Loading...
HomeMy WebLinkAboutPermit Building 1997-2-4 . . COMM ERCIAL/lN DUSTRIAL PERMIT APPLICATION ~ JOB NUMBER ~/&2_/J INSPECTION LINE: 726.3769 OFFICE: 726.3759 225 Fifth Street, Springfield, Oregon 97477 A"'"' At.- ~ /3 ,4 '1/ ,f" , /-:? -..?"3 - "3'<)- ~./"":2... . . ?~ ':A" LOCATION OF PROPOSED WORK; ASSESSORS MAP' OWNER' ADDRESS: CITY: TAX LOT: e1?7'9e5>C:5 K'TY ~19,uJ- ~ t: .141J<1 . /~~3 "3 y-Y Avt:, E#sr PHON'" r /1<:t:1,1#(,4. k/ /.J r/)CP,utd w/.'l. '7',4' f/ z. " STATE: ZIP: Rrr""ove )( rr.-f I.d$..e W/LJa:JIIV" Z<J7T/U..tC.- A~ "l-V/i.N7 OA"4f<' DEMOLISH OTHER VALUE: /~aOQ DESCRIPTION OF WORK: NEW REMODEL ARCHITECT: ADDITION NAME /.., c.."'" ..>.#' J ADDRESS /fSa..tC:VPIE. /lVtn. PHONE /0 *0 /Y'~. f4H 2.4,- - ~~ 9?".~ CONST'.a "t!'.J. _ _ .k' CONTRACTOR 'C '~EXPIRES 1I'''-9~HONE ~o.~~")-J/"3 7Yl !rl", HGtA'4.$ Sc.1/:rr~~2... 7"'=~A \o'VJl1. TN 7rrt' .1./ A 7/tJA//:Jt... CONTRACTOR'S NAME T#~ /.?j:J.~~ ~C>P 1fIJ-I. I NO. I I I I 1 1 1 I 1 I I 1 TOTAL PERMIT GENERA' . PLUMBING' MECHANICA' . ELECTRICA' . ADDRESS !!>C'...hl=/I! U? Il LRr T/?/ c... AJJ?" ?>> f-';:?<..e: . PLI) MBINl3 . FEE CHARGE Nn J'\ I ""L.. _CHAM1 1 1 I I I I I 1 1 I 1 MECHANICAL Single Fixture Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent > 100.000 BTUs Relocated Bldg. (new fix. addtl) Water Service Floor furnace and vent ~uspenQeci wall or l(oor mounted unit heater Appliance Vent separate Stationaryevap. cooler Vent Fan/Single duct Vent System apart from AC or htg. Mechanical exhaust hood and duct II. Sanitary Sewer It. Storm Sewer II. Backflow Device Permit Issuance $10.00 TOTAL PERMIT - OFFICE USE - HANDICAP ACCESS: OUAD AREA: # OF BLDGS:{!. OCCY GROUP: # OF STORIE~' LAND USE: FLOOD PLAIN' II OF UNJT~' ZONING; LIGHTING POWER BUDGET: WATER HEATER' CONSTR. TYP'" HEAT SOURCE: so. FT. $/SO. FT. VALUE so. FTG MAIN SO. FTG ACCESS SO. FTG OTHER PLAN CHECK FEE x X X TOTAL VALUE OF PROJECT -f".t:' . '2 "3 RCPP DATf BY , BUILDING PERMIT J 5% State ~I Surcharqe r;ifJ '1 MECHANICAL I 15% State Surcharqe I PAVING 86, So ~.)r? ..L~ , PLUMBING , DEMOLITION 5% State Surcharoe FENCE VALUE $ 1 SIDEWALK I CURBCUT FT. SUBTOTAL PE RM ITS SYSTEMS DEVELOPMENT <;fJ. y ~ FT. TOTAL PERMIT FEES I EXCLUDING ELECTRICAl /Y9.~~ . . REQUIRED INSPECTIONS It is the responsibility of the permit hold~r to see that all inspections are made at the proper time. To request an inspectIon, call 726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be made after excavation, but prior 19 set.up of forms. v , , ROUGH PLUMBING, r-t:.Lt::.l..:l KIL.~ --ri,.'fl:.l:HAN'IL.;AL: No work is to be covered until these inspections have been made and approved. PAVING: After graver is in place but prior to placing asphalt or concrete. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are .erected, all steel in place, but . prior to placing concrete. FIREPLACE: Prior to placing faci ng materials and before framing inspection. " , SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a'special inspe'ctor shall be employed by the Owner} Contractor during construction of the followi'ng work. A copy of the special testing.reports shall be furnished to the Building Division. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. ATTIC DRAFT STOPS & I'CURTAIN WALLS' X' , FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and . the rough electrical, plumbing and mechanical are' approved. STRUCTURAL CONCRETE: In excess 01 2500 P.S.1. (306 a.1) CONCRETE SLAB: To be made after all Inslab building service equipment, condu'lt~. piping, accessories and other . ancillary eq'uipment items are' '-'. in place b.ut\.befo~e any con.cret~ is placed. 'UNDERGROUND: PI~mbing, . electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. STRUCTURAL WELDS: Performed on the job. (2722 f) UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. INSULATION & VAPOR BARRIER: To be made after all insu~lation and req'uired vapor barriers are In place but before any lath or gypsum board interior wall covering is applied. FIRE & SEPARATION WALL Located and constructed according to plans. HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.B.C. Standards 43-8. . SP.ECIAL GRADING, .EXCAVATION AND FILLING: During earlhworl<. (306 a.11 & Chapter 29) POST & BEAM: To be made prior to Installation of floor insulation, decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, Is In place but before any plastering is applied or before gypsum board joints and fasteners are taped and finished. GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.S.C. STDS. 25.10,11). FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. STRUCTURAL MASONRY: (306 a.7) MASONRY: Steel location, bond beams groutIng or verticals in accordance with UBC 2415. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. *In addition to the Inspec- tions specified, t.he Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. ROOF SHEATHING AND NAILING: Prior to Installing any roof coverl ng. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. 'Y / FINAL ELECTRICAL SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this inspection. FINAL PLUMBING FINAL MECHANICAL v- I" FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made unlll a Certificate of Occupancy has been issued by the Building Division and posted on the premises. FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS: PLANS REVIEWED BY DAT" By signature, I state and agree, that I have carefully examined the completed application and do hereby certify thp.t all Information herein is true and correct, and I further certify that any and all work performed shall be dOlle in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. ' I further agree to ensure that all required inspections are requested at the proper time, that project address Is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. Signature _ ~ ;- ;:> ~.=:. -::::- Date ;2- t.,L - 97 VALIDATION: AMOUNT RECEIVED' .1" y4. 6i;:; RECEIPT". '?- t./ Y"7~ DATE PAID' RECEIVED BY: ?-q.-~ ? /:;?'~ d', - - ,/ / /-- -