Loading...
HomeMy WebLinkAboutPermit Mechanical 1995-4-10 4~, . COMMERCIAL/lNDUSTRIAL -. PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 SPRINGFIELD ~ LOCATION OF PROPOSED WORK: 7'22 ~ 7'/Y ~ ASSESSORS MAP' /?~" "J'~- 50" 2. OWNER:-4Lr/'ffi.#.~/.&~. c::b ADDRESS: ?-/'/, ~...."......... .?: ?/~ CITY- P~r!'..~7Y DESCRIPTION OF WORK: //Y'57i7CL STAT'" ~OB NUMBER 9'5".::'S-:~ INSPECTION LINE: 726.3769 OFFICE: 726-3759 "5);-, TAX LOT: ~~/_~ PHON'" 2~~-~?/3 t7~. ZIP: <972.2.8 0~ ~~. ~'7 .....~ ~-.."'2."'-l"~ , NEW REMODEL ADDITION DEMOLISH NAME ADDRESS ARCHITECT' CONTRACTOR'S NAME ADDRESS GENERAl' OTHER VALUE: ~-.J! PHONE CONST. CONTRACTOR' EXPIRES PHONE PLUMBING' . ~ A_ "'~::::>'~Y?.;.>C;;/7P MECHANICAL: V#7~~"'" h(/_~ b_~ ~~_..,r?YCO_ ,t:;;??:4C.JIt:-'2::1q5: <,I.e/'. V~/ ; - . - "l~,' T J, , ". ,.- ELECTRICA' . I I I I I I I I I I [ I I TOTAL PERMIT PLUMBING NO. I FEE I CHARGE Single Fixture Relocated 8ldg. (new fix. addll\ Water Service Sanitary Sewer ft. It. Storm Sewer ft. Back flow Device TOTAL PERMIT - OFFICE USE - OUAD AREA LANO USF' . OF BLDG.~' # OF UNIT~' OCCY GROUP: # OF STORIES: CONSTR. TYP'" HEAT SOURC'" SO. FT. $/SO. FT. SQ. FTG MAIN SO. FTG ACCESS SO. FTG OTHER X X X PLAN CHECK FE" RCPTH DAT" I BUILDING PERMIT [5% State Su rchan4e I MECHA~....?n 15% Stafe Surcha.rQe I PAVING I PLUMBING 5% State Surcharge FENCE VALUE ~ SIDEWALK CURBCUT FT. ~~~~- :~.s- FT. MECHANICAL I-.EEII:!I'~"" Fumacelburner & vent < 100.000 BTUs Furnace/burner & vent I > 100.000 8TUs I I I I I I I I , I I [ $10.00 , .(?:~I . 1 Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationaryevap. cooler Vent Fan/Single duct Vent System apart from AC or htg. Mechanical exhaust hood and duct Permit Issuance /h/P;/' ~ HANDICAP ACCESS: FLOOD PLAIN' ZONING: LIGHTING POWER BUDGET: WATER HEATER: VALUE TOTAL VALUE OF PROJECT BY DEMOLITION SUBTOTAL PERMITS SYSTEMS DEVELOPMENT TOTAL PERMIT FEES I EXCLUDING ELECTRICAl ~.'2CS . REQUIRED INSPECTIONS. It is the responsibility of the permit holder to see that all inspectIons are made at the proper time. To request an inspection, call 726.3769 (recorder), state your City designated job number, job address, type of inspec.tion requested and when you wilt be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following worl< day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is ,covered. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. PAVING: After gravel is in place but prior to placing asphalt or concrete. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. FIREPLACE: PrIor to placing facing materials and before framin'g inspecti~n. SPECIAL INSPECTIONS: In accordance Section'306 of the State Specialty Code a special inspector shall be employed by the Owner! C,ontractor during construction of the 'following work. A copy of the speciaf testing reports shall be furnished to the Building Division. ATTIC DRAFT STOPS & CURTAIN WALLS CONCRETE SLAB: To be made after all inslab building service equipment, conduit, pi pi ng, accessories and other ancillary equipment items are in place but before any concrete is placed. FRAMING: To be made after the roof, all framIng, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanIcal are approved. STRUCTURAL CONCRETE: In excess of 2500 P.S.1. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 f) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage \Ines. To be made prior to covering or filling trenches. INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but before any lath or gypsum board 'interior wall covering is applied. HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.B.C. . Standards 43.8, -, UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. FIRE & SEPARATION WALL: Located and constructed according to plans. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) POST & BEAM: To be made prior to installation of Hoar insulation, decking or troor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathIng and gypsum board, interior and exterior, Is in place but before any plastering Is applied or before gypsum board joints and . fasteners are taped and finished. GLU-LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. STDS. 25-10,11). FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. STRUCTURAL MASONRY: (306 a.7) MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after al I excavating complete and form work and sub-base material in place. * In addition to the Inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. FINAL PLUMBING FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such. as landscaping, parking lot striping, etc. must be completed before requesting this inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department Inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. FINAL ELECTRICAL y FINAL MECHANICAL ADDITIONAL COMMENTS' PLANS REVIEWED BY DAT':: By signature, I state and agree, that I have carefully examined the completed application and do hereby certify thflt all Information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein,.and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with GRS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address Is readable from the street, that the permit card is located at the front of the pr.operty, and the approved set of plans will remain on the site at all times during construct' n. " Signaturl? ....- Date Y'~/o -;?..s- ..------ VALIDATION: AMOUNT RECEIVED: '2L. ?C> / of. ?t!P?' RECEIPT ': DATE PAID' RECEIVED BY: t/-/c::>-9 5~ , -:3f-"~~