HomeMy WebLinkAboutPermit Building 2004-7-9
Jul-09-2004 11:15am From-K & A E~iineerini, Inc.
+541-684-9358
T-640 P.OOI
F-469
K I A Engln88r1~, Inc.
P.o. Box 23824. Eugene, OR 97402
521 Marlcel St., Sulle B, Eugene. OR 97402
(641) ~-93H Voice
(541) 884-8358 FAX
a
engln..rlng
Fax
Greg larkin
Cc: Bob Barnhart, City of Sprlngfleld6
To:
From: Michael Rembo/dt, P.E.
fft
Pages: 6
. Date: 719/04
72e-D330;126-3676
Subject: 2297 3"" St. COM2004.00641
Attached Is tile geotechnICal report for the subject address In Ableslde Meadows for River Valley Builders.
Please call me W you have any questions.
SIncerely,
.~
Michael Remboldt, P,E.
K & A Englneerl~. Inc.
Jul-09-2004 11:15am From-K & A Eniineerini, Inc.
+541-684-9358
T-640 P.002/006 F-469
Community Services Oi\', Building Safety
CITY OFSPRINGFIEfO, OREGON
22$ 5lh Streel, Springlield. OR 97477 Ph. 726-.3759
IobAddres~ ??o.'7. p~h_ ~t ,
City Job" COt-'?Qn4-nnIli41
AMBLESIDE ~ADOWS SUBDIVISION-1ST ADDITION
SitelnvestigatioD Questionilaire for Consulting Design Professionals
toundation requirements - new structures on residential lots
This form may be used as a temporary verifteadon to *Bow coDStruetlon to continue
on the job site untO the consultant's stamped atfldavft"in th~ site soJJ compaction
and stabilization Is submitted to the City. ThJsfonn mUst be completed by a
licensed design professional (engineer or architect) or hislher authorized employee,
and submitted to the building Inspector prior to requesting City Inspections or
placing foundation concrete. It is Important that aU questions be aaswered
completely.for the foundation site to be approved for construction.
Owner and/or Contractor Rtve.r Va 11 e.v. Buil de.JOS"
6J'29/04
1. Date of the design professional's site evaluation? ,
2. Has the design professional reviewed a copy of the geo~hnic:aJ information
for ~e subdivision that was provided with the building permit? feAt.!.. No_
(f not, please contact this office for a copy of the report. The design professional
must be familiar with the geotechnical information before completing this form.
3. What was the sJze and depth of the excavation and lor ftIJ?
Th~. PYI"~v~tinn i'c:' llIprWl/!\v\IiJilt't 55' widA."lC An l ~. henched i"nto the
wes,t,..far.i'nfI tHllHde.. .The.. hJ(fhes:'t cut is approxfmdelv 10' into bedrock
~lor:v.J -.tOi e.as:t e.d~e.. . Th.e. foundQtton pad was excavated i'nto essentially
3 o.elIche:.$'..tfiat are. orrente.Q aC!4Os.s. toe s., ope" '
Was exis~ng non-structural fill or expansive soil encoui1~red on the lot?
Yes_ N~ If "yes", what types, depths and locations?
What measures were taken to remedy the soil condition (include type of
engineered fill used to stabilize the soil)? ~ni 1~' in 'u the cut ct)ns\ ste.d
All. O. to 1, 5-fe.et of orgar'ltc s1"1 t ftops'01'1) over wea ther.ed tuffaceous
si;1 tli:'_ navi'OQ approxi.)Oate.1.v' 20 to 30% of cobbles and bou 1 ders.
,
,
: '
1
Jul-09-2004 11 :15am From-K & A Enaineerini, Inc.
+541-684-9358
T-640 P.003/006 F-469
Community Services Div, Buildin8 SufelY
CITY OF SPRINGFIELD, OREGON
225 51h Sln:d. SJ,rinl.2/kld. OR 97477 Ph. 726-:'159
Job Address. . 2297 37th St.
City Job * Cm12004-00641
Nn <:pl:!dfit" "rem&d.i~c::1I ~r~ r~qlli"'Qn fnl" thic: 11'11' ntl-i,:or tn:ln tn
ensure ~tC}biHty of the b~~t. This should consist of some sort
of retaining wall or reinforced slope system. .
~Y'\J thin Uft of r.t'U~hfllt1 ao~rflfli!b fill was placed on the J:l~es (less
than 4-inches)
Is the site as prepared adequate i] inadequate 0 to maintain constant moisture
content in the sub grade? Note; Verification of moisture stabilization in the sub
grade is a requirement of the geotechnical report, and must be oJjirmed before
construction can continrur,
If inadequate, what measures are needed to provide constant moisture content in
the sub grade?
Is the site as prepareQ adequate Ci1 inadequate 0 to support the proposed
structure? An affirmative answer is requisite to proceeding with construction.
If inadequate, what additional work is needed to provide adequate
foundation support?
4. Did the design professional witness placement and c:ompac:tlon of the
engineered fiU, or Is there a special inspection report forthcoming from a
qualified agency? I witnessed Placement IE Speciallnsplcompaction report 0
S. The design professional Intends to use the following method for Installation
of perforated perimeter tooting drains:
The design on the attached drawing provided b~ the d~ign professional no... 0
The method shown on the original constru~tion drawings. ..... ....... .... ........ 0
The typical 'Foundation Drain' drawing attacbed to pennit ................,.... 61
Perforated perimeter drai~s are not required .......". ...., ............; ,..,. ....... 0
Comments:
Note: City inspectors will inspect installed drains prior to cover upon request..,
Call: 726-3769 to ~chedule inspection.
2
Jul-09-2004 11 :16am From-K & A Eniineerina. Inc.
+541-684-9358
T-640 ,P.004/006 F-469
Communhy Services Div, Building Safcry
CITY OF SPRINGFIELD. OREGON
225 51~ SlrCCI. Springlield, OR 97477 Ph. 726-3759
Job Address 2297 31th St.
City Job # COM20Q4~QQ641
Low.point crawl space drains are required to prevent the build-up of excess
moisture Inside the foun4atJolIS during (and after) construction. This drain
may be Installed ~r foundation placement SWlv '!ith the exoress uermisslqa
of the deilfm.profenionats '
a. The design professional has determined the following:
The crawl space drain is required when the fQundfition is installed.. h. 0
. ..
The low-point drain can be installed after foll1liJQrion p[flCement without a
significant moisture build-up problem within the foundation..,...,.,.... 0
(The low-point drain may be installedat the fr~g. . stage
of construction) fMt & pORU"l{. ftJtJjfiIg. lie.
b. Has tlie design professional observed and approved the installation of the
required lowpomt drain?....,.. ............................ Yes, No ~
if "y,s", where is the low point drain located under the building anti
where does it-terminate at this time? (must be an approved location. i. e.
street gutter. storm sewer, sump pump and discharge line to the street,
etc. I
The design professional must det~nnine whether th~ approved pennit drawings bave
adequate foundation steel. Is any additional foundatJon steel required that Is not.
shown on the toundation drawings for the building?
Yes No x x . (f "yes '1, describe additional steel required (or provide drawing).
The following st~tement must be signed by the individua( doing the observations and
providing direction for the excavation tmd site preparation work on the property.
3
Jul-09-2004 11:16am From-K-' A Eniineerini, Inc.
+541-684-9358
T-640 P.005/006 F-469
C()mmunity Services OJ.... Building SafelY
CITY OF SPRINGFIELD. OREGON
225 5111 SU'CCI. Splingfield, OR 97477 Ph. 726-3759
Job Address 2297 37th St.
City Job # COM2004-0064l
The undersigned design pro!essio1UJ1 (or aUlhorlt.ed employee) Qltem th4t he/she
observed required moisture stability procedures on this site, and thlll sru:h procedures
were accomplished befor, 4IIY changes occurred in the moisture content of the sub-
grtUle under and tll'ountl the building (where ezptulsive Boils were encountered). Th,
undersigned further 4Itests that tlae rub-gnule, as prepared, is ad'tplllte to support the
building proposed lor this site. .
Additional comments:
(Note): A copy of this. report sball be kept on site with the apI'" ". ,ed plans at all
times.
This report shall be followed by an affidavit, signed and stamped by the design
professional under whose auspices this report ~as completed, affirming the information
herein, The signed/stamped affidavit together with a copy of this report shall be
submitted to this office prior to requesting framing inspection for the building.
Slgnature'~ \~ ..
Name Mi cbae 1 Rembo 1 dt. p, F . Title Prt:'c:i'tililnt:
Company K & A E.nqi"ne.e.rtnC'f. Inc.
Phone 684-9399
Licensee Michael R~mboldt. p ~
License # 19474
exprres 12/31/20Q4
The geotechnical report for the Ambleside Meadows - 1 sl Addition Subdivision
recommends immediate moisture stabilization of exposed expansive sub-grades, and that
expansive soils be over-excavated and replaced with at least 12 inches of fIll compacted
to at least 95% .of ASTM 0698 for foundation preparation, The report also recommends
that measures be taken to prevent water t&ULI& collecting in or aroun~ the foundation areas
during and after the construction process, ahd that positive site drainage be provided to
reduce the inf1ltration of surface water into the expansive soils.
The geotechnical report further emphasizes that the finish grade of landscape soil
adjacent to the foundation should be at least 24" above the expansive bearing soils, firmlv
comDlCted to reduce the infiltration of water at the surface. The adequacy .of fill soil
material around the building must be verified to the satisfaction of the design
professional.
4
Jul-09-2004 11 :1Tam From-K " A Eniineerini, Inc.
+541-684-9358
T-640 P.006/006 F-469
Community Servic",s Div. Building Safely
CITY OF SPRINGF1ELDi OREGON
225 Slh StrCcl, Springl1~}d. OR 97477 Ph. 726-~759-
. .
Job Addrea 22q7 37th. St-
City Job H COM2004-0~641.
Affidavit
For Site Investigation Questionnaire
Foundation Sub-Grade Approval for
Residential Building Site in Ambleside Meadows - 1 st Addition
Subdivision
The undersigned hereby affinns that the excavation, stroctum fill and moisture
stabilization methods for the building site at the address shown above was observed by
me or an authorized employee of my firm and that the following is true:
1, The foundation sUb-grade is capable of suppOrting a minimum of 1509 psf, and is
adequate to support the building Jo'~"Jo'osed for this site.
2. The moisture content of the excavation was adequately maintained during the site
preparation process and was adequately covered to stabilized moisture content
prior to anysignificaot change in moisture content of the sub-grade.
3, The site is adequately graded and drained to prevent the collection of water in the
excavated area during construction.
4. The accompanying report titled "Sire Investigation Questionnaire for Consulting
Design Professionals" containing field observations and instructions made on
June 29. 2.0Q4 (date) for the buildirig site was complete4 either by
myself or by an employee of my finD under my supervision. To the best of my
knowledge, the inf..,uuation contained in that report is CvAu1Jlete and accurate.
,Ncune of Licensed ~rofessional (print)t11 cbllli" "\i"'~,~' ':It . D, ~ .
\.
~.,~
SignatuI'8:=.;:". ., .~~ "~d, ~
Date 7/9/2004
"-
'. .