HomeMy WebLinkAboutPermit Building 1988-6-13
. ~', .:.,"'.:.;.:--_.:........:...h..' _
:""'- .<- ',\
.,...,...
.. RES I c>r- NT I A L . ·
APPLICATION/PERMIT
225 North 5th Street
Springfield, Oregon 97477
Building Division
726-3753
'.1
Job Location: &;;::0 LFh/c6--~/~ ifcv:D ~
Assessors Map # f 7 () 3 ;;L 0 c.f 3 T= Lot # tfJ 0 ~ 0 0
Subdivision:
Ol.mer:ll~';cc..~ H//S?c: t'A"e/Y ~~~
Address: f22c:> ~Fh-7C!:-~/7'r#-C Phone:
City: . ~~D. Zip:
Descr>ibe f{ork:
.;?c:=P#~ ~~e- ~~C-~
t?r' Ve#/CL'd=-.5/ /fV>CT~a~
#/!?P ~Cb-C/r ~ ) r-~C '
~~/5-7::::'5~: Value &7"":7,6). ~...:>.
I
I I
I ~I
I I
Nm!
Addition
Remodel
.'-fobile Home
Date of Application
Receipt .II
III!J I
liD'\
. ~IVV'l
>-.~
V
Signed:
Date:
ce
(/7 ..--! :s - ff
'I:
Contractors Add.~ess Lisc. # Expires
General ~ A"K~~"d)/~- ~2:;r~7'/c ~.#5:y ~h"C-.
Plwnbing. "
Ii, Electrical, ;B ~5 Cc:.-c-=7.
. Mechar.ical.
I COTl8truction Lender
It is the responoibiZity of the permit holder to see that a'Ll. inspections are made at the propel' time, that each ;;dd:ress is readabZ-e
from the street, and that the permit card is located at the front of the property.
*Bui!ding Divi=ion approved plan ,shall remain on the Building sits at all times.
PROCEDURE FOR INSPECTION REQUEST:CALL 726-3769 (recorder) state YOUI' City designated job numbeI', job add:r>ess, type of inspection
requested a~d when you will be ready foI' inspection, Contractors 01' Ol.mers ncme and phone nwnber. Requests received before 7:00 ~
"-'i'Ll. be made the same day, requests made after 7:00 am will be made the next :.JOI'king day." '
Reouiped Insvections
0, SITE INSPECTION: To be made after
excavation, but priOI' to set up of
forms.
0,' UNDERSLAB PLUMBING. ELECTRICAL &
: MECHANICAl,: To be made befoI'e any
work is ~overed.
o
FOOTING & FOUNDATION: To be made
after tI'enches aI'e excavated and
forms are eI'ected, but prioI' to
pouring ccncI'et~.
UNDERGROUND PLUMBING, SEWER, WATER,
DRAINAGE: To be made pI'ioI' to fil-
ling trenches.
[J
0,
D
UNDERFLOOR PLUMBING & MECHANICAL:
To be made pI'ior to installation of
!zoor insulation or decking.
POST AND BEAM: To be made prioI' to
installation of flooI' insulation or
decking. _' ~ ")
ROUGH PLmfBIllGC EiECTRICA~ & MECH-
,ANICAl,: No WOI'k 1.S 1;0 mJ coveI'ed
,until these inspections have been
made and appI'oved. , , .
FIREPLACE: PriOI' to placir{J facing
mateI'ials and before fI'aming inspec-
tion.
ill
o
k FRAMING: Must be I'equested after
~ appI'oval of rough plumbing, electI'i-
,ca~ & mechanical. All. rOOfing
bracing & chimneys, et~. must be
:',completed. No work is to be con-
,~,cealed unti~ this inspection has
~been made and approved.
y:mI' city Desigr.ated Job Numba Is: ~C5 S-/<....
I XI INSULATION/~POR BARR)~R~NSPECTION: 'DEII0UTION OR ;',{OVED BUILDnlGS
To be made afteI' all insulation a-r.d
, " required vapOI' barrieI's are in place, ~ Sanitary se'.JeI' capped a.t p~oper~d
. ,', but befoI'e any lath, gypsum board or ---l
. ' wall covering is applied, and before,
any insulation is concealed.
:q
~
DRYWALL INSPECTION: To be made
afteI' all dr>ywall is in place,
but pI'ioI' to any taping.
O MASONRY: Steel location, bond
beams, grouting or verticals in,
accordance with U.B.C. Section
2415.
D WOODSTOVE: After installation is
completed.
D
CURB & APPROACH APRON: After forms
are erected but pI'ioI' to pouring
con~I'ete.
Phone
~ g-7"'-;~/ ')~s:r
lir.e
:==J Septic tank p~~ed and fi~led with gra~el
---, Final - f>'hen above items are completed
---1 and when demolition is complete OI' struc-
ture moved and premises cleaned up.
Mobile Hemes
D SIDEWALK & DRIVEWAY: For all con-
, crete paving within street right-
of-way, to be made after all exca-
vating 'complete & form work & sub-
" base material in' pla~e;..
"
D
PENCE: h'hen compl~te -- Provide
gates OI' movable sections thI'ough
P.U.E. '
:=J Blocking and Set-up
:=J Plumbing connections sewer and Water
~ ElectI'ical Connection - Blocking, set-up
~ and plumbing connections ~~st be appI'oved
, before requesting electrical inspection
~ Accessol"d Building
---, Final - AfteI' pOI'ches, skiI'ting, decks,
---1 etc. are completed.
o
FINAL PLUMBING
All project conditions, such as the installation of street trees, co~letion of the
required landscaping, etc., must be satisfied befoI'e the BUILDING FINAL can be I'equested.
o
o
f2l
10
FINAL MECHANICAL
\.t~
FINAL ELECTRICAL
\'\
@
FINAL BUILDING: The Final Building Inspection must be requested after the Pinal Plumbing
.El€ctrical,. and Mechar.ical Inspection3 have been made and approved.
o
',~
"''''.
*ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUST!fE..~l'I:JO Bf M.1DE AT NO COST TO CITY I Page 1 of 2
/'
I JOB NQ. "f<&D l)(t/SOLAR ACCESS
I Zone: Occuvancu Gn
Lot Sq. Ftg. LOT TYPE
% of lot Coverage Interior
# of Stories Corner
TotaL H.eight Panhandle
Topography Cul-de-sac
I
lITEM , SQ. FTG X
I Main
I Garaae
Carport
Accessorl/
;{##7?f'
TOTAL VALUE
{value}
S.D.C. 1.5 x
Buil.ding Permit
State Sla'charge
Total Char>ges
lITEM NO., FEE
I Fi::r:tures
ResidentiaL (1 , I
bath)
Sanitary Sewer I
Water I
I
PLwnbing Permi t
State Surcr.arge
Total Charoes
lITEM ' NO. FEE
Res. So. fto.
New/Extend Circuits
I Temporary Service
~S(y~i?
I '
I
El.e~trical Permit
State Sla'charqe
Total Charc:es
ITSM
NO.
Furnace PTU' S
I Exhaust Hood
Vent Fan
Woodstove
Permit Issuance
Mechanical Permit
State Surcharoe
Total. Charoes
-- ENCROACHMENT --
Se~~ritl/ Deposit
I Storage
I Maintena~e
Permit
Total Charoes
Curbcut
Sidewalk
l~eme
I Electrical Label
I Mobile Home
TOTAL AMOUNT DUE: *
Value
g7~
I
70~ ,s--e>1
3. /?I-~
78.23,* '
I
I
l
I
-I'
CHARGE
CHARGE
.:::;?:<---; cr-C'
FEE
r
I
-z:2..-,~ G/ Lt-f
i (~/~ I
'7~,G,1 *
I
I
CllARGE
(07" &',6
_ Pc.ge 2
REQ.-
L-CO G-{t-
I
I
I
I
I
I
I
I
I
T,'!fT?eICor..st:
Bedrooms:
I Enerqy Sources
I I Heat
I I Water Heater
I I Range
I I Firep lace
I I Woodstove
I j
TUDe
I Lot Faces -
I Setbacks
P.L. House Caraqe
!North
East
South
Access.
West
Fees
Building Value & Permit
This permit is granted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning Ordinance, regulating the construction
and use of buildings, and may be suspended or revoked at any time upon vio-
Lation of anyprovi~ions of said Ordinances.
*
"
Plan Check Fee:
Date Paid:
IReceipt#:
I Sig;zed: .
Plumbing
P~rmit
No ,person sha~l construct, inst~Ll" alt?r.or change any new or existing
plwnbing or 'drainage system in'whole or in part, unless such person is the
legal possessor of a valid'plwnber's license, except that'a person may do
plumbing work to property which is owned, Leased or operated by the appLi-
cant. " '
*
Electrical Permit
Where State LCIh1 requires th.at the electrical work be done by an Electrical
Contractor, the electrical portion of this permit shall. not be valid until
the label has been signed by the El.ectricaL Contractor.
Meche nical
Permit
I
, *
I
f
I
r *
~~~
1'i,dn Exam1..ner ' C ~
675*8
vate
I HAVE CAREFULLY EXAMINED the completed application for permit, and do
hereby certify that all info~ation hereon is true and correct, and I
further certify that any ar.d all work performed shall be done in accor-
dance ~th the Ordinances of the City of Springfield, and the L<<~s of the
State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY ~ll be made of any structla'e' without permission of the Building Di-
vision. I further certify that only contractors ar.d ~~l.oyees who are in
compliance with ORS 701.055 will be used on this project
*
---
1$/01//
Date'