To: Bob Barnhart, City of Sp~ngfleld From: Michael Remboldt, P.E,
fax: 726-3676 c:.c:.... C;~AJ Pages: 6
Subject Geotech. report -.3479 Ambleside Dr.. Dale: 12129104
Attached Is the geotechnical report for the RIVer Va/ley Builders Inc. project at 34 79 Ambleslde Drive Please call W you .
have any questions.
Michael Remboldt, P.E.
K & A Engineering, Inc.
. Dec-29-2004 02:08pm From-K & A Eniineerini. Inc.
+541-684-9358
T-854 P.002/006 F-035
Community Services Div. Building SllfelY
CITY OF SPRINGFIELD, OREGON
225 5th Street, Sflriilgfi~ld, OR 97477 Ph. 726-3759
JobAddress 3479 Arnbleside Drive
City Job # _ C0f'12.QQ4-01445
AMBLESIDE MEADOWS SUBDIVISION-1sT ADDII10N
Site Investigation Questionnaire for Consulting Design Professionals.
foundation requirements - new structures on residential lots
This fonn may be used as a temporary verification to ~ow construction to continue.
OD the Job site until the consultant's stamped affidavit-en the site soU compaction
and stabllization is submltted to the City. This form must be completed by a
licensed design professional (engineer or architect) or hlSlher authorized employee,
and submitted to the buDding inspector prior to requesting City inspections or
placing foundation concrete. It is important that aD questions be answered
completely'for the foundation site to be approved for construction.
Owner and/or Contractor Ri ver Valley Bui 1 ders
1. Date of the design professlonal;s site evaluatJon? '2/'7/2004
2. Has the design pr()fessional reviewed a copy of the geotechnieallnfOrmatioD
for the subdivision that was pro\fided with the building pennit? Yes.,lL No_
If not, please contact this office for a copy of the report. The design professional
must be familiar with the geotechnical information before completing this form.
3. What was the size and depth oUbe excavation and/or fiD? The overall pl an
size of the excavation is approximately 60' x 70'. The excavat1o.n
\Alas made in three benches. lne aeepest CUt \a aaYllgl1t garage)lS
alJfJrOXlalIlI..~IYIU-rtHH. ill IItd!lfl~ d~ ~iH~ LrH.k(~uu~I" 3JJt;;. All "~!J'" bench
-LI,Ql Wll1fJ3 01 UUIIJ Lilt;; 3l"lulll~ r::o"L~ (,I,11';;.V~st ~{.j@3 of "tl'le :.:JJ."f;;~t
-i"C:i;:;a ir. se~tA f:-:lf. 1. 7~. :'H-~: !19A~ tRe S()ll~h ~~g~_
Was existing non-structural fill or expansive soil encountered on the lot?
Yes_ No,L If uyes''t what types. depths and locations?
What measures were taken to remedy the soil condition (include type of
engineered fill used to stabilize the soiD? "50il S II at th is site conS i sted 0 f
a-proximately 1 to 2-feet of black ornan1c S1tlY topsO'1 over tan/brown
deco~posed ana weatnerea turraceous S1itstOne. jn~ ciecom~u~~~ ~l'tstone
i~ nUHd:;"dU.Y 111((33;...1; dllJ IICl~ Cl 11;~';i JI:;;:~ICC ...~ ...vl.'(,;.);VII. fll"l,ue(\.)ures
were necessary for stabilization.
1
Dec-29-2004 02:08pm From-K & A Eniineerini, Inc.
+541-684-9358
T-854 P. 003/006 F-035
Community Services Div, Building Slltcty
CITY OF SPRINGFIELD~ OREGON
22:; Sib Street, Springlidu, OR 97477 Ph. 726-3759
Job Addre~~ 3470 Ambles i de Dr1 ve
City Job # COM2QQ4-0l4ilS
JIDl'F' The cuts maLbe le.ft stan.dirlC'I in ~ cr'a~i?~c~. Wi'tMLJt l7e.t~tntn9
wa l1s i'f footin~s' are. not pl aced closer to. the uns'uppprted cut face. than
tne ne10nt Of the cut. t1e. s'nou I d be con.tacted to pronae. spe.crrrc'
r.~t;omrnenaati,oTllj. Tor root1 ng oearin'j ana paceJIJeJrc 011, ~i1e' uppe.r oem::he.s
L1".l U I.. (l,JJ O'...~lIl Lv 1,I11.~U:Jl"\;I i LcJ ........l,;).
Is the site as prepared adequate !XI inadequate 0 to maintain constant moisture
content in the sub grade? Note: Verification of moisture stabilization in the sub
grade is a requirement of the geotechnical report, and must be affirmed before
construction can continue.
If inadequate, what measures are needed to provide constant rnois~re content in
the sub grade? r1O.Tr. tn~j; th~ r1~rn~pMj:>rf ~ i1 t~.tnlJf ba~'
Ii low Dote.nUa 1 for. he.avi no i f qrmm~r is ; ntel7ceoted and carr1 e.d qff
site. . .
Is the site as prepared adequate..~ inadequate 0 to support the proposed ,
strocture? An affirmative answer is requisite to proceeding with construction.
If inadequate, what additional work Is needed to provide adequate
foundatioD support?, . ~~OTE our'recommenda t 1 ons (Fl bove 1 for
footinrJs adjacent to unslJoDorted cuts< '
4. Did the design professional witness ,placement and compaction of the
engineered fill, or Is there a speclal inspection report forthcoming from a
qualified agency? I witnessed Placement ~ Speciallnsp/compaction report 0
Fi 11 cons; ste.d of 3-1 nch l.?pen-graded crus.he.d quarry stone,. .
5_ The desilA~ionallntends to use the following method for installation
or perforated perimeter footing drains:
The design on the attached drawing provided by the design professional ...... 0
The method shown on the original construction drawings......................... 0
The typical iFoundation Drain' drawing attached to permit..... .......... .,..... EI
Perforated perimeter drains are not required .......... .. .. . .. . .. , .. .. .. . .. . .. . ..... 0
Comments:
We witnessed a perimeter drain i.nstalled att.he bas;e of.th~.qlJarry stone..
-rtll 1n tne g~raae. cut. vur unae,rs.tanalng rs mat .tne contractor i.ntends'
~v :1I::lLo.11 1;\ ~o::.t,.,v"Jc:dY'1~uudr\U Jntltl a~ lll~'ruutlt.iij 'It":!.tji:!i. Lti:~hou'd be.
Jgl~~.ricU i:;;:~~r;~irl !J;~~rlJ~~~ll;d'atafnsuprior to ~(;~e;up~n~reqLuest.~....
Call: 726-3769 to schedule inspection.
2
Dec-29-2004 02:09pm From-K & A Enaineerins, Inc.
+541-684-9358
T-854 P.004/006 F-035
Community Services Div, Building Safety
CITY OF SPRINGFIELD, OREGON
2255'" Street, Springfield. OR 97477 Ph. 726-3759
Job Address
City Job t
3479 Ambleside Drive
COM2004..0l445
Low~point crawl space drains are requlredto prevent the build-up of excess
moisture Inside the foundations during (and after) construction. This drain
may be IliBtalled after foundation placement glv with the exoress nennlulon
or the 4Bn orofesslonaL
a. The design professional has detennined the following:
The crawl space drain is required when the foundation is installed..... 0
The low-point drain can be installed after foundation placement without a
significant moisture build~up problem within thefoundation............. 0
(The low-point drain may be installed at the frami np stage
of construction) poll & beu""jtrlmJng, rooflng, flc.
b. Has the design professional observed and approved the installation of the
required low point drain?................................... Yes, No xx
if ''yes'', where is the low point drain locateduruler the building and
where does it.terminate at this time? (must be an approved location, i.e.
street gutter, storm sewer, sump pump and discharge line to the street,
etc.) .
The design professional must determine whether the ll-'l-'<'vved pennit drawings have
adequate foundation steel. Is any additional foundatlou steel required that is not
shown on the foundation'drawlngs for the building?
Yes No xx . If "yes", describe additional steel required (or provide drawing).
The following statement must be signed by the individual doing the observations and
providing direction for the excavation and site preparation work on the property.
3
Dec-29-2004 02:09pm. From-K & A Enaineerini, Inc.
+541-684-9358
T-854 P.005/006 F-035
Community Services Div, Building Safc::ty
CITY OF SPRINGFIELD, OREGON
225 Slh SlrcC::l, Springtleld. OR 97477 Ph. 726-3759
Job Address
City lob #
3479 Ambleside Orive
(;0:'1~ur14-a.ll~4b
TIu undersigned design professional (or authorl:.ed employee) attests that helshe
observed requ.ired moisture stability pracedu,.,s on this aite, and thot such procedures
were accomplished before any changes occurred in the moisture content ofOu sub-
grade underlJnd around the building (where expallSive lOUS were encountered). The
undersigned furiher attests that the sub-grade, as prepared, Is adequate to support the
building proposed for this site. .
Additional comments:
(Note): A copy of this report shall be kept on site with the approved plans at all
times.
This report shall be followed by an affidavit, signed and stamped by the design
professional under whose auspices this report was completed. affIrming the information
herein. The signed/stamped affidavit together with a copy of this report shall be
submitted to this office prior to requesting framing inspection for the building.
Slgnature~~ -
NamerHchael Remboldt
CompanyK & A Engine.e.ri.ng,
Phone 684-9399
..--
_ Title p~; ncir.llUnc1i'neer
t.ne.
Licensee M1'chaal Rembol dt
Ucensa #. 19.4]4
expires 12(3) /,200A
The geotechnical report for the Ambleside Meadows - 1$1 Addition Subdivision
recommends immediate moisture stabilization of exposed expansive sub.grade8t and that
expansive soils be over~excavated and replaced with at least 12 inches of f1l1 compacted
to at least 95% of ASTM 0698 for foundation preparation. The report also recommends
that measures be taken to prevent water from collecting in or around the foundation areas
during and after the construction process, and that positive site drainage be provided to
reduce the infiltration of surface water into the expansive soils. .
The geotechnical report furtber emphasizes that the fInish grade of landscape soil
adjacent to the foundation should be at least 24" above tbe expansive bearing soils, fmnlv
com12JCted to reduce the ~nfiltration of water at the surface. The adequacy of fill soil
material around the building must be verified to the satisfaction of the design
professional. .
4
. . Dec-29-2004 02:09pm From-K & A Eniineerini, Inc.
+541-684-9358
T-854 P.006/006 F-035
Community Services Div. Building Safety
CITY OF SPRINGFIELD. OREGON ,
225 5th Street, Springfield. OR 97477 Ph. 72.6-3759
lob Address
City Job"
3479 Ambleside Drive
Com004",U 14tH)
SPRINGFIELiiij-
WiL-
Affidavit
For Site Investigation Questionnaire
Foundation Sub-Grade Approval for
Residential Building Site in Ambleside Meadows - 1 st Addition
, Subdivision
The undersigned hereby affirms that the excavation, structural fill and moisture
stabilization methods for the building site at the address shown above was observed by
me or an authorized employee of my finn and that the following is troe:
1. The foundation sub-grade is capable of supporting a minimum of 1500 psf, and is
adequate to support the building proposed for this site.
2. The moisture content of the excavation was adequately maintained during the site
preparation process and waS adeqpately covered to stabilized moisture content
prior to any significant change in moisture content of the sub-grade. .
3. The site is adequately graded and drained to prevent the collection of water in the
excavated area during construction.
4. The accompanying report .titled "Site Investigation Questionnaire for Consulting
Design Professionals'~ containing field observations and instructions made on
lJecember 17. 2004 (date) for the building site was completed either by
myself or by an employee of my finn under my supervision. To the best of my
knowledge, the information contained in that report is complete and accurate. .
Name of Licensed Professional (print) r1i chae 1 Rembo 1 dt. P. E.
Date ]2129/2004
Signature~ ~