IT IS THE RESPONSIBILITY OF TilE PER.'1IT HOLDER TO SEE THAT ALL INSPECTIONS ARE MADE AT
THAT EACH ADDRESS IS READABLE FROM TilE STREET, AND THAT TIlE PERl'llT CARD IS LOCATED AT
PROPERTY. BUILDING DIVISION APPROVED PLANS MUST BE ON JOB SITE AT ALL THIES.
PROCEDURE FOR REQUESTING INSPECTIONS, Call 726-3769 (recorder) state you CITY DESIGNATED JOB NUMBER,
job address. type of inspection requested and ~lhen you will be ready for the inspection. Contractors
or owners name and phone number. Requests received before 7:00 amfwill be made the same day, requests
received after 7:00 am will be made the following work day.
Your City Designated Job Number Is: 970 ~B$?
Job Address: ':O('O~ N""R7H' )t;1'Sr.
Owner: ~/7'~ ~ 5;;>L9J~.r/c!S'"C.O Phorie:.c~Qy'T 7<t;-~&Y)
~~~t6:-if" _ ~~H..!", ~1~#~ Phone: 7-:?~-:3'"2"?.s-
D CITY'S SITE PLAN REVIEW BOARD INSPECTION: Must be requested 2 days in advance of the date you
wish inspection. All project conditions such as landscaping, parking lot striping etc. must
be com~leted before requesting this inspection.
\C1
[K]
o
o
D
SITE INSPECTION: To be made
after excavation, but prior
to setup of forms.
UNDERSLAB PLffi1BING: ELECTRICAL
& ~ffCHANICAL: To be made before
any work is covered.
CONCRETE SLAB INSPECTION: To be
made after all inslab building
service equipment, conduit, piping.
accessories and other ancillary
equipment items are in place but
before any concrete is poured.
o
FOOTINGS & FOUNDATIONS: To be made
after trenches are excavated and
forms are erected, all steel in
place. but prior to pouring concrete.
UNDERGROUND: Plumbing. Electrical.
Gas. Sanitary Sewer. Storm Sewer,
Water and Drainage lines. To be
made prior to covering or filling
trenches.
D
o
UNDERFLOOR: J Plumbing. Electrical,
Mechanical. To be made prior to
installation of floor insulation.
decking or floor sheathing.
POST & BEAM: To be made prior to
installation of floor insulation.
decking or floor sheating.;:
FLOOR INSULATION & VAPOR BARRIERS:
To be made prior to instal12tion
of decking or floor sheating.
D
D
D
~~SONRY: Steel location, bond beams
grouting or verticals in accordance
with U.B.C. Section 2415.
R~ SHEATHING k~D NAILING: Prior
to installing any roofing.
ROUGH PLUMBING. ELECTRICAL &
MECHANCIAL: No work is to be covered
until these inspections have been
made and approved.
00
D
D
o
o
D
FINAL PLUMBING
FINAL ELECTRICAL
D
D
ATTIC DRAFT STOPS & CURTAIN WALLS.
SPECIAL INSPECTIONS: In accordance with
Section 306 of the Building Code a special
inspector shall be employed by the ~~er/
Contractor during construction of the
following work. A copy of the special
testing reports shall be furnished to the
Building Division.
FIREPLACE: Prior to
materials and before
inspection.
placing facing
framing
D
INSULATION & VAPOR BARRIER: To be
made after all insulation and
required vapor barriers are in place
but before any lath or gypsum board
interior wall covering is applied.
FRAMING: To be made after the roof.
all framing. fire blocking and
bracing are in place and all pipes,
chimneys and vents are complete and
the rough electrical, plumbing and
heating wires. pipes and ducts are
approved.
,
STRUCTURAL CONCRETE:
P.S.I. (306 a.I) -
In excess of 3000
~
~
~
o
STRUCTURAL WELDS: Preformed on the
job. (2722 f)
HIGH STRENGTH BOLTING: During all .;.. l:
bolt installation and tighting
operations (306 a.5)
D
D
~
LATH AND/OR GYPSUM BOARD INSPECTION: ---,
To be made after all lathing and ~
g)~sum board. interior and exterior.
is in place but before any plastering I
is applied or before gypsum board ---1
joints and fasteners are taped and
finished. , ,
GLU-LAM BEN-iS: Inspection Certificate.
by an approved agency. furnished to
the City's Building Division before ...}
beams are placed. (2501-U.B.C. STDS. :...
25-10,11)... -.,,'. ;',.
SPRAYED ON FIREPROOFING:
Standards 43~8)
SPECIAL GRADING. EXCAVATION
FILLING: frJring earthwork.
& Chapter 29)
FIRE & SEPARATION WALL: Located &
censtructed according to plans.
(U.B.C.
AND
(306 a.1I
D
D
WQODSTOVES:
completed.
After installation is
=:J
SIDEWALK & DRIVEWAY: Required for
all concrete paving within street
right-of-way, to be made after all
excavating complete & form work &
sub-base material in place.
CURB AND APPROACH APRON: After forms
are erected but prior to pouring
concrete. * In addition to the inspections
PARKING LOT: After gravel is in specified hereon, the Building
place but prior to placing asphalt Official ~ay make or require other
t inspections of any construction
or concre e. .t ~ k . 1- . h
0"'.... Z:""r 4r (~~r //J'~.P. wor t~ aecerta,n camp la~ce Wlt
IE] ~=~.:;-:: .f{' .r .&>_. _ the BU1Idlng, Clty or Zomng Codes.
_,n/ -.:-~ r~ C.c.. ~i'H'; #F?'I./~T/~. _ _ _
~
D
-.
D
FINAL ~IECHANICAl
FINAL BUILDING: Must be requested after the final Plumbing. Electrical, ~iechanical and Fire
Department inspections are made and approved. No Occupancy of the premises can be made until
a Certificate of Occupancy has been issued by the Building Division and posted on the premises
FINAL FIRE DEPARTMENT
SIGNATURE
DATE
* ALL MANHOLES AND CLEANOUTS ~IUST BE ACCESSIBLE, ADJUSTMENT TO BE MADE AT NO COST TO THE CITY.