HomeMy WebLinkAboutPermit Building 1989-8-31
~
.. RE S I QJi N T I A L . .
APPLICA IN/PERMIT
225 North 5th Street
Springfield~Oregon 97477
Building Division
726-3753
.
& II~.. .
SPRINGFIELD
~~
,Job Location:
r4"~ ~ 'C'Q f\ \ \i 0\\\ci \(, . ..,
\ fJ O~:jc0lo4' ~ T= Lot II \ ~5CO
Assessors Map H
Subdivision:
CAJner: ~ ~'X(\_J \\\\~~~
Address: C\, ~~ (\ 0 J"\\ Q j\j, \0 9
CioJ ,?~ ~ Ii J (Qf)
~-~~.
:.fobi le Home ~ ( .'::) \ ' 00 "all"e I.Q{\ "\ cD,
Date of Application ~ ~ ~ ( v' ~ \J ~\;~
Contractors
General
; Plumbing' ; " .
j Hec, han~cal c\_Q 1\ Q() ftl1..A \A\D"\O.5tOO ~L.
IEl~ctrlcal ~'
,SllDE~TV:l.~g Electl~ician
-'
New
Addition
Remodel
Phone: "l4-1- SOlO
Zip: q'1~f\1
1- 0;..- Lf~ ",
v
Describe f.'ork:
Address
Lise. II
Blclrs Hoard Reg.
Phnnp
Rcce':pt fi
Iq-.'} I) I)
\'
"~~~ .
'\)
dJ
Signed:
Date:
~-
cJ.
'. B'd(-B~
l' '.
~XPlr,ps
It is the responsibility of the permit hoUier to see that all inapections are made at the proper time, that each ~ddres8 is readaD~e
from the street, and that the permi t card is located at the front of the property.
'BuiZding Diviaion approved plan shall remain on the Building S1:tc at all times.
PROCEDURE FOR INSPECTION REQUEST:CALL 726-3769 (recorder) state YOUl' City designated job nw;;ber, job adi.rcss, type of inspec::iCli
requested ar.d when you will be ready for inspection, Contractors OJ' OiJners none end phone number. Requests received before 7:00 =
"~ill be made the same day, requests made after 7:00 am will ba made the next :Jorhng day.
,AQ()q\ ~
Reouil'ed InsDl?ct1:ons
SITE INSPECTION: To be made
exoavation, but prier to set
forms.
o
o
after
up of
UNDERSLAB PLUMBING, ELECTRICAL &
MECHANICAL: To be made before any
work is covered.
o
FOOTING & FOUND,1TION: To be made
after trenches are exoavated and
forms are ereoted, but prior to
pouring ccnoret~.
UNDSRGROUND PLUM3TNG, SEWER, W.1TER,
DHAINAGE: To be made prior to fil-
ling trenches.
o
o
o
UNDERFWOR PLUMBING & MECHANICAL:
10 be made prior to installation of
, floor insulation or decking.
POST AND BEAM: To be made prior to
installation of floor insulation or
deoking .
ROUGlI PLUMBING, ELECTRICAL & MECH-
ANICAL: No work is to be covered'
until these inspections have been
made and approved. '
FIREPLACE: Frio l' to placir4 facing
materials and before framing inspec-
tion.
FRAMING: Must be requested after
approval of rough plumbing, electri-
cal & mec7umical. Al! roofing
bracing (1 chimneys" etc. Trr.lst ,be
oompleted. No wOl'k is to be con-
oealed until this inspection has
'been made and approved.
D
D
10
Your City Desigr.ated Job Numba Is:
O INSULATION/V/1POR BARRIER INSPECTION:
, To be made after all insulation and
, required vapor barriers are in place
but before any lath, gypmun beard or
/Jall covel'ing 1:S appl7:ed, and before
any insulation is concealed.'
o
DRYWALl, INSPECTION: To be made
after all drywall is 1:n place,
but prior to any taping.
O MASONRY: Steel location, bond
beams, grouting or verticals in
accordance IJith U. B. C. Sect1:on
2415.
I" I~S1'OVE: After 7:nstalZation is
B ~~;;';leted.
D
CURB & APPROACH APRON: Afte;' forms
are erected but pl,ior to poul'ing
concrete.
, DEMOLITION OR :'-:OVED BUILDINGS
=.J Sani tary seueJ' capped ::It 'p~op;;rtii lir.e
~ Septic tank p:'<'yed and filled with gra;;el
I Final - fl'hen abcve ite..ns are ccmpleted
--1 ar.d when demo li tion is comp lete or s tl'U,>
ture moved al~ premises cleaned up.
Mobile lIemes
D
SIDEf-lALK & DRIl'Ef-lAY: For all con-
crete paving within street right-
of-way, to be made after all exca-
vating complete & form work & sub-
base material in place.
=:J Blocking and Set-~p
=:J Plumbing connections s~er and water
~ Electrical Connection - Blocking, set-up
-.J and plumbing conneotions m-viSt be approved
. before requesting elec'trical inspec'tio::
~ Accessory Building
~ Final - After porches, skirting, decks,
~ etc. are completed.
o
All proJect conditions, lJuch as the i,nstallation of street tl'ees, cO".'1pletion of the
required landscaping, etc., must be satisfied before the BUILDINC FINAL can be raquestad.
D FINAL PLUMBING
D FINAl, MECHANICAL
D FINAL ELECTRICAL'.
~
o
FINAL BUILDING: The Final Building Inspeetion must be requested after the Final Plumbi>L:;
Electrical, and Mechanical InlJpectionr.: have ibeen made and approviJd.
\.
o
PENCE: ~~en complete -- Provide
gates or movable sectiens through
P.U.E.
~AU, MANflO[ES AND CLEANOUTS nUST BE ACCESSIBLF., ADdU8T!1ENT TO BE /,f.1DE /17' NO rOST TO CITY I P:1!:e 1 of .':
l-CO G~
JOB NO.
SOL A RAe C E S S R E Q.-
Type/Const,:
1 Zone:
Occupancy Crou
LOT TYPE '
. -,
Lot Sq. Ftg.
% af lot Caverag~
N of Stories
Total Height
Topography
I ITEM
I SQ. FTC
Main
Gcraae
Carport
Acoessorz;
I
I
TOTAL VALUE
I S.D.C.
( tJa~uc)
1.5 x
Building Permit
State Suroha:rge
Total Cha-:-ges
Interior
Corner
Panhandle
Cul-de-sao
x
Value
I J'l'E.'M
I Fixtures
IResidential (1 bath)
I Sani tory Sewer
NO.
rlater
Plwnbing Perrr:it
State Suroharge
Total Charaes
11'E~1
I Res. Sa. fta.
I Nc;w/Extend Cir'ctdts
Tempora:ry Servioe
, NO. I PEE
I
Ele~trioal Permit
State Sur~ha:rqe
Total Charges
ITSM
NO.
Furnaoe PTU'S
Exhaust Hood
I Vent Fan
I Woodstove I
I
Permit ,Issuano8
Me~hanioal Permit
State Suroharae
Total Charges
-- ENCROACHMENT --
Se~~rity Deposit
Storage
I Maintena~e
Permit
Total Char'qes
eu:rbeut
I Sidewa lk
I Fen~e
I Eleotrical [,abel
I Mobi le Home
i \f ))\ CLl-^ Jrr\
\~ '
I '!'OTAL AMOUNT DUE: *
FEE
CHANG!':
CHARGE
FEE
ClIARCE
\ S ,uU
I
.'~~ '\ I
\ J.L-V
~~
lJ ~~. .-rs
I
I \~SU
I -
60 _~<s I,
.;-.
Bedrooms:
I Lot Faces -
I Setbaoks
I 1'. D. House Car-age
No).th
East
South
t';est
I E.'n8rqy Souroes "
I !leat
Acoess. I Water !leater
I I Range
I I Fireplace
I I Wood3tove
I I
TilDe
Pees
Building Value & Permit
This permit is granted on the express oondition that the said oonstruction
shall, in all respeots, oonform to the Ordinanoe adopted b'y the City of
Springfield, inoluding the Zoning ordinanoe, regulating the oonstruotion
and w:e of buildir/{Js, and m:zy be suspended or revoked at cny time upon vio-
lation of any provisions of said Ordinanoes.
Plan Cheok Pee:
Date Paid:
Reoeipt #:
I Signed:
Plumbing Permit
No person shall oonstruot, install, aZter'or change any new or existing
plumbir/{J Or drainage system in whole or in part, unless suoh person is the
legal possessor of a valid plumber's lioense, exoept that a pe-:-son may do
plumbing work ,to property whioh is owned, leased or operated by the appli-
cant.
1
I *
Electrical
Permi t
Where State /;mJ T'equi!'(!s that the eleotrioal I.Jork be done by an Electrical
Con/;/"ootor', the electrioal pOr'tion of this per'mit shall not be valid until
the Zabel has been signed by the Eleotrioal Contractor.
Mechanical Permit
Plan Examiner
Vate
I HAVE CAREFULLY EXA~INED the oompleted applioation for permit, and do
hereby oer'tify that all info-:-mation hereon is true and oorreot, and I
further oertify that any ar4 all work performed ,shall be done in aocor-
dance with the Ordinanoes of the city of Springfield, and th~ L~~s of the
* State of Oregon pertaining to the work desoribed herein, and that NO OCCU-
PI:f!CY will be made of any struoture without permission of the Building Di-
vision. I further' oertify that only oontr'aetors and ~~plQyees who are in
oa~plianoe with ORS 701.055 will be used on this pr'ojeot
\ cKA~ ~~ ~~J-'81
~ned Date