Loading...
HomeMy WebLinkAboutPermit Building 2003-5-28 MaY-Z8~Z003 09:03am From-K & A Enain88rina, Inc. +541-684-9358 T-ZOl P.OOI/006 F-044 a tnginel'rlng , K I A Engineering, Inc. P.O. Box 23824, Eugene, OR 97402 521 Market St., SUite I, Eugene, OR 97402 . (641) 684-1399 Voice .. (541) 884-9358 FAX May 28, 2003 Fax 10: Bob Barnhart, City of Springfield From: Michael Remboldt, P.E. ~. Fax; 72a.388r ?~ 7 {:;, _ PIg.: 6 8UbJect:~h.report.:,2299~'0 Date: 512812003 Attached ~ ~~ River Valley Builders 100; project In Ambleside. -Please call if you hav~ any . questions. J ~ Michael Rambo/dt, P.E. K & A Engineering, Inc. c~~~~ .../ '. ~ . J' May-28-2003' 09:03am From-K& A Eniineerini, Inc. +541-684-9358 T-201 P.002/006 F-044 ( Community Services Div, Building Safety CITY OF SPRINGFIELD, OREGON 225 51h Street, Springlidd, OR 97477 Ph. 726-3759 lob AddresS 2299 37th St. City Job ## COM 2003-00228 '> AMBLESIDE MEADOWS SUBDMSION-tST ADDITION I Site Investigation Questionnaire for CODSulting Design Professionals foundation requirements - new structures on residential lots I . ~ . This form may be uSed 8S8 temporary verifJcatJoD t~~~w (oBStrudion to continue . .""~~'" on the job site until the consultant's stamped aft1davif 9,D the site soU compaction aJ;ld stabiliZation is submitted to the City. This form milstbe completed by a licensed design professional (engineer or architect) or hlslher authOrized. employee, and submitted to the btailding inspeet9rprior to req~estlng City Inspections or placlog foundation concrete. It is important that all qUe.sUODS be aDSWered completely'for the foundation site to be approved for constnlttion. Owner and/or Contractor River Va 11 eYBul1ders. Inc., 1. Date of the design professionaJts site evaluation? 511/03 2. Has the desigD professional reviewed a copy of the geotecbnical information for the subdivisIon that was provIded with the building p....lI.Jt? YeS,L,No_ q not, please contaCt this office for a copy of the 'report. The design professional must be familiar with the geotechnical information before completing this form.. 3. What was the she and depth of the ~cavatfon and lor fill? E/C.cayation for house and a qarage co~!hte?of two terraces The lower terrace was approxlmahly >t.'. x. 33' w'ltn aep,tn or ex"; cavatlon ranging trom, to o.o-ree". Irta id~il~(' ~1::Hnl~l: I"ICI~ apprOXlmatelY j~ ^ :)~- wi~il ut:~LI, v; I,.ub HI"~;."l:f :-,\,,,,. 11;" C.~-feet. . I .' Was existing non-structural fill or expansive soil encountered on the lot? Yes_ No~ H c'yes", what types. depths and locations? What measures were taken to remedy the soil condition (inc1udetype of engineered fill used to stabilize the soil)? no soecifi ~ mit i oati on for -..lJn~uHable soil s ware recui red. 1 May-Z8-Z003 09:03am From-K & A Eniineerina, Inc. +541-684-9358 T-ZOI P.003/006 F-044 Community S~rvices Div, Building SllfC:lY CITY OF SPRINGFIELD, OREGON 225 Sin Street, Sf'lringti~ld. OR 97477 I>h. 726-3759 Job Address 2299 37th St. City Job N COM 2003-00228 Note.that perforated perimete~ footing d~~inc w~rc ~n~+4llet to i'nte-rcePt' groundwater in both terraceS-. .. 5-inchopen quarry rock and some crushed aCJqre~ate was used to con~rOI rlnal qraae and aSslst w1th drainage of foundation. Is the site as 1"4 "l"ared adequate Ii] inadequate 0 to maintain constant moisture content in the sub grade? Note: Verification of moisture stabilization in the sUb grade is a requirement o/the geotechnical report, and must be aJfi~d before construction clm continue. If inadequate, what measures are needed to provide constant moisture content in the sub grade? J Is the site as prepared adequate GJ inadequate 0 to support the p4~t'''sed structure? An affirmative Q1lSWer is requisite to proceeding with construction. If inadequate, what additional work Is needed to provide adequate foundation supp~rt? ( . 4. Did the design professional witness placement and compaction of the engineered fill, or Is there a spedal inspection .11. ....' ,.rt forth....ll.dng from a qualified agency? 1 witnessed Placement .(! Special /n~pkompactlon report 0 There was not "engineered" fin at this site 5. The design protessionalintends to use the roUowlng method tor Installation of perforated perimeter footing drains: The design on the attached drawing provided by the de~ign professional ...... 0 The method shown on the original construction drawings......................... 0 The typical 'Foundation Drain' drawing attached to pennit ..................... [iJ Perforated perimeter drai~s are not required..... ......................... ..... .... 0 Comments: Some qroundwaterwas noted se~ning Qpf:"''' th.e...n.n~thel'ct ~idll nf the excavatHm~ As noted above, complete J?erimeter"footino drains were ln~ta lfea ana routed to day1ight downhi 11 of .the structure. ~ Note: City inspectors will inspect installed drains prior to cover upon request... Call: 726-"3769 to scheduk inspection. r 2 May-2B-2003 09:04am' From-K & A En,ineerin" Inc. +541-684-9358 T-201 P.004/006 F-044 Community Serviceli Div, Building Safety \, CITY OF SPRINGFIELD, O~EGON 225 Sill Slrc~t, Sl'ringfield, OR 97477 Ph. 726-]759 lob AddresS 2299 37th St. City Job ## COM 2003-00228 Low-point crawl space drains are required to prevent the build-up of excess moisture inside the foundations during (and after) construCtIon. This drain may be installed after foundation placement only with the express a."" ""Jssion of the desip. Dmfessio~l. - a. The design professional has determined the following; The crawl space drain is required when thefoundati01l is installed..... 0 The low-point drain can be installed after foundation placement without a significant moisture build-up problem within thefoundation............. ~ (The lQw-point drain may be installed at the framing .ftage of construction) past ci beam. ftomlng, roofing. <<c. b. Has the design professional observed and approved the installation o/the required low point drain?,... ......... ... .................. Yes, No xx if "yes'~, where is the low point drain located under the building and , where does it,te.rmmate at this time? (must be an approved location, i.e. street gutter, storm sewer, sump pump and discharge line 10 the street, etc.) The design professional must determine whether the "-!,,)U,,ved permit drawings have adequate foundation steel. Is any additional foundation steel required that is not shown on the foundation drawings tor the building? Yes No..n...... [["yes", describe adf!itional steel required (or pruvide drawing). The following statement must be signed by the individual doing the observations ant! providing direction for the excavation and site preparation work on the property. 3 MaY-Z8-Z003 09:04am From-K & A Engineerin.. Inc. +541-684-9358 T-Z01 P.005/006 F~044 Community Services Di\l, Building Sllftlty Job ,Address 229937th St. CITY OF SPRINGFIELD, OREGON City Job (# COM 2003-00228 225 5th SLrccl, Springfield, OR 97477 Ph. 726~3759 The undenigned design pro/essiolial (or suthorized employee) attests tIuU helshe observed required moisture stability procedures on this lite, and tlrtlt slICh procetlum were accomplished be/ore any changes occurred in the moisture content of the Suja grade "nder and tJ1'ountl the building (where uptmStve solis w6I'e encountered). The urukrsignetlJurtlaer attests tJuzt tlae ,ub-grade, (JI prepared, is aMqupte /() '''pport the buil4ing propoged for thu site. Additional comments: '-J (Note): A copy of this report sbaJJ be kept on site 'fith the approved plans at all times. This repon shall be followed by an affidavit, signed lUld stamped by the design professional under whose auspices this report was completed, affirming the information herein. The signed/stamped affidavit together 'with a copy of this report shall be submitted to .this office prior to requesting framing inspection fo~ the building. Slgnature- ~... ~.~ .... - Name Michael Rembold! Title President. Prindple fnaine~r <:oD1pa~y K .& A Engineering! Inc. Phone .684..9399 LicenseeM~rhA.l D.m~nlnr License #I 9474 expires 17/11/Q/1 ~ . The geotechtrlcal report.for the Amblcside Meadows - 1 st Addition Subdivision recommends immediate moisture stabilization of exposed expansive sub-grades, and that expansive soils be qver-excavated and replaced with at least 12 inches of fill compacted to at least 95% of ASTM D698 for foundation preparation. The report also recommends that measures be taken to prevent water ~.~&U collecting in or around the foUndation areas during and ~fter the construction process, and that positive site drainage be provided to reduce the infiltration of surface water into the .expansive soils. The geotechnical. report further emphasizes that the finish grade of landscape soil adjacent to the foundation should be at least 24" above the expansive bearing soils, fi~ comDacted to reduce the infiltration of water at the surface. The adequacy of fill soil material around the building must be verified to the satisfaction of the design professional. 4 May-28-2003 09:05am From-K & A Eniineerini, Inc. +541-684-9358 T-201 P.006/006 F-044' Community Services Div, Building Safety L11 i OF SPRINGFIELD, OREGON 2255'" Strec(, Springfield, OR 97477 Ph. 726.3759 Job Address ~299 37th St. City Job #.coM 2003-00228 Affidavit For Site Investigation Questionnaire Foundation Sub-Grade Approval for Residential Building Site in Ambleside Meadows - 1 st Addition Subdivision The undersigned hereby affirms that the excavation, structural fill and moisture stabilization methods for the building site at the address shown above was observed by me or an authorized employee of my fmn and that the following is tme: 1. The foundation sub-grade is capable of supporting a minimum of 1500 psf. and is adequate to support the building proposed for this site. 2. The moisture content of the excavation was adequately maintained during the site prep~tion process and was adequately covered to stabilized moisture content prior to any significant change in moisture content of the sub-grade. 3. The site is adequately graded and draiIied to prevent the collection of water in the excavated area during cohst:rUction. 4. The ac~mpanying ~"t'urt titled "Site Investigation Questionnaire for Consulting Design Professionals'; containing field observations and instructions made on ~1av 1. 2003 (date) for the building site was ~""""l'leted either by myself or by an employee of my fmn under my supervision. To the best of my knowledge, the information cOIJ.tained in that report is complete and accurate. N2lD1C of licensed Professional (print) Mi chae 1 Rembo 1 dt Signatu~~ .--(. . Date-illB/03 EXPlRES:~~(~ -