Loading...
HomeMy WebLinkAboutPermit Building 2003-10-2 Oct-02-2003 03:21pm From-K & A Eniineerini. Inc, +541-684-9358 T-331 P,OOl!006 F-758 a engln..rlng K I A Engineering, Inc. P.o. BOI23624, Eugene, OR 97402 621 Markel Sl, Suite B, Eugene, OR 97402 (&41) 684-9399 Voice (641) &84.9368 FAX, October 2, 2003 Fax To: fax: Bob Barnhart, City of SprIngfteld From: Michael Remboldt, P.E. Paga: 6 726 - 3f. '7," Subject: 3480 AnlbJesid8:Dr.cqM 2003-00682 Date: 10/2/03 Attached Is the geoteChnical report for the Tyndall Homes project. Also, please note lhat the hOl1zontal steel for the retainIng wall footings may be located as much as 6-lnches from lne sides of the footings. The 3-lnches shown on our typlcal sections was a minimum cover. Please call me ff you have any Questions. Sincerely. ~ Michael Remboldt, P.E. K & A Engineering, Inc. Oct-OZ-Z003 03:Z1pm From-K & A Eniineerini. Inc, +541-684-9358 T-331 P,OOZ/006 F-758 Community Services Div, Building SllfClY Job Address. 3480 ~l[Ib 1 es i de Dr. CITY OF SPR]NGFIELD, OREGON City Job # COM 2003-00682 225 Sill Street. Springfield, OR 97477 Ph. 726-3759 AMBLESIDE MEADOWS SUBDIVISION--tST ADDITION Site ,Investigation Questionnaire for Consulting Design Professionals foundatIon requirements - new structures on residential Jots This form may be used as a temporary verification to, ..bow construction to continue on the Job site until the consultant's stamped aftidaVif'9n the site soil compaction and stablUzatlon Is submitted to the City. This form mtast be completed by a licensed design professional (engineer or architect) or hlslher authorized employee, and submitted to the building Inspector prIor to requesting City inspettloDS or placing foundation concrete. It is important that aU questions be ans",... d completely for the foundation site to be approved for coDStnlcUon. Owner and/or Contractor Tvnda 11 Homes 1. Date of the deSign professional's site evaluation? 9/15/03 2. Has the design professJonal revIewed a copy of the geotechnical Information for the subdivision that was provided with the building permit? Yes,!,. No_ If not. please contact this office for a copy of the report. The design professional must be familiar with the geotechnical infonnation before completing this form. 3. What was the size and depth of the excavation and lor fiD? EV("lllV..ti~;lC: ollnnl"/'\V 4H' x 451 and consisted of cut into slope ,in three, benchesranqiM in heiqht from 1 to 4-feet (4-ft at Nt corner). Was existing non-structural fill or expansive soil encountered on the lot? Ye5_ No....J!, If "yes", what types, depths and locations? <;ni1~ r.nnc;;sted qf O.5-ft b~own silty topsoil over 1.5 to 2.0pft., dense/hard dry brown silts {mod. plastlc} over weathered tan tuff.' No plastic clays encountered in excavatl0n. ' What measures were taken to remedy the soil condition (include type of engineered f1l1 used to stabilize the soil)? none requi red. . 1 Oet-OZ-Z003 03:Z1pm From-K , A Enaineerina. Ine, +541-684-9358 T-331 P,003/006 F-758 Communily Scrvi~es Div, Building Safely CITY OF SPRINGFIELD, OREGON 225 Snl Slrccl, Springfield, OR 97477 Ph. 726.n;1) Job Addres9 311~n A,Q}hl pd de> D~ City Job # COM 2003.0068? Is the site as prepared adequate kJ inadequate 0 to maintain constant moisture content in the sub grade? Note; Verification o/moisture stabilization in the sub grade is a requirement of the geotechnical report, and must be affirmed before construction can continue. If inadequate. what measures are needed to provide constant moisture content in the sub grade? Site is ad~ate however we reconunended installation of standard perimeter footinq drain. Is the site as prepared adequate ~ inadequate 0 to support the .t'.'.....osed , structure? An affirmative answer is requisite to proceeding with construction. It inadequate, what additional work Is needed to provide adequate foundation support? 4. Dldtbe design professional witness placement and ~ompaction of the engineered tin, or is there a speclallDspectioD report forthoominS from a quaDfied alen~y? I witnessed Placement 0 Special Insp/compaction report 0 no special engineered'f11l was requtred. S. The design professional Intends to use the following method for Installation of perforated perimeter footing drains: The design on the attached drawing provided by the design professional...... D The method shown on the original construction drawings......................... 0 The typical 'Foundation Drain' drawing attached to permit ..................... [] Perforated perimeter drains are not required....................... .......... ...... 0 Comments: Note: City inspectors will inspect installed drains prior to cover upon request... Call: 726-3769 to schedule inspection. 2 Oct-02-2003 03:21pm From-K & A Enaineerin,. Inc, +541-684-9358 T-331 P,004/006 F-758 Communily Services Div, Building Saftlly CITY OF SPRINGFIELD. OREGON 225 Sill Slrecl, Springlil.'lld. OR 97477 Ph, 726.3759 Job Address 348Q Amb 1 as,i de Dr. Ci~]ob' COM 2003-00682 Low-point crawl space drains are required to prevent the build-up of excess moisture inside the foundations during (and at'ter)eonstruction. This drain may be installed !flu: foundation placement onlv with the em.. "'~ oermistiioD of the de~dm'Droff>~'ODal~ a. The design professional has detennined the following: The crawl space drain is required when thefoundatio.n is installed..... 0 The low-point drain can be installed after foundation plaument without a ,significantmoisturebuild-up problem within thefoundation............. 0 (The low-point drain may be installed at the fram; n!i , stage of construction) {Jasl & beam. froming, -finD. e,,', b. Has the design professional observ,ed and approved the installation of the required low point drain?.................................. Yes, No xx if HyesH, where is the low point drain located under the building and where does i!-terminate at this time? (must be an approved location, i.e. street gutter, storm sewer, sump pump and discharge line to the street, etc,) The design professional must determine whether the approved permit drawings have adequate foundation steel. Is any additional foundation steel required that is not shown on the foundation drawings for the buDding? Yes Ncl-x. If "yes", describe additional steel required (or prOvide drawing). -, I.~I I' The following statement must be signed by the individual doing the observations and providing directionjor the excavation and site preparation work on the property. 3 ~.. Oct-02-2003 03:22pm From-K & A Eniineerini. Inc, +541-684-9358 T-331 P,005/006 F-758 CommunilY Services Div. Building SafelY CITY OF SPRINGFIELD. OREGON 225 5th Strccl, Springfield. OR 97477 Ph,726-3759 Job Address 3480 Amb 1 es i de 0 r . City Job # COM 2003-00682 The undersigned design professiolUll (or authorized employee) attests that he/she observed required moisture stability procedures on this ,tie, and lhot such procedll1'6S were accomplished bef()re any chtmges occurred In the molsture content of the sub. grade u,Mer and around the bUilding (where expansive soils wert encounterBd). The undersigned further attests that the sub-grade, as preparml, is adequtlte to support the building proposed for this site. Additional comments: I I (Note); A copy of this report shaD be kept on site with the all..,. , ",d plans at all times. This report shaH be followed by an affidavit, signed and stamped by the design professional under whose auspices this report was cuu.lyleted, affirming the infonnation herein. The Signed/stamped affidavit together with a copy of this report shall be submitted to,this office prior to requesting framing inspection for the building. Signatu~~~~., ... J- Name rAicb~el Rell:lbt\1~" Title QWMrlPr1'n~;-nlp. enOi-nP.p.r Company ~' ~. 1\, ~ng;'n"''''''{'nr..,......rrr Phone 6'A4-CJ~9Cl . ' Licensee License # ~~r~~~' D~mh~'~+ P ~ lQ474 expires 1 ~131'/2004 The geotechnical report for the Ambleside Meadows - 1st Addition Subdivision recommends inuriediate moisture stabilization of exposed expansive sub-grades, and that expansive soils be over-excavated and replaced with at least 12 inches of fill compacted to at least 95% of ASTM D698 for foundation preparation. The report also recommends that measures be taken to prevent water f~...m collecting in or around the foundation areas during and after the constrU~tion process, and that positive site drainage be provided to reduce the infIltration of surface water into the expansive soils. The geotechnical report further emphasizes that the finish grade of landscape soil adjacent to the foundation should be at least 24" above the expansive bearing soils, finnlv ~omoacted to reduce the inflltration of water at the surface. The adequacy of fill soil material around the building must be verified to the satisfaction of the design professional. 4 Oct-02-2003 03:22pm From-K & A En,ineerin,. Inc, +541-684-9358 T-331 P,006/006 F-758 Community Services Div, Building Sat"'lY CITY OF SPRINGFIELD, OREGON 225 51" Slreel. Springfield, OR 97477 Pit. 726.37S9 Job Addresli: 3480 ,/\mb 1 es i de Dr. City Job # COM ?nn1-nnIiR? Affidavit For Site Investigation Questionnaire Foundation Sub-Grade Approval for Residential Building Site in Ambleside Meadows - 1st Addition Subdivision The undersigned hereby affirms that the excavation, structural fill and moisture stabilization methods for the building site at the address shown above was observed by me or an authorized employee of my finn and that the following is true: 1. The foundation sub-grade is capable of supporting a minimum of 1500 psf, and is adequate to support the building proposed for this site. 2. The moisture content of the excavation was adequately maintained during the site preparation process and was adequately covered to stabilized moisture content prior to any significant change in moisture content of the sub-grade. 3. The site is adequately graded and drained to prevent the collection of water in the excavated area during construction. 4. The accompanying report titled "Site Investigation Questionnaire for Consulting Design Professionals" containing field observations and instructions made on .9.tl5I?nn~ (date) for the building site was completed either by myself or by an employee of my fmn under my supervision. To the best of my knowledge, the infonnation contained in that report is complete and accurate. Name of Licensed Professional (print) , Mi cha e 1 Signatu~" ~ - Date 10/2/03