HomeMy WebLinkAboutPermit Fence 1985-8-15
.. RE.ENTlAL"
APPLICATION/PERMIT
225 North 5th Street
Springfield, Oregon 97477
Building Division
726-3753
It is the respontrtbility of the permit holder to see that all irwpectiona are made at the proper tim€~ t}o.at 2CCh o;ddres8 is r>eadah7.e
11"0111 the street, and that ths permi t card is 'located at the front of the property.
-Buitding Divi:::wr: approved plan shell remain on tha BuiZding sits at aU times.
PROCEDUP,F: FOR INSPECTION R~QUEgT:CALL 726-3769 (pc-corder) state YOUI' City designated job number, job add:t>ess, type of inspecticn
requested and when you will be ready for inspection, Contractor's o~ Owners ncme end phone number. Requests received before 7:00 ~
"-'ill be made the same dc;y, requests made after 7:00 am will be made the n;;::r;t :iJOrking day.
',. Y;"'''' City Desigr.ated Job Nwnba- Ia, K50 g a If
R~nui~~n T~~~~~tinnR
D. SITE INSPECTION: To be nrzde after
excavation, but pPior to set up of
forms.
O . UNDERSLAB PLUMBING. ELECTRICAL &
. MECHANICAL: To be made before any
. IJOrk is ~overed.
D. llNDERFWOR PLUMBING & MECHANICAL:
". . To be made ppior to installation of
floor insuZation 01' decking.
D POST AND BEAM: To. be made pr>ior to 0 CURB & APPROACH APRON: After forms
instaUation of floor' insuZation or are erected but prior to pouring
decking. oonal'ete.
D ROUGH PLUMBING. ELECTRICAL & MECH- D SIDEWALK & DRIVEWAY: For all con-
ANTCAL: No work is to be covered crete paving within street right-
.,until these inspections have beer. pf-way, to be made after all exca-
made and appI'oved.' vating acmpZete & form work & sub-
D FI~EPLACE: Prior to pLccir.g facing base materiaL in pZ.aae. .
materials and before framing inspec- ~ .
tior:.. . ",
PENCE: When compZ~te -- Provide.
D FRAMING: Must be l'eque~ted after . ates 01' movable sections thPough
approval of rough pZwrJn..ng, electn- U E '
cal & mechanical. All roofing . . .
bracing & chimneys, etc. nrJst be
;'.completed. No work is to be CGn-
._:,,""".ceaZed until this inspection has
~be~n made and approved.
Job Location:
,?c; f?
F7/J3
; ./1 J.
3c:;
A8Ges3orS' Map #
Subdivision:
O:.mer:
kfJYE
105/9
~rf
u
C
E
Bo~ L-S;
~,
Address:
City,
[)2f "m'
II Addi ticn
n Remodel
n Uobile Boma
Date of Application
f'i~/t;-{C;
Contractors
I
()/j .}(,1 P A J
Genera Z
Plumbing
Electrical
Mechar.ical
C~~truction Lender
D
FOOTING & FOUNDATION: To be m:zde
after trenches are excavated and
forms are erected, but prior to
pouring acncretG.
UNDERGROUND PLUMBING, SEWER. W.1TER,
DRAINAGE: To be made prior to fil-
}i1".g trenches.
o
,4
4;:;;
Tax Lot #
1J:1 n {)('')
8 ~S(34-
.
vfW~
OIL
Signed:
Date:
r?et4
'1-/c;-~~
Pr..one:
7:2fo -{J bfS
Lisc.1I
Phon~
Zip:
~"'k':J~
Value
P:6&D.
EXDires
DEMOLITION OR ;~:OVE!J BUILDIilGS
=:J Sani ta:ry 8et.Jer ~apped ::It pr:..op.::rt'~. line
~ Septic tank p-'..Lr.7ped and fitle~ lJith gra~el
I Pinal - rthen abv---ve items are co.'rTpleted
~ and when demolition is complete or stru~-
ture moved and premises cLeaned up.
I Mobi le Hemes
::J Blocking GDUi Set-up
::J Plumbing connections -- sewer and water
::J Electrical Connection - Blocking, set-up
and plumbing connections 17T....st ce approved,
. before requesting electrical inspection !
~ AcC'esso1"d Bui tding
j
Address
O INSULATION/VAPOR BARRIER IHSPECTIONJ
To be made after atl insuktion ar.d
. required vapor ba:rI'iers are in place
. .: but before any lath, gypswn board or
wall eovering is applied, and before
. a7!'y inzulation is aoncealed.
O DRYWALL INSPECTION: To be made
after all drywall is in place,
but prior to any taping. .
O ~SONRY: Steel location, bond
beams, grouting or verticals in
accordance with U. B. C. Section
2415.
WOODSTOVE: After installation is
ccmp leted.
D
o
I Pinal - Aftar p:Jrcr.es, skirting, decks,
.--J etc. are eomp2eted.
o
All project eonditions, suoh as the installation of street trees, ea~letion of the
required landscc:pir:g, etc., must be satiSfied before the BUILDING FINAL can be requested.
D FINAL PLUMBIllG
o FINAL UE~HANICAL
o FINAL ELECTRICAL
o
o
FINAL BUILDING: The Final Building Inspection must be requested after the Pinal Plumbing
Electrical, and Mechanical Inspectionn have been made and approved.
"AL[, MANHOLES AND CLEANOUTS HUST BE ACCESSIBLE, ADJUST!!ENT TO BE U/IDE AT NO CJST TO CITY I Page 1 of 2
JOB NO. {:(S'O 6;)'-/ SOLAR AC'eS
Zone: Oacu:oancl.! Grouv:
Lot Sq. Ft;;.
Z of lot CDVerag~
# of Stories
Tota1. Height
Topography
lITEM
I Main
I Ga:roaae
I ClU""OOl't
I Acces80ru
I
I
Is.D.c.
SQ.FTG
TOTAL VALUE
( VaLUe)
1.5 x
Building Permit
State Surcharge
Total Cha......gea
lITEM
I Fi.:r:tures
I Residential (1 bath)
I Sani ta.ry Sewe!'
Water
Plumbing Permit
State Surcr.arge
Total. Chal"aes
lITEM
I Res. Sa. fta.
I New/Extend Circuits
I Temporary Service
Electrical Per,mit
State Surcharae
Total Cha:t>c;es
lITEM
I Purnace ETU'S
I E:::haust Hood
I Vent Fan
I Woodstove
I
Permit Issuance
Mechanical Permi t
State Surcharae
I NO. I FEE
I I
I I
Ilia.,
I I
I I
I I
I NO./
I I
T()tal Charoes
-- ENCROACHMENT --
I SeC".lri ~ DePOsi t
Storage
Maintenance
Ipernri.t
I Total CharGes
I Curbaut
I Sidewalk
Fen:Je
Electrica Z Labe Z
\ Mobile Home
I
I
I TOTAL AMOUNT DUE:-
WT TYPE
Interior
Corner
Panhandle
Cut-de-sac
x
Value
CHARGE
FEE
FEE
I-
i.
I I
I I
I I
I I
I I -
I
I
/(,(,00 I
I
I
fr eO
:c.gc .:::
REQ.-
.
II En2'f'GU Sources
Heat
I
I
L':'COG~
Type/Cor:st:
Bedrooms:
Lot Faces -
To.me
Setbac::ks
P.L. ~House Carage
North I
East
South
jWest
I Access.
I
WateI' Yeatp.1'
Range
Fireplace
wood::;tove
Fees
Building Value & Permit
I
I
I
, -
I
I
I-
This permi t is granted on the express condi tion that the sdid construction
shalt3 in all respects, conform to the Ordinance adopted by the City of
Springfield, incLuding the Zoning Ordinance, regulating the construction
and use of buildings, and may be suspended 01' revoked at cny time upon vio-
lation of any provisions of said Ordinances.
IPlan Chpr!1( Fee:
I Date Paid:
IReceipt H:
I Signed:
Plumbing Permit
No person shall construct, install, alter 01' change any new or e~isting
plumbing or drainage 8Y8t~ in whole or in part, unless such person is the
legal possessor of a valid plumber's license, except that a pe~son may do
plumbing work to property which is owned, leased or operated by the appli-
cant.
.
Electrical Perm it
Where State Law requires tr.at the eleatrical work be done by an Ele[!trical
Contractor, the electrical portion of this permit shall not be valid until
the Zabel has been signed by the ElectricaZ Contractor.
i
Mechanical
Permit
PLan Examiner
uar;e
I HAVE CAREFULLY E~~INED the completed application for permit, and do
hareby ael'tify that aU information hereon is true and correct, and I
further certify that any ar.d all work perfo~ed shall be done in accor-
dance :.rith the 01'din~es of the City of Springfie7.d, and th~ La-..JS of the
State of Oregon p3rtaining to the work described herein, and that NO OCCU-
PANCY will be 17t:Lde of any structure without permission of the Building Di-
vision. I further certify that only contractors ar~ enployees who are in
compliance with CRS 701.055 will be used on this project
$-/ .';>-.;~
Date