October 2, 2003
Fax
TO:
Fax:
BOb Barnhart, . City of Sprtngfleld
1'~,;' '3"i("
From: Michael Remboldt, p.e.
Pages: 6
SUbjecl:3582 AmbJesldeOr.COM2003-00429 Date: 10fZ103
Attached is ttlegeotechnlcal report forb Dukes and Dukes Construction proJect at the subject address. Please caD
me If you have any questions.
Sincerely,
i
~
Michael Remboldt, P.E.
K & A Englneer1ng, Inc.
-i
Oct-02-2003 03:25pm From-K & A Engineering. Inc,
+541-684-9358
T-332 P,002/006 F-759
Community Services Oiv, Building SafelY
CrTY OF SPRINGFIELD, OREGON
225 51h Slrccl. Springfield. OR 97477 Ph. 72(,.3759
Job Address
City lob #
3582 Ambles1de Or.
r:nM ?nn3-00429
AMBLES IDE MEADOWS SUBDIVISION--1ST ADDITION
Site Investigation Questionnaire for Consulting Design Professionals J'
toundation requirem~nts - new structUres on residential lots
This form may be used as a temporary verification to,~w coDStru~tion to'<:ontlnue
on the Job site until the consultant's stamped amdaVit~9n the site soU compaction
, aDd stabilwtion is submitted to the City. This form milst be completed by a
licensed design professional (engineer or architect) or hlslher authorized employee,
and submitted to the buDding Inspector prior to requesting City inspections or
placing foundation con<:rete. It is Important that aU questions be answe"d
completelY-for the foundation site to be approved for construction.
Owner and/or Contractor
Qu.Ilpc; snd Dukes Construction
1. Date of the design professionaJ's site evaluation? 9/1 0/2003
2. Bas the desJgnprofessionaJ reviewed a copy of the geotecbniad information
for the subdivision that was provided with the building permit? Ye.r~ No_
If not, please conrad this office for a copy of the report. The design professional
must he familiar with the geotechnical information before completing this form.
3. What was the size and depth of the exeavation and/or rdl?
..u..c.a.v:oH'?" WAe: "pI'yonx 6~1 L.,,118' ~p~ C:('Jn~,i!lted of a cut into the
s100ed lot fn 2 benches. Cut height ranged from less than I.ft to 5-ft at
the SW corner. '
Was existing non-structural fill or expansive soil encountered on the lot?
Yes x No':: If "yes", what type~ depths and locations? ,. " ' .. " .
SolTs (based on two teSt-~1h an-a observatl0n au~I1\~J ':'UII::'\..l ~l..I..~Vl;)
conS1S't OT ~DPrQx. I-T\,. or Od1'II. lwvwl1 jJlol)\..k \..u'Pl.4..","v\j,!-I;ilt,~;}th
;:,uU-GlIl~jui~I'~0CM.;.. vvc,ltJl.!';-ft. ~n, ~~. :atYP!tElQ r'~..Uc clay
L -r l'l J ~l:i4l4" "4:1;"" ..'.....~A .,~r1ll. ..n+e
\lyr;.~ 'Cu.t., H..,...~.....r~ n.~ I..a..;.......::- .~ :J
What measures were taken to remedy the soil condition (include type of
engineeredf1l1usedtostabilizethesoil)? The tan. soft nlastic clays were removed
f~om the excavation and fill consistinq of5-1nch open-qraded crushe~
Quarrv stone was placed on the Underly'ng silts to &r1ng tne exc~vatlon
to footiM qrade. The footinqs ana/or Dottom of tn!! qu,,-rry SLUlltl fill
are, a minimum of 2-ft below final ground surface.
1
Oet-02-2003 03:25pm Frcm-K & A Eniineerins. Jne,
+541-684-9358
T-332 P,003!006 F-759
Community Services Div, Building Safely
CITY OF SPRINGFIELD, OREGON
225 5ID Street Springfield, OR 97477 Ph. 726.1759
Job Addres!l..,35A2 8mb' ~s 1 de Or
City lob # Cm1,2003~00429
Is the site as prepared adequatexfa inadequate 0 to maintain constant moisture
content in the sub grade? Note: Verification a/moisture stabilization in the sub
grade is a requirement of the geotechnical report, and must be affirmed belore
construction can continue.
If inadequate. wbat measures are n~ded to provide constant moisture content in
the sub grade?
Is the site as prepared adequate kJ inadequate D to support the proposed
structure? An affirmative answer is requisite to proceeding with construction.
If Inadequate, what additional work Is needed to provide adequate
foundadoDsupport?
4. Did the design professional witness placement and compaction of the
engineered ml, or is there a speclaJ inspection report forthcoming from a
qualified agency? 1 witnessed Placement 0 Speciallnsp!compaction,eport 0
no special inspection required for the quarry stone Till
S. The design professlonallntencls to use the fonowlng metbod for IDstallatlon
of perforated perimeter footiog dra~DS: .
The design on the attached drawing provided by the design professional...... 0
The method shown on the original construction drawings..................... .... 0
The typical 'Foundation Drain' drawing attached to pennit ............ ......... &J
Perforated perimeter drains are not required .... . .. .. ... . .. ... ..... . ... ........ .... 0
Comments:
Note: City inspectors will inspect insralleddrains prior to cover upon request...
Call: 726-3769 to schedule inspection.
2
Oet-02-2003 03:25pm From-K & A Eniineerini. Jne,
+541-684-9358
T-332 P,004/006 F-759
CornmunilyServiccS Div: Building Safely
CITY OF SPRINGFIELD, OREGON
225 51h Street, Springfield, OR 97477 Ph. 726.3759
Job Address- ~,82 AroI;lU.-iAfs n..
City Job # COM 20Q3-00429
Low-point crawl space drains an required to prevent the build-up of excess
molsture inside theloundations during (and after) (OBStruction. This drain
may be installed IflE foundation placement only with the un.. ~,t nermissi~n
pI the dPD nrnfp8.!innpl.
a. The design professional has determined the following.'
The crawl space drain is required when thefoundation is installed..... 0
The low-point drain can be installed after foundation placement without a
significant moisture build-up problem within the foundation............. 0
(The low-point drain may be installed at the frami"ng stage
of construction) poSI <I ",am, {1a1rlJfig. roofing. etc.
f
b. Has the design professional observed and approved the installation of the
required low point drain?................. ................. Yes, No x
if "yes ", where is the low point drain located under the building and
where does it terminate at this time? (must be an approved location, i.e.
street gutter, storm sewer, sump pump and discharge line to the street,
etc.)
The design professional must determine whether the ~.t'.t'..{)ved pennit drawings have
adequate foundation steel. lsaDY additional foundation steel required that Is Dot
shown on the foundation drawings for the building?
Yes No v. If "yes", describe additional steel required (or provide drawing).
r
The following statement must be signed by the individual doing the observations and
providing direction for the excavatio,! and site preparation work on the property.
3
Oct-02-2003 03:26pm Frcm-K & A Eniineerini. Inc,
+541-684-9358
1-332 p,n05/006 F-759
Community Service/! Div. Building Safllly Job Addres~ 358~1 e5' f t;ie Dr.
CITY OF SPRINGFIELD, OREGON City Job * COM 2003- 00429
225 5'" Slr~el, Springfield, OR 97477 Ph. 726-3759
The undersigned design professional (or authorized employee) attests that helshe
observed required moisture smb/ltty procedures on this sile, find that such procedures
were tlCcompUshed before any cluznges occurred in the moisture content 81the sub.
graM "nder and around the building (where expansive ,oils were encountered). The
undersigned further attests that the sub-grade, as prepared, is adequate to support the
buUding proposed for this site.
Additional comments:
(Note): A copy of this report shall be kept on site with the apI'''' .' Jed plans at all
times.
This report shall be followed by an affidavit. signed and stamped by the design
professional under whose auspices this report was completed, affirming the information
herein. The signed/stamped affidavit together with a copy of this report shall be
submitted to ,this office prior to requesting framing inspection for the building.
Signatur~'~~ 1-
Nanttkh;uill R~mhn 1 dt Title -C.l.lln.:.n.lr~ir\(' i r'!) 'pnQi npl=lr
Compan~ K & A Enaineerinn. Inc.
Phone 684-9399
Licensee ~11cW' Rp.mbo1dt. P.E.
License # 19474
expires 12/31/2004
The geotechnical report for the Amblesidc Meadows - 1st Addition Subdivision
recommends immediate moisture stabilization of exposed expansive sub-grades, and that
expansive soils be over-excavated and replaced with at least 12 inches of fill compacted
to at least 95% of ASTM D698 for foundation preparation. The report also recomm~nds
that measures be taken to prevent water from collecting in or around the foundation areas
during and after the construction process~ and tbat positive site drainage be provided to
reduce the infiltration of surface water into the expansive soils.
The geotechnical report further ,,~.u.t'hasizes that the finish grade of landscape soil
adjacent to the foundation should be at least 24" above the expansive bearing soils, .firmlv
comnacted to reduce the infiltration of water at the surface. The adequacy of fill soil
material around the building must be verified to the satisfaction of the design
professional.
4
Oct-02-2003 03:26pm From-K & A Ensineerini. Inc,
+541-684-9358
T-332 \P,006/006 F-759
Community Services Diy, Building Safc[y
CITY OF SPRINGFIELD, OREGON
225 Slh Street. Springfield, OR 97477 Ph. 726-3159
Job Address 3582 Amb 1 es i de Dr.
City lob # COM 2003-00429
Affidavit
For Site Investigation Questionnaire
Foundation Sub~Grade Approval for
Residential Building Site in Ambleside Meadows - 1 st Addition
Subdivision
The undersigned hereby affirms that the excavation, structural flU and moisture
stabilization methods for the building site at the address shown above was observed by
me or an authorized employee of my fIrm and that the following is tnle:
I. The foundation sub-grade is capable of supporting a minimum of 1 SOO psf, and is
adequate to support the building proposed for this site.
2. The moisture content of the excavation was adequately maintained during the site
preparation process and was adequately covered to stabilized moisture content
prior to any significant change in moisture content of the sub-grade.
3. The site is adequately graded and drained to prevent the collection of water in the
excavated area during construction.
4. The accompanying report titled "Site Investigation Questionnaire for Consulting
Design Professionals" containing field observations and instructions made on
9/1 0/2003 (date) for the building site was completed either by
myself or by an employee of my finn under my supervision. To the best of my
knowledge. the information contained in that report is complete and accurate.
Name of Licensed Professional (print)
Michael Remboldt. P.t.
Date
1 ()JM I?nn~
, .
~:~
flF:i474r~~
~ ....~~+. ..
-- ,,~-
~:;,::~~ORlGO.~~ ~
~~8~' ".~~
~~ ~...ol
1 DiNN!S ,,~
:JfPlRE9.lo/~~~+-
I
Signature~~