Loading...
HomeMy WebLinkAboutPermit Building 1999-7-8 .-';\- CO M M ERCIALlI N DUSTRIAL PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 INSPECTION LINE: 726-3769 OFFICE: 726-3759 JOB NUMBER Qtt!f1t::::Js:1: ~':::i ,,. - ...-- LOCATION OF PROPOSED WORK: ~ ~ ~.6;lR:~~ ~~ k/~"p' ASSESSORS ryJAP: / 7-z!!f>?.... Z. "7" /;/'3 TAX LOT: /!) 4-~ .[ OWNER:~'~ ~- _.--r.#'~' PHONE: ~~5"-';:f_?/t:!!:>~,,,!; ,/ !~" ,.1-;; . , .4: '~~ - /' c..4f!;"?1 ADDRESS: _ L::: ,~C~ ~~~~~~~~~/': /?P 'tt'''"3168 4?;-~,-- CITY: ~~~p~!t::::-,,p-,~ STATE: ~/'5. ZIP' 9.?~~/ DESCRIPTION OF WORK: ,(f~~// ~~ ~C ,/~~~7j;C:~-?~~,;7.., NEW.. REMODEL m...'_. ADDITION DEMOLISH _..___,. OTHER, VALUE: .. I CHARGE I I I ~ ( I I I I I I I I I NAME ARCHITECT: CONTRACTOR'S NAME GENERAL: -a~~~. PLUMBING' ADDRESS MECHANICAL: ELECTRICAL: PLUMBING NO. FEE Si ngle Fixt ure Relocated Bldg, (new fix, addli) Water Service ,'A hlY"t? ft. '~San i iary Sewet ft. Storm Sewer ft. Backflow Device UOTICE~ ' THIS PERMIT SHALL EXPIRE 'FTHE'~ORK Au-rHORIZED UNDER THIS F ERMITIr. NO'1 (~OMMENCED OR IS ABANU\ JNI:U rtn TOTAL~'r(Mao DAY PEHIUU. I ADDRESS PHONE I I, Nn I I I I I CONST. cq~rr~~AmN:Oregona~IV~Ft~uires yo UP tro N E folloW rules adopted by the Oregon Utility Notification Cenier. i rHJSe ruies are set Tanh i!l 0.^.~ 95~-901-(1)10 thrl)'.lgh 0AQ QI;?-flfl1- 0090. You may obtain copies of the rules by calling Hie center. (hkil~: tiit:ilelephone f' 'JmlJer f0r !h~ Orl?!}0n 1,Itili41 f\ln!ificcltinn DW.tv:!-3 ~ cno 3C:3 ~Q11). M.!;.CHANICAL I ~~F'-'-;-'r.-~AIiGL Furnace/ burner & vent < 100,000 BTUs____ Furnace/ burner & vent > 100,000 BTUs Floor furnace and'vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap, cooler Vent Fan/Single duct Vent System apart from AC or htg, Mechanical exhaust hood and duct Permit Issuance $10.00 TOTAL PERMIT QUAD AREA' - OFFICE USE - LAND USE'" HANDICAP ACCESS: FLOOD PLAIN: OCCY GROUP: , 1/ OF:STORIES: # OF UNITS: CONSTR. Typi=. HEAT SOURCi=. 1/ OF BLDGS: SQ. FT. SQ. FTG MAIN x SQ. FTG ACCESS x sa. FTG OTHER x PLAN CHECK FEf RCPT# I BUILDING PERMIT -_.,--~"._... .. Y:'l'!....:...., I' ' : State Surcharge MECHANICAL PLUME3IN<;1 . State Surcharae FENCE VALUE $ SIDEWALK CURBCUT , State SurChlHQe I PAVING , $/SO. FT. ZONING' LIGHTING POWER BUDGET: WATER HEATER: VALUE TOTAL. VAL.UE OF PROJECT DATF BY ~.I '.' fLq':;: .~ . I, '74f!!} ~- -..,. DE;MOLlTION I FT. FT. SUBTOTAL PERMITS I SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL I ~y.~ REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all Inspections are made at the proper time. To request an inspection, call 726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the follOwing worle day. SITII IN8PIOTIQNI To 1:1. made after excavation, but prior to setup of forms, UNDERSLAB PLUMBING, mLIl!CTAICAL.Bi '. ,MECHANiCAl::: To be made before any work Is covered. .~ . RQUQH PI.UMEIINQ. ELECTRICAL &. MECHANICAL: No work is to be covered until these inspections have been made and approved, PAVINQI After gravel I. In place but prior to placing asphalt or concrete, FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but . prior to placing concrete. FIREPLACE: Prior to placing facing materials and before framl ng inspection. SPECIAL INSPECTIONS: In accordance S13ctlon 306 of thfj atate Sp~Olfjlty OOOIll a special Inspector shall be employed by the Owner I Contractor d u ri ng construction of the following work. A copy of the special testing reports shall be furnished to the Building Division, ATTIC DRAFT STOPS & CURTAIN WALLS CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, pi pi ng, accessories and other ancillary equipment items are In place but before any concrete is placed. 'FRAMING: To be made afte'r the roof, all framing, fire blocking and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 P,S,I. (306 a.1) STRUCTURAL WELDS: Performed on the job, (2722 f) y UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer~"!Jer)l.nd drainage ,lines. To be made prior to covering or filling trenches, INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering Is applied. HIGH STRENGTH BOLTING: During all bolt installation and tightening operations, (306 a,6) , SPRAYED ON FIREPROOFING: U.B.G. Standards 43.8. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor Insulation, decking or floor sheathing, FIRE & SEPARATION WALL: Located and constructed according to plans. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) POST & BEAM: To be made prior to Installation of floor insulation, decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is In place but before any plastering Is applied or before gypsum board joints and fasteners are taped and fl nlshed. GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U,BG. pTDS. 25-10,11). STRUCTURAL MASONRY: (306 a,7) FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing, SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. "In addition to the inspec- tions specified,' the Building Official may make or require otner inspections of any constr,u~!lon V{ork to ensure compliance with' the Building, City or. ;Dev~lopm,e,nt Code, MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415. ROOF SHEATHING AND' NAILING: Prior to Installing any roof covering, CURB AND APPROACH APRONS: After forms are erected but prior to placing ,:' concrete. FINAL PLUMBING :.' SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection, All project conditions such as landscaping, parking lot striping, etc, must be completed before requesting this Inspection, FINAL ELECTRICAL FINAL MECHANICAL FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises, FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS' PLANS REVIEWED BY DATE= By signature, I state and agree, that I have carefully examined the completed application and do hereby certify thflt all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 .wi!, b~ used on this project. I further agree to ensure that all required in~JJectlons are requested at the proper time, that project address Is readable from the street, that the permit card Is located at the front of the property;,and the approved set of plans will remain on the site at all times during construc~ion. If " Slgnature-A~""",,_ VALIDATION: AMOUNT RECEIVED: c.;~f ~ t:? ~L//6r'7 , ~ ( RECEIPT #: Date M, ~~~/ff~____ ~.tl- ,. DATE PAID: 7~-9~ RECEIVED BY: ~~/....--. L