HomeMy WebLinkAboutPermit Fence 1985-8-21
00 R41IDLI.JTIAL 00
APPLICATION/PERMIT
225 North 5th Street
Springfield, Oregon 97477
Building Division
726-3753
i
.
Job Location:
~50 (LJ ~/J1nl&
/'7 03 :;2 7 IfLj T= Lot # ()~C2 00
~s~~
4r;d~~N;J)
S~
IJ '
Assessors Map #
Subdivision:
Oz.mer:
Address:
Ci ty :
/XI Ne1J
I I Addition
I I Remodel
I I Nobile Home
f~ ;;2(- f/)
Date of Application
Contractors
General .13 '1.L~'
Plwnbing
Electrical
Mechar.icd
Construction Lender
A
Phone: /11/7 ?/6:3
zip:
"'C;~ ~
Value
l' 9{lt)~
Address
(~-4,l (/~ ..cJn.JDY\. oAJ
d-- ro5/~c./
I
I
Rece-:pt #
/)~~J~
J V(~
~\\ ,S)
~~,~
Si ~ :21-18~
Signed:
Date:
Lisc.#
Expires
Phone
It is the responsibility of the permit hoLdeI' to see that all inspections are made at the proper time, that each ~ess is readabZe
f!'Om the street, and that the perrrrit card is located at the front of the property.
"Building Divi:;ior: approved plan shaU remain on tha Building Sits at aU times.
PROCEDURE FOR INSPECTION REQUEST:CALL 726-3769 {recorder} state your City designated job number, job aduess, type of inspec;;icn
requested and 1Jhen you 1Jill be ready for inspection, Contractors or Oz.mel"S name and phone nwnber. Requests received befere 7:00 ~
:..'i U be made the scune day, requests made after 7: 00 cun zJi U be made the next =rking day.
Re0!i"'~r! Tn'}pect:':ons
SITE INSPECTION: To be made after
excavation, but prior te set up of
forms.
UNDERSLAB PLUMBING. ELECTRICAL &
'MECHANICAL: To be made before any
work is covered.
o
o
o
FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring concrete:.
UNDERGROUND PLUMBING~ SEWER. WATER,
DRAINAGE: To be made prior to fil-
ling trenches.
CJ
0:
UNDERFLOOR PLUMBING & MECHANICAL:
To be made prior to installation of
!zoor insulation or decking.
POST AND BEAM: To be made prior to
installation of floor ins~lation or
decking .
ROUGH PLUMBING. ELECTRICAL & MECH-
, ANICAL: No 1Jork is to be covered-
,until these inspections have been
made and approved.
FIREPLACE: Prior to placir.g facing
materials and before frcuning inspec-
tion.
I FRAMING: Must be requested after
~ approval of rough plwrhing, electri-
cal & mechanical. AU rOOfing
bracing & chimneys, etc. nr~st be
'completed. No 1Jork is to be con-
',,~,cealed until this inspection has
,~bee.n made and approved.
[]
o
~
Your City Desigr.ated Job Nwnber Is:
D INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulation 11Y'.d
, required vapor barriers are in place
, , but before any lath, gypswn board or
1JCZll covering is applied, and before
any insulation is eoneealed.
~
DRYWALL INSPECTION: To be made
after all drY1Jall is in place,
but prior to any taping.
O MASONRY: Steel location, bond
beams, grouting or verticals in
accordance zJith U.B.C. Section
2415.
D
WOODSTOVE: After installation is
completed.
?S(J P3 /
DEMOLITION OR NOVED BUILDIilGS
:J Sani tary se'.Jer :Japped at px:.opert';j lir.e
~ Septi:J tank p~~ed and filled with gra~el
---, Final - f"hen above items are cCl1TDleted
---l and 1Jhen demolition is eomplete ~r struc-
ture moved and premises :Jleaned up.
. Mobile Homes
D
CURB & APPROACH APRON: After forms
are ereoted but prior to pouring
oonarete.
::J Blocking and Set-up
::J Plumbing conneetions sewer and water
~ Electrieal Connection - Blocking, set-up
~ and plumbing connections nr~st be approved
before requesting electrical inspection
~ AC:Jessory Building
~ Final - After porehes, skirting, decks,
~ etc. are completed.
o
All project conditions, such as the installation of street trees, co~letion of the
required landscaping, etc., must be satisfied before the BUILDING FINAL ean be requested.
:=J FINAL PLUMBING
:=J FINAL MECHANICAL
:=J FINAL ELECTRICAL
~
o
FINAL BUILDING: The Final Building Inspection must be requested after the Pinal Plwnbing
Electrioal, and Mechar.ical Inspections have been made and approved.
D
SIDEWALK & DRIVEWAY: For all eon-
crete paving within street right-
pf-way, to be made after all exca-
vating complete & form work & sub-
base material in plaoe.
"ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUST!fENT TO BE !.!1DE t1T NO COST TO CITY I Page of 2
~ FENCE: h'hen complete -- Provide
~ gates or movable sections through
P.U.E.
o
JOB" No.~Cf?-31
I Zone:
Lot Sq. Ftg.
% of lot Coverag~
#. of Stories
Total Height
Topography
I
lITEM SQ.FTG
I Main
I Ga:foaae
I Carport
Accessorl<
IS.D.C.
TOTAL VALUE
Ival-ue)
1.5 x
Building Permit
State Surchca>ge
Total Charges
lITEM
I Fixtures
Residential (1 bath)
SanitapY Sewer
I Water
Plwnbing Permi t
State Surcr.arge
Total Charoes
lITEM
I Res. So. fto.
I NCJU)/Extend Cireui ts
I Temporca>y Seroice
I
i
I
Ele~trical Permit
State Sur~harr:le
Total Charges
ITEM
F'W'nace PTU' S
Exhaust Hood
Vent Fan
I Woodstove
I
Permit Issuance
Me~hanical Permit
State Surcharoe
Total Charaes
-- ENCROACHMENT --
Se~~rity Deposit
Storage
I Maintena~e
I Permit
Total Charoes
eurbeut
Sidewalk
Fen~e
I Electrical Label
Mobile Home
TOTAL AMOUNT DUE: *
SOLAR Arr:ES~
Oceupancp Grv.
LOT TYPE
Interior
Corner
Panhandle
Cul-de-sac
X Value
NO.
FEE
CHARGE
NO.
FEE
CHARGE
NO.
FEE
CHARGE
1<[. CD
I
I
/ g ,00
Page 2
Q.-
L ~ CO G~
Tiipe/Cor.st:
Bedrooms:
Lot Faces -
I I Ener~~ Sources
I Heat
Access. I Water Heater
I Range
I Fireplace
I Woodstove
I
T1./ve
P.L.
INorth
East
ISouth
IWest
Setbacks
House Garage
Fees
Building Value' & Permit
This permit is granted on the express condition that the said construction
shall. in all respects. conform to the Ordinance adopted by the City of
Springfield. including the Zoning Ordinance. regulating the constrUction
and use of buildings. and may be suspe~ed'or revoked at any time upon vio-
lation of any provisions of said...Ordinances.
*
*
Plan Check Fee:
Date Paid:
Recdpt #:
Signed:
Plumbing Permit
No person' shall construct. instalZ. alter or change any new or existing
plwnbing or drainage system in whole or in part. unless such person is the
legal possessor of a valid plwnber's license. except that a person may do
.plwnbing work to property which is owned. leased or operated by the appli-
aant.
I *
Electrical Permit
Where State Law requires tr~t the electrical work be done by an Electrical
Contractor. the electrical portion of this permit shall not be valid until
the label has been signed by the Electrical Contractor. .
I *
Mechanical Permit
*
I
I
I
r *
I
PLan Examiner
Vate
I HAVE CAREFULLY EXAMINED the completed application for permit. and do
hereby certify that all information hereon is true and correct. and I
further aertify that any ar.d all work performed shall be done in aacor-
danae with the Ordinanaes of the City. of Springfield. and th~ L~~s of the
State of Oregon pertaining to the work de sari bed herein. and that NO OCCU-
PANCY will be made of any struature without permission of the Building Di-
vision. I further aertify that only aontractors and ~~loyees who are in
complianae with ORS 701.055 will be used on this projeat
*
. J/L~~?;-c211S-
~. Date