\ r'
,
.
'.
PAGE 1,
MINUTES
CITY OF SPRINGFIELD
DEVELOPMENT COORDINATION BOARD '
DOW CORNING CORP, - OFFICE/LAB & LUNCHROOM/SHOWER BUILDINGS
PROJECT: 1BOO SOUTH "A" STREET
D. C. if 85-5
DATE: JULY 3. 1985
Meeting Information
A, Staff Members:
J...QR):JF PI FGFR, RIITI..JlllJG nTV : GREG f10TT. PI ANNING'nAVF RRmm, TRAFFTr IJljI . I F~ rRATGMTI F
ENGINEERING nIV.: MTKF HIIIJMAN. FIRF MARSHAl : rHI'.c.K....DilvT~ ~ 'L..B......JtlATFR FNGTNFFRTNG nFPT .
VIRGIL LANGI EY. S,IJ.R. FI FrTRTr FNGTNFFRING IJFPT
B. Applicants Present:
1. Owner (s): TOM FRFFMAN .'OWNER' S RFPRFSFNTIUllLF
2. Agent(s): RICH f1ARRIS. ARCHITECT
3. Others Present:
D.C.if 85-5
is ( ) Approved
(X) Approved with conditions (see Section 18,02, Springfield
Zoning Code).
( ) Denied - you may appeal this decision to the Planning
Commission.
Reason for Denial
( )
( )
Continued until more intormation is
necessary.
Referred to the Planning Commission
Reason:
APPEALS
A decision by the Board may be appealed to the Planning Commission, The appeal
may be filed in writing with the Planning Department within ten days of the
Board's decision. The decision of the Planning Commission shall be final.
REVOCATION
Development Coordination approval or approval with conditions shall be auto-
matically revoked if any development and/or construction is not commenced
within 2 years from the date of approval.
Conditions of Development Coordination Board Approval:
1- Sanitary Sewer connection will be made to an existing sewer lateral which is connected
to a manhole near the northeast property corner,
2- Storm Sewer connection will be made to an existing 12" City main on the north side of
the South "A" Street right-of-way. This line will be crossing two sanitary sewer lines
and a 16" water main prior to reaching its point of connection, Your Engineer shall
verify depth and location of the existing utilities and design the new crossing accordingly.
3- Water Service is via an existing 16" water main in South "A" (Aster) Street which has
an average pressure of 55 psi. Due to the combination of domestic and fire protection
demand, it is recommended that a new fire hydrant by installed along the street frontage
of this property to provide additional fire flow capability,
Please coordinate this requirement with both the City Fire Marshal and S.U..B.
~
.
-2-,
.
.
4- The portion of South"A" (Aster) Street along the frontage of this property is not
improved at this time, In the interest of initiating an improvement project for
the street, the City requires that an Improvement Agreement be signed by Dow Corning
prior to issuance of a Building Permit for the proposed construction. Also, the City
has agreed to improve their portion of the street frontage immediately west of the
subject property in conjunction with improvement of the Dow Corning frontage,
See the letter to Mike Kelly, Director of Public Works from Tom Freeman, Plant Engineer
dated July 1 1985 regarding this subject.
5- Electrical service to the proposed structures should be coordinated with S,U.B. Electric
Engineering Dept, They will need specific Electrical demand information to finalize
their design for service.
When street improvements occur, power poles along the street frontage will require
relocation, This will need to be coordinated in the design of the' public improvements
prior to construction,
6- Submit plans for landscaping and irrigation with the working drawings for building
permit purposes.
7- Storm drainage from the site improvements shall be connected to a J box at the North
property line prior to making the street crossing, 'Coordinate this requirement with
the City Engineering Division.
8- In compliance with the local fire sprinkler ordinance, both proposed buildings will
be provided with fire sprinkler systems,
9- Coordinate specific requirements for identity signs with the City Sign Inspector,
10- Refuse will be periodically colle~ted by a janiorial service.
These minutes were transcribed by Lorne Pleger, Board member.