Loading...
HomeMy WebLinkAboutPermit Mechanical 1995-8-1 COMMERCIAL/INDUSTRIAL' PERMIT APPLICATION LOCATION OF PROPOSED WORK: ?:2"? A/C!!>R-7# ASSESSORS MAP: /~ '? - ":3 5' - 5 <.. ~ ,# .JOB NUMBER 9~S?,g INSPECTION LINE: 726,3769 OFFICE: 726,3759 \ 225 Fifth Street, Springfield, Oregon 97477 ~, , , TAX LOT: /")~~ ~?7-?~orz:D ?7:u/ ry~,-".'i25 ADDRESS --Z~ ~ ~ ~, ?'~- /' DESCRIPTION OF WORt< $:5~C~ ~~~:P-/r:c:;.v?7/P ~ cCJ,L:;7'/~~ REMODEL Y PHONE: 7'-/6-$'7"':;- /' OWNER: CITY' STATE: ~~. ZIP' ~;:> Y;> :::> NEW ADDITION DEMOLISH OTHER VALUE: NAME ADDRESS PHONE ARCHITECT' CONTRACTOR'S NAME ADDRESS CONST: CONTRACTOR' EXPIRES PHONE GENERA' ' PLUMBING: MECHANICAL~~r~ ,~ ELECTRICAL: ~g"",...-?7~ ?~, <9 x,..-., ft: , ". ~"::SC2 :<~_ ?~-~?~ , " , PLUMBING MECHANICAL I I .. L-1-C.J:IAB.G.i I I \ I I I I I I $10,00 I ~~ NO. , FEE ' CHARGE "'n Single Fixture Relocated Bldg. (new fix. addl!) Water Service Furnace/burner & vent < 100,000 BTUs ' Furnacel burner & vent > 100,000 BTUs Sanitary Sewer It. Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent FanfSingle duct Vent System apart from AC or htg. Mechanical exhaust hood and duct I~"~/~~ ,,/ ,:;<) ;/~/ /~, 7';;""'7, Permit Issuance It. Storm Sewer It. I I I I Back/low Oevice TOTAL PERMIT TOTAL PERMIT ~H'?-". - OFFICE USE - HANDICAP ACCESS: FLOOD PLAIN' QUAD AREA: LAND US.' . OF BLDGS' OCCY GROUP: . OF UNIT<' . OF STORIES: HEAT SOURC.' ZONING' LIGHTING POWER BUDGET: WATER HEATER: CONSTR, TYp., sa, FT, $/SQ, FT. VALUE SO, FTG MAIN sa, FTG ACCESS SQ, FTG OTHER X X X TOTAL VALUE OF PROJECT PLAN CHECK FEE RCPT' DAT. BY I BUILDING PERMIT 5% State Surcharae MECH~-::I:::5 ~ 15% S'lale - r5 Surcharqe ?t? I PAVING PLUMBING DEMOLITION /P'..-- /'5'.~ :.?~ 5% State Surcharge I FENCE- VALUE $ SIDEWALK CURBCUT FT, FT, SUBTOTAL PERMITS I SYSTEMS DEVELOPMENT TOTAL PERMIT FEES I EXCLUDING ELECTRICA' --?.&:" ;;;>c> . REQUIRED INSPECTIONS t it is the responsibility of the permit holder to see that atllnspectlons are made at the proper time. To request an Inspection, call 726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, reqLlests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. x ROUGH PLUMBING, ELECTRJCJ:I..b.!. ~CHANICAl)No work is to oe Cl,. .\;.. "'... .... 1~1I these Inspections have been made and <;lpproved. PAVING: After gravel is in place but prior to placing asphalt or concrete. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work Is covered. ATTIC DRAFT STOPS & CURTAIN WALLS SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Ownerl Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. , FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel. in place, but prior to placing concrete. CONCRETE SLAB: To be made after all Inslab building ~ervice equipment, conduit, pIping, accessories and other ancillary equipment Items are In place but before any concrete Is placed. FIREPLACE: Prior to placing facing materials and before framing Inspectlo.n. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess 01 2500 P,S,I. (306 a,1) STRUCTURAL WELDS: Performed on th~ job. (2722 f) UNDERGROUND: PlumbIng, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are In place but before any lath 'or gypsum board Interior wall covering Is applied. HIGH STRENGTH BOLTING: During all boll installation and tightening operations. (306 a,6) SPRAYED ON FIREPROOFING: U,BC, Standards 43-8. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor Insulation, decking or floor sheathing, FIRE & SEPARATION WALL: Located and constructed accordIng to. plans. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 8.11 & Chapter 29) POST & BEAM: To be made prior to Installation of floor insulation, decking or floor sheathing, LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is In place but before any plastering Is applied or before gypsum board joints and fasteners are taped and finished, GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.BC. STDS, 25,10,11), FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing, STRUCTURAL MASONRY: (306 a,7) MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415, ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all exca....atlng complete and form work and sub-base material in place. . In addition to the inspec- tions specified, the Building Official may make or require other Inspections of any con:;tructlon work to ensure compliance wllh the Building, City or Development Code. CURB AND APPROACH APRONS: After forms are erected but prIor to placing concrete. FINAL PLUMBING FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before reque~tlng thIs Inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department Inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has t)ccn issued by the Building Division and posted on the premises. FINAL ELECTRICAL -4=- FINAL MECHANICAL ADDITIONAL COMMENTS: PLANS REVIEWED BY DAT" By sIgnature, I state and agree, that I have carefUlly examined the completed application and do hereby certify thf3.t all Information herein Is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY wIll be made of any structure wIthout permIssIon of the Building Safety DIvIsIon. I further certify that only contractors and employees who are In compliance with ORS 701,055 will be used on this project. ' I further agree to ensure that all required inspections are requested at the proper time, that project address Is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans wilt remain on the .site at all times during construction, ~ Signature ~YVl 1Yl, Date B-1 -q 5 VAll DATION: AMOUNT RECEIVED' ~':::::.""2C> RECEIPT ': /8 ~-;::> DATE PAID: ~-r-~" RECEIVED BY' ~~~Jf. .6' '/