Loading...
HomeMy WebLinkAboutPermit Building 2002-8-15 "'"' .. 'V" ,( \ Lt e ~~ ,~ \ Community Services Div, Building Safety CITY OF SPRINGFIELD, OREGON 225 5th Street, Springfield, OR 97477 Ph. 726-3759 - Job Address City Job # ~~1 \ D ~ f {2..trr, " .,' ..... .. ';'" ,'?, '_ .'~' : i .' t,~"",,:,"'f;""'..' "f'~"; ,~.'~ ' I; . ~l"', :-} ~ ",';. ,~~ ~/ "''J~''~. 1,'- ._ .:.:.;; ~.\ :-'~;:1 > ,. ; ~:. ,:~; ~~ : ~ '}'." "'..' ' AMBLESIDE MEADOWS SUBDIVISION-1ST ADDITION , - Site Investigation Questionnaire for Consulting Design Professionals foundation requirements - new structures on residential lots This form may be used as a temporary verification to 'allow construction to continue on the job site until the consultant's stamped affidavit on the site soil compaction ' and stabilization is submitted to the City. This form must be completed by a licensed design professional (engineer or architect) or hislher authorized employee, , and submitted to the building inspector prior totequesting City inspections or ' placing foundation concrete. It is important that allquesdonS be answered completely for the fowidation site ~ be approved for construction. Owner and/or Contractor c...t::J z. YH oM' ~ 1. Date of the design professional's site evaluation? e, ,'? \ D~ ' 2.' Has the design professional reviewed a copy of the geotechnical information - fo~the subdivision that was provided with the building permit? Yes)(No_ , - If not, please contact this office for a copy of the report. The design professional must be familiar with the geotechnical info.nnation before completing this form., " , , , , , 3. What was the size and depth of the excavation and lor fill? '1: 1.. oot) ~ NA...,.'O '~p11f ~ ~ '- 0 l\ . ~ . .'. . , Was existing non-structural fill or expansive soil encountered on tlie lot? Yes.ANo_ !f"yes'\ what types, depths and locations? F=\I..~ \S'NtAUI'\T",e-D e. ,'^,t?-'bl J.c~O ~oQ..~w~ 1> f) a"n~t1 ~ . , What measures were taken to remedy the soil condition (include type of engineered fIll used to stabJ)ize the soil)?' '(Z.e..vaoue1:> FLu...-- \'\~.6.URO l\I'Z. ~\'''1v''':) (.~~\'t~ .l2o~. ~'1.Y ~\'l DEfpn\. 1 . .~, f; Community Services .Div, Building Safety . CITY OF SPRINGFIELD, OREGON 225 5th Street, Springfield, OR 97477 Ph; 726-3759 Job Address City Job # ??'1 , ~r~ . .' Is the site as prepared adequate I){ inadequate 0 to maintain constant moisture content in the sub grade? Note: Verification of moisture stabilization in the sub grade is a requirement of the geotechnical report, and must be affirmed before construction can continue. If inadequate, what measures are needed to providC? constant moisture content in the sub grade?' , , Is the. site as prepared adequate I&J inadequate 0 to support the propos~d structure? An affinnative answer is requisite to proceeding with construction. If inadequate, what additional work is ileeded to provide adequate foundation support? 4. Did the design professional witness placement and compaction of the engineered rIli, or is there a special inSpection report forthcoming from a ., qualified agency?! witnessed Placement 0 Special Insp/compaction report 1& . 5. The design professional intends to use the following ~ethod for installation. ' of perforated perimeter footing drains: ' The design on the attached drawing provided by the design professional ...... 0 The method shown on the onginal constrUction drawings...... ........ ;.. ........ 0 The typical 'Foundation Drain' drawing attached to permit ...................~. E- Perforated perimeter drains are Iiotrequired ........;........;..................... D Connnen~: ' , Note: City inspectors will inspect installed drains prior to cover upon request... Call: 726-3769 to schedule inspection. 2 , , Community Services Div. Building Safety CITY OF SPRINGFIELD, OREGON 225 5th street, Springfield. OR 97477 Ph. 726-3759 Job Address City Job # ~c;11 '-0 ~ ptttr1 Low-point crawl space drains are required to prevent the build-up of excess moisture inside the foundations during (and after) construction.' This drain may be installed after foundation placement onlv with the exoress oennission of the desim orofessional. '. ' a. The design professiomil has determined the following~' The crawl space drain is required when the foundation is installed.:... [1 The low-point drain can be installed after foundation placement without a significant moisture build-up problem within 'thefou1idation...........~. .18 (The low-point drai~ may be installed at the ftf.A./"\ \ ~ stage of construction)' post & beam, framing. roofing. etc. b. Has the design professional observed and approved the installation of the required low point drain?................................... Yes, No-25:.... if "yes", where is the low point drain located under the building and where does it terminate. at this time? (must be an approved location, i.e. street gutter, storm sewer, sump pUmp and discharge line to the street, e~) , , The design professional must determine whether the approved permit drawings have adequate foundation steel. Is any additional foundation steel required that is not shown on the foundation drawings for the building? , ,Yes' No. .X. If "yes", describe additional steel required (or provide drawing). The following statement must be signed by' the individual doing the observations and providing di~ection for the excavation and site preparation work on the property. 3 Community Services Div, Building Safety Job Address "-'~ '11 CITY OF SPRINGFIELD, OREGON City Job # 225 5th Street, Springfield, OR 97477 Ph. 726-3759 t?&PP~, The undersigned design professional (or authorized employee) attests that he/she observed required moisture stability procedureso.n this site, and that such procedures were accomplished before any changes occurred in the moisture content of the sub- grade under and around the building (where expansive soils were encountered). The undersigned fUrther attests that the sub-grade" as prepared, is adequate to support the building proposed for this site. Additional comments: (Note): A copy of this report shall be kept on site with the approved plans at all times. This report shall be followed by an affidavit, signed and stamped by the design profession8.I under whose auspices this report was completed, affirming the information herein. The signed/stamped affidavit together with a copy of this report shall be submitted to this office prior to requesting framing inspection fot the building. Signature ?\.~~ R-'~l<t. ~ Name ~L~ \L~\.hfr()"" Title Bl'\t.'" ~ ~1I](.... ....f:Ot>~l~~' Companv \10(2..'1' U;;-e... B ~ Co I. '1 Il::$ b'F-\"~ Phone (Pf:; 't - ~.;, ~ ~ Licensee License # ? ~M 6 L-/A.. ':> '4 ~ z.z, '~ - l-::-\ ll\.I::>'t l2- DM . P ~ expires \?e. wJ?JO J 0' I t , The geotechnical report for the Ambleside Meadows - 1st Addition Subdivision , recommends immediate moisture stabilization ,of exposed expansive sub-grades, and that expansive soils be over-excavated and replaced with at least 12 inches offill compacted to at least 95% of ASTM 1?698 for foundation preparation. The report also recommends' that measures be taken to prevent water from collecting in or around the foundation areas during and after the construction process, and that positive site drainage be provided to ' reduce the infiltration of surface water into the expansive soils. The geotechnical report further emphasizes that the finish grade of landscape soil . , adjacent to the foundation should be at least 24" above the expansive bearing soils, frrmlv comoacted to reduce'the infiltration of water at the surface. The ~acy of fIll soil . material around the building must be verified to the satisfaction of'the design professional. , 4 \ ' ,~ Community Services Div, Building Safety CITY OF SPRINGFIELD, OREGON 225 5th Street, Springfield. OR 97477 Ph. 726-3759 ,Job Address City Job # 3D71 Olfd ;:":, ~{. ~ 17'..t!::'~h:{f;~r.:.~;.,,~ . ;~=.,. " . ~1,l:~'~{;'i~~:;,~~~~~,~l':J;~ ~;~~ \it :/'.;~~ ~,~ t. ..:.'~ ~:':-f~; / ".:~.:c<t;/ J, ~~ '~:;f~.""'i . .~. ~ .~,.: :.:.,,;r : - Mfidavit For Site Investigation Questionnaire , Foundation Sub-Grade Approval for ~ Residential Building Site in Ambleside Meadows - 1 st Addition ~ Subdivision The undersigned hereby affIrms that the excavation, structural fill and moisture stabilization methods forthe building site at the address shown above was observed by , me or'an authorized employee of my fIrm and that the following is true: ',1. The foundation sub-grade is capable of supporting a minimum of 1500psf, and is' adequate to support the building proposed for this site. ./" 2. The moisture content of the excavation was adequately maintained during the site preparation process and was adequately covered to stabilized moisture content, prior to anysigrilfIcant change in moisture content of the sub-grade. ,,- 3. The site is adequately graded and drained to prevent the collection of water in the , excavated area during construction. ~ ." , , ,~ , 4. The accompanying report titled "Site Investigation Questionnaire for Consulting Design Professionals" containing fIeld observations and instructions made on ' ,AUt.. 1 S. '2. 0/:)'2- (date) for the building site was completed 'either by myself or by an employee of my fIrm undermy supervision. To the best of my 'knowledge, the information contained 'in that report is complete and accurate. Name of Licensed Professional (p~t) . i\J,^-~( G. Date Cf. / 2 31o"L Ii Signature ~\.~. , FXPIRATIO~ D~:li 613o.l()~ I, \NO'& 1 tt ~ t9