Loading...
HomeMy WebLinkAboutPermit Electrical 1996-8-19 The following project as submitted has t e 0 oWing zoning. and does not require specific land use approval. Zonina L b {( .7 D!rte~~.q ~ 225 FIFTH STREET SPRINGFIELD, OREGON INSPECTION REQUEST: OFFICE: 726-3759 9 7 ~i7t~orlzed Signature 726-3769 iM 1. L~~~ OMNffJflfL ~ rif~~~~~b~oo ~r::~~~:b~re if work is not started ,wi thil) 180 days of issuance or if work is suspended for 80 days~ ONTRACTOR INSTALLATI700NLY Electri 1 Contractor Address '" ;lne Supervisor Licens~umber Expiration Date ~~ Constr contr.~mber '" EXPiration~te "" . Si~Of Supervising Electri~ Owners Naml>.),\DflSD b (~ D. Addres\Da .~'f. ~ Ci ty ~\()J~~ Phone Q33. J'ld1) City OVNER INSTALLATION The installation is being made on property I own which is not intended for sale, lease or rent. Owners Signature: ------------------0-------------------- DATE: 9\ ~r.ro -~l(~ RECEIPT #:'" ~z...1_~' q q RECEIVED BY: \~., , ELECTRICAL PERMIT APPLICATION City Job Number gkD~?- \ 3. COMPLETE FEE SCHEDULE BELO\l A. New Residential-Single or Multi-Family per dwelling unit. Service Included: Items Cost Sum 1000 sq. ft. or less Each additional 500 sq. ft or portion thereof Each Manuf'd Home or Modular Dwelling Service or Feeder $ 85.00 $ 15.00 $ 40.00 B. Services or Feeders Installation, Alterations or Relocation: 200 amps or less 201 amps to 400 amps 401 amps to 600 amps 601 amps to 1000 amps Over 1000 amps/volts Reconnect Only $ 50.00 $ 60.00 $100.00 $130;00 $300.00 $ 40.00 C. Temporary Services or Feeders Installation, Alteration or Relocation 200 amp's' 'or less ($ 40.00 40 201 amps to 400 amps $ 55.00 Over 401 to 600 amps $ 80.00 Over 600 amps or 1000 volts see "B" above Branch Circuits " New, Alteration or Extension Per Panel One Circuit Each Additional Circuit or with Service or Feeder P~rmit $ 35.00 $ 2.00 E. Miscellaneous (Service/feeder -Each installation Pump or irrigation Sign/Outline Lighting Limited Energy/Res Limited Energy/Comm not included) 5. $ $ $ $ 36.00 4D-~ riJ - UU ~r rO n.. <r7.-1" .:J..[ } 40.00 40.00 20.00 SUBTOTAL OF ABOVE 5% State Surcharge 3% Administr~tive Fee TOTAL .