'ill be made the same dcy, requests mcde aft= 7:00 am will b8 made the n=t :.Jorking day.
Your City Desigr.ated Job Numba Is: g~ /0 S-?,
Reauiped InsDp.cticns
SITE INSPECTION: To be made
excavation, but prior to set
forms.
o
,0
o
after
up of
UNDERSLAB PLUMBING, ELECTRICAL &
, I.fECHANICAL: To be made before any
work is covered.
o
FOOTING & FOUNDATION: To be made
after trenches are eXcavated and
forms are erected, but prior to
pourir~ concrete.
UNDSRGROUND PLUMBING} SErVER, WATER,
DRAINAGE: To be made prior ,to fiZ-
.ling trenches.'
o
UNDERFLOOR PLUMBING & MECHANICAL:
To be made prior to installation of
[Zoor insulction 01' decking.
POST AND BEAM: To be made prior to
installation of floor insulation 01'
decking.
ROUGH PLUMBIllG, ELECTRICAL & MECH-
ANICAL: No work is to be covered'
until these inspections have been
~ade and approved.
FIREPLACE: Prior to placir4 facing
materials and before framing inspec-
tion.
DI FRAHING: Must be requested after
approval of rough plumbing, electri-
cal & mechanieal. AU roofing
bracing & chimneys, eta. nr~st be
, completed. No work is to be con-
'~cealed until this inspection has
'been made and approved.
10
I
10
I
I
D
~
[J
c=J
O INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulation ~4
, required vapor barriers are in place
, but before any lath, gypsum ,board or
LXlll covering is applied, and before
any insulation is concealed.
o
DRYWALL INSPECTION: To be made
after aU drywall is in place,
but prior to any 'taping.
DEI-fOLITION OR :',lOVE] BUILDIiiCS
~ Sani tary se',.)er ~apped ~t p~opcrty line
~ Septi~ tank p';,i,yed and filled with gra;;;;Z
I Pinal - r>'hen above iterns are ccmp7..eted
~ and when demolition is complete 01' stru~-
ture moved and premises ~leaned up.
Mobile Homes
O MASONRY: Steel
beamG, grouting
aecordance with
2415.
O WOODSTOVE: After installation is
completed.
location, bond
or verticals in
U.B.C. Section
D
CURB & APPROACH APRON: After forms
are ere~ted but prior to pouring
concrete.
~ Blocking and Set-up
=:J Plumbing connections SCLJer ar~ water
~ Electrical Connection - Blocking, set-up
---l and plumbing connections nr~st be approvei
before requesting eZectrical inspection
.=J AccesGol"" Building
I Pinal - Aftcr p:Jrches, skirting, decks,
---l ete. are completed.
D
FINAL PLUMBING
All project conditions, GUC~ as the installation of street trees, co~letion of the
required landscaping, etc., must be satisfied before the BL~LDINC FINAL can be r8quest3d.
FINAL ME~HA!lICAL
o
, FINAL BUILDING: The Final Building Inspection must be requested cIteI' the Final Plumbing
Electrieal, and Mechar.ical Inspections have been made and approved.
FINAL ELECTRICAL
D
SIDEWALK & DRIVEr';AY: For aU con-
crete paving within street right-
of-way, to be made after alZ exca-
vati~g complete & form work & sub-
base material, in p~ce.
PENCE: r.'hen comPlet~"\. Provide'
gates 01' movable sections\(hrough
P.U,E.
\
\',
\
~ALL MANHOLES AND CLEANOUTS lWST BE ACCESSIBLE, ADJUST/fElIT TO BE l!.1DE AT llO C:JST TO CITY Page 2 of 2
D
o
I
i J0 B- 'N,O,
I Zone:
ILOt Sq. Ftg.
1% of lot Coverag~
II # of- Stories
Total Height
Topogrcrphy
,'4"
.,
"00'
- ~
L COG ",
I
1--
I
!
i
I
i
I
!
Occupancu'~.JUP:
I
I ITEM SQ. FTG
Main
GaraGe
Carport
I Accessoru
I
I
TOTAL VALUE
I
S.D.C.
(vc:tue)
1.5 :r
Building Permit
State SUI'charge
Total ChaT'ges
ITEM
Fi:J:tl.fr'es
IResidential (1 bath)
1
! Sanitary Sewer
I Water
I
Plumbing Permi t
State SUI'cr.arge
Total Chc:roes
lITEM
I Res. So. fto.
!New/Extend Circuits
/Temporary Service
I
Ele~trical Permit
State SUI'oharqe
Total Ch=>qes
ITSM
Furnace FTU' S
E::;haust Hood
Vent Fan
i '
I Woodstove
I
Permit Issuance
Meohanicc.l Perrrri t
State SUI'charoe
Total CharGes
-- ENCROACHMENT
Se~dritu Deposit
Storage
I Maintena~e
Permi t
Total Charqes
I Cu:rbcut
I Sidewalk
Fen~e
I Electrical Label
[ Mobi le Home
TOTAL AMOUNT DUE:.t
SOL A P. - C C E S S R E Q.-
NO.
I
12'2'
I
I
NO.
NO.
iJ
LOT TYPE
Interior
Corner
Panhandle
Cul-de-sac
x
Value
FEE
CHARGE I
I
I
I~~t> I
I
I
I~~r
.~I
I*)): 60 I *
FEE
CHARGE
FSE
CHARGE
I
I
I
'I ~~ b 0
Tijpe/Cor.st:
Bedrooms:
Enerau Sources
Heat
Tur:e
I Lot Faces -
I
I P.L.
INorth
lEast
South
West
Setbacks
House I Carage
I
I
Access.
Water Heater
Range
Fireplace
I WoodGtove
II
-- Fees
Building Value & Permit
This permit is granted on the express condition that the said_construction
shall, in all respects, conform to the Ordinance adoFted by the City of
Springfield, incZuding the Zoning Ordinance, regulating the construotion
and use of buildings, and mc.y be suspended or revoked at c:ny time upon vio-
lation of any provisions of said Ordir~nces.
I *
I.
*
Plan Check Fee:
Date Paid:
IRec;;;ipt #:
I Signed:
Plumbing Permit
No person shall construct, install, alter or change any new or e=isting
plumbing or drainage syst~~ in whole or in part, unless such person is the
legal possessor of a valid plumber's license, except tr~t a peT'son may do
plumbing work to property which is ow~ed, leased or operated by the appli-
cant.
Electrica I
Permi t
Where State Law requires tr.at the electrical work be done by an Sle~trical
Contractor, the electrical portion of this permit shall not be valid 'until
the rabel has been signed by the Electrical Contractor.
*
Mechanical Perm,tt
I *
~-~~
,r~iifer~?-/ {r;:'/ r
I HAVE CAREFULLY EXAMINED the completed application for permit, and do
hereby certify that all infoT'mation hereon is true and correct, and I
further certify that any ar.d all work perfoP.T1ed shall be done in acoor-
dance ~th the Ordinc.nces of the City of Springfield, and the L~~s of the
* State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY will be made of any structure without permission of the Building Di-
vision. I further certify that only contraC!tors a;;d e;npbyees who are in.
c~~pliance with ORS 701.055 will be used on this projsct
//-~~o--
lJate
j *
&AA/~.kt
Signed
Date
----
I!-~ ~~~