HomeMy WebLinkAboutPermit Signage 1988-1-22
ee RESIDENTIAl--
APPLIC, ON/PERMIT
225 Nopth 5th Stpeet
SpringfieZd, Opegon 97477
BuiZding Division
726-3753
Job Location:
~ S I {A.Jed
I r1 (J 3 ~ 7 Lj:J
Assessors Map #
Subdivision:
OlJner:
11/]/]1 /) A"/L~A )-- c'D
C}is- {)a)C
L
?cj (,{~
()
AddPess:
Ci ty :
I NmJ
I Addition
I' Remodel
I Nobile Home
I/~~-i~
Date of Application
Contractors
General
Plumbing
Electrical
Mechar.ic.:zL
Construction Lender
Rece-:.pt it
10 83tr,
(c n_Lc.nn.( c{
T= Lot # 0 S- f 0 [)
Phone:
6 L{-S - 30/2--
Zip:
D"',!be W"k, ~j)
~r~UF
Value
Address
Im~CQ
//) -A-' I
>' Yp/..0! L~ ./
.J 11 U-(),c
(\
'J
.'1 'J
' . ;" !
Signed:
Date:
Cd!b1'9 .
/ J- 2.- ?~(t{
I
Lisc.#
i
Phone
Expires
( "
.--/
It is the responsibility of thB permit hol.der to see that aZZ inspections are made at the proper time, that each ~ess is readabZ-e :
f1'OTTl the street, and that the perrrrit card is located at the front of the property.
*BuiZding Divicion approved plan shaU remain on tha Building site at aU times.
PROCEDURE FOR INSPECTION REQUEST:CALL 726-3769 (recorder) state your City designated job nwnber, job address, type of inzpecticn
requested and when you will be ready for inspection, Contractors 01' OlJners name and phone number. Requests received before 7:00 ~
"->iU be made the scune day, requests made after 7:00 con wiU be made the next ~rking day.
Reauired InsDections
O SITE INSPECTION: To be made after
excavation, but prior to set up of
forms.
I UNDERSLAB PLUMBING, ELECTRICAL &
--1 MECHANICAL: To be made before any
work is covered.
o
FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring concrete.
UNDERGROUND PLUMBING, SEWER, WATER.
DRAINAGE: To be made prior to fil-
Zing trenches.
o
o
D
UNDERFLOOR PLUMBING & MECHANICAL:
To be made prior to installation of
floor insulation 01' decking.
POST AND BEAM: To be made prior to
installation of floor insulation 01'
decking .
ROUGH PLUMBING. ELECTRICAL & MECH-
ANICAL: No work is to be covered
,until these inspections have been
made and approved.
FIREPLACE: Prior to placir.g facing
materials and before frcuning inspec-
tion.
F}vu.1ING: Must be requested after
approval of rough plwnbing, electri-
cal & mechanical. AU rOOfing
bracing & chimneys, etc. rn"~st be
; completed. No work is to be con-
~cealed until this inspection has
~ be~n made and approved.
D
D
D
Your City Designated Job Nwnber Is:
O INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulation ar~
_ required vapor barriers are in place
but before a:ny lath, gypsum board 01'
wU covering is applied, and before
a:ny insulation is concealed.
O DRYWALL INSPECTION: To be made
after aU d:t>ywaZZ is in place,
but prior to any taping.
O MASONRY: Steel location, bond
becuns, grouting 01' verticals in
accordance with U,B.C. Section
2415.
D WOODSTOVE: After installation is
ccmpleted.
o
CURB & APPROACH APRON: After f01'11ls
are erected but prior to pouring
eorwrete.
)?-q()O (/) 0
. DEMOLITION OR ,\fOVED BUILDINGS
:=J Sa:ni tary sC'..Jer capped at p~opcrt-:f Zine
~ Septic ta:nk pumped and filled with gra~el
I Final - f,Then ahove items are completed
~ and when demolition is completel 01' struo-
ture moved and premises cleaned up.
(-
'- ./
Mobile Hemes
~ Blocking and Set-up
~ Plumbing connections s~er and water
~ Electrical Connection - Blocking, set-up
---1 and plumbing connections rn".A.st be approved
before requesting electrical inspection
=:J AecessoI"d Building
I Final - Aftcr parches, skirting, decks,
~ etc. are completcd.
D
FINAL PLUMBING
All project conditions, such as the installation of street trees, c~~letion of the
requil'ed landscaping, etc" must be satisfied before the BUILDING FINAL can be rcquested.
~
ID
o
o
o
FINAL MECHANICAL
o
FINAL BUILDING: The FinaL Building Inspection must be requested after the Final PZumbing
ELectrical, and Mechanical Inspectiona have been made and approved.
FINAL ELECTRICAL
D
SIDEWALK & DRIVEWAY: For aU con-
crete Paving within street right-
of-way, to be made after aU exca-
vating complete & f01'11l work & sub-
base material in place.
*ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUSTHENT TO BE MADE AT NO COST TO CITY Page 1 of 2
D
FENCE: fI'hen compl;;te -- Provide
gates or movable sections through
P.U,E,
. '. .~, .. ....,..-.. ...... ."_"""".,....&..oIO.,"_.-~....-::.~-J(oJ,-"-'~.ol.....,'h.._..JrI,O;L)...:..._,,;.,:.:.~,~1_-.L_:7~~~..~I....::l,,-J..:1o.~;.:.l:'~., 1;..~I,I,~..I.."'=_II"=~-..D.O~t~l"
'-..-.
o
-
- T _..~.:~~ff.::":-~-~11I11;1I1JJ,l
JOB NOS?Kd)Cc::cJ SOLAR ACCESS REQ.-
Zone:
Occupancl/ Group: '
LOT TYPE
Lot Sq. Ftg.
Z of tot (:.:7Verag;;
!I of Stories
TotaL Height
Topography
Interior
Corner
Panhandle
CuL-de-sac
ITEM
. SQ.FTG
x
VaLue
Main
GaPaae
Car'Port
Accessorl/
Is.D.c.
TOTAL VALUE _
(vaLue)
, 1.5 x
BuiLding Permit
State SurchClI'ge
TotaL Cha."ges
ITEM
Fixtures
NO.
FEE
CHARGE
ResidentiaL (1 bath)
/ --3ani tary Sewer
\ ..
-water
PLumbing Pem t
State Surcharge
TotaL Charcres
ITEM NO. FEE
I Res. Sa./'fV;cr.
I New/E~end ~ircui ts
TempJrClI'Y ter>vic4 1/ /' / /
l71:!mh!~~~
CHARGE
~'{J>. (5C)
;, .s a
I 3{.SO *
CHARGE I
I
I
I
I
I
State Surcharqe
Total Charqes
ITEM
NO,
FEE
Furnace ETU' S
( F::::hau.s t Hood
Vent Fan
I Woodstove
I
Permit Issuance
MechanicaL Permit
State SuI'charcre
TotaL Charcres
-- ENCROACHMENT --
Seauritl/ Deposit
Storage
Maintenance
Permit
Tota'l Charges
CUI'baut
SidewaLk
r-F:nce \ lO 9C - 1/ I oC-
I Electriaal LabeL \ llQ r - \\ l ~ C.-_
I Mobil-e Home
I
/00
TOTAL AMOUNT DUE: *
3:) ,so
~.MRL.I"~'~-;;i.. ~..:,,;s.;.'
.- ......~.-_...~...,~~"'-4J'_-.~__ _..>o-l.':O;~'"
L -co G~
Type/Const:
Bed:rooms:
Lot Faces -
1 ,'enerqy Sources
: I Heat
I I
I I
I I
II
Tuve
Setbacks
P.L. I House GClI'aqe
Worth
East
South
West
I Access.
Water !:leater
Range
Fireplace
Woodstove
Fees
Building Value & Permit
This permi t is granted on the express condi tion that the said construction
shaLL, in a'lL respects, conform to the Ordinance adopted by the City of
Springfie'ld, including the Zoning Ordinance, regulating the construction
and use of bui'ldings, and may be suspended 01' revoked at any time upon vic-
Zation of any provisions of said Ordinances.,
*
*
I
P'lan Check Fee:
Date Paid:
IReceipt #:
I Signed:
Plumbing Permit
No person sha'lL construct, insta'll, aLter 01' change any new 01' existing
plumbing 01' drainage system in whoLe 01' in pClI't, unLess such person is the
LegaL possessor of a va 'lid p'lumber's 'license, except that a person may do
pLumbing work to property which is owned, Leased 01' operated by the appli-
cant.
/
I *
Electrical. Permit
Where State LClLJ requires tr.at the eLectricaL work be done by em El.ectrical.
Contractor, the el.ectrical. portion of this permit shal.L r~t be val.id until.
the Zabel. has been signed by the El.ectricaL Contractor.
~
Mechanical Permit
*
PZan Examiner
uate
I HAVE CAREFULLY EXAMINED the compl.eted appZication for permit, and do
hereby certify that al.Z information hereon is true and correct, and I
further certify that any ar.d an work performed shan be done in accor-
dance with the Ordinances of the City of SpringfieZd, and the L~~s of the
* State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY wi7..7.. be made of any structure without permission of the BuiZding Vi-
I vision. I further certify that onLy contractors ar~ ~~'loyees who ClI'e in
I compl.iance with ORS 701.055 wiLL be used on this project
9~
Ci?~~_ ,t?~
\ ,. - ~--
S'Lgn8d
(' -;)c2 ,.?lJ
Date
*
(
.-- ~
-~',,-i~