Loading...
HomeMy WebLinkAboutPermit Building 1994-4-28 CO M M ERCIALlI N DUSTRIAL PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 JOB NUMBER ~Y'&::'6~ INSPECTION LINE: 726-3769 OFFICE: 726,3759 LOCATION OF PROPOSED WORK: -6 5"' / o/~7/ if~;"'~('~~...-:"~ pr.:::V,l/ ~ ASSESSORS MAP: /7-0"3'-2-'::>. V3' TAX LOT:.....t::::2 ~ - - , 7.::?~ y-/?~,F~ ~~~r&A2~ ' 0: /'~/.n~'T' ~.r"7'-'9. . ADDRESS: ~s:/ (AI" ~~/jtIl='~~~ ~ C' y~ . , , CITY' ??~ .STATE:~. PHONE: 7Y? ---57-:--.~ ZIP: 4;)9':77. ,.. . DESCRIPTION OF WORK:~~~~ ~~..........~ ~ /~~ ~..::::-, NEW REMODEL,..Y ADDITION DEMOLISH OTHER VALUE: _~~oa -- NAME ADDRESS PHONE ARCHITECT: CONTRACTOR'S NAME ~ GENERAL: ,/~? PLUMBIW~' ADDRESS CO NST, CONTRACTOR # EXPIRES PHONE MECHANICAL: ELECTRICAL: 7'21Z? I PLUMBING MECHANICAL I NO, . FEE I CHARGI:: Nn ~I=I= r.1-I,ll.Rnl= I Single Fixture Furnace/ burner & vent -< 100,000 BTUs I Relocated Bldg, Furnace/burner & vent (new fix. addtl) >100,000 BTUs I Water Service I Floor furnace and vent ft. I Sanitary Sewer I Suspended wall or floor I ft. mounted unit heater I Storm Sewer I Appliance Vent I ft. separate I I Stationaryevap. I Backflow Device cooler I I Vent Fan/Single I duct I I Vent System apart I' from AC or htg, I I Mechanical exhaust I hood and duct I I I I I Permit Issuance I $10.00 I TOTAL PERMIT TOTAL PERMIT I QUAD AREA: - OFFICE USE - LAND USE: HANDICAP ACCESS: FLOOD PLAIN' ZONING: # OF BLDGS' # OF UNITS: OCCY GROUP: # OF STORIES: CONSTR. TYPE: HEAT SOURCE: LIGHTING POWER BUDGET: WAT.ER HEATER' SQ. FT, $/SQ. FT. VALUE SQ, FTG MAIN x X SQ. FTG ACCESS SQ. FTG OTH ER X TOTAL VALUE OF,PROJECT PLAN CHECK FE!: -:::?~. ~ RCPT# . DATF BY .1 BUILDING PERMIT 15% State Surcharge I MECHANICAL 15% State Su rcharge I PAVING '/~ '5"t? :;?...23 . PLUMBING 5% State Surcharge I FENCE VALUE $ I SIDEWALK, I CURBCUT I D~MOLlTION I ~()TAL . ,I ~~~~ITS - ... I SYSTEMS . DEVELOPMENT I .,..1 7"'Q~ I##.- FT, FT. TOTAL PERMIT FEES EXCLUDING ELECTRICAl 7:::: cC REQUIRED INSPECTIONS It Is the responsibility of the permit holder to see that all.inspectlons are made at the proper time, To request an Inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a,m, will be made the following work day, SITE INSPECTION: To be made after excavation, but prior to setup of forms, x ROUGH PLUMBING, ELECTRICAL & . MECHANICAL: No work is, to be covered until these inspections have been made and approved. PAVING: After gravel is in place but prior to placing as.phalt or concrete, x FIREPLACE: Prior to placing faCing materials and before framing inspection. , FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved, SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special inspector shall be employed ,by the Ownerl Contractor during construction of the fbllowing work, A copy of the special testing reports shall be furnished to the' Building Division, UNDERSLAB PLUMBING, ELECTRICAL & . MECHANICAL: To be made before any work is covered. ATTIC DRAFT STOPS & CURTAIN WALLS FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, ,all steel in place, but prior to placing concrete. STRUCTURAL CONCRETE: In excess of 2500 PS.1. (306 a.1) CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are' In place but before any concrete Is placed, STRUCTURAL WELDS: Performed on the job, (2722 f) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines, To be made prior to covering or filling trenches. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering Is applied. . HIGH STRENGTH BOLTING: During all bolt installation and tightening operations, (306 a,6) SPRAYED ON FIREPROOFING: U,B,C. Standards 43,8, UNDERFLOOR: Plumbing, electrical, mechanical. To be . made prior to Installation of floor insulation, decking or floor sheathing, FIRE & SEPARATION WALL: Located and constructed according to plans. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork, (306 a,11 & Chapter 29) y LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is In place but before any plastering Is applied or before gypsum board joints and fasteners are taped and finished. GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U,B.G, STDS, 25-10,11), POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing. STRUCTURAL MASONRY: (306 an ' FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub.base material in place, ROOF SHEATHING AND NAILING: Prior to Installing any roof coverl ng, CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. *In addition to the inspec. tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code, -----------------------------------------------.-------- y SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date You wish Inspection, All project conditions such as landscaping, parking lot striping, etc, must be completed before requesting this inspection, FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department Inspections are made and approved. No occupancy of the. premises can be made until a Certificate of Occupancy ha;> been issued by the Building Division and posted on the premises, FINAL PLUMBING v FINAL ELECTRICAL FINAL MECHANICAL ;V FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS: PLANS REVIEWED BY 1~//E-?CbCj- ~'DATE '1-2a-~C/ By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information herein Is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordina~ces of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY. will be made of any structure without permission of the Building Safety Division, I further certify that only contractors and employees who are in compliance with ORS 701,055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from,the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. Signature ~ ~/' y Date 0/'-- "2~ ~ cr VALIDATION: AMOUNT RECEIVED: 7?' ~ RECEIPT #: /2 ~3o DATE PAID: RECEIVED BY: t/- 2&-7 Y ~~~