HomeMy WebLinkAboutPermit Mechanical 1988-8-1
Job Address
to CJ c;-
6
AJ,
19
!Ju.,: K&ph !;;ho..ur
CITY Of SPRINGfIELD . INfDR/IATIDN UN"
CDIIBHIATIDN APPLICATION/PERMIT, 726-3753
EIIERGV SOURCES: Sq, ftq. 1,Iain
Heat ~q. Ftg. Access.
Water Heater Sq. Ftg. Other
Ilew Add A Iter Rep,
--Fence Demo Change/Use
Other- -
Range
ValuE of Hork:
I INSPECTION LINE
726-3769
vIYWu 10n~
E, r::?zOrUL.Jt<-<-..Phone lr/h
~Zb.. ~/C) j 57f0
Construction Lender ~ ~ ,.ni2-
Address
/3;;2
BUilciinQ Permit Info: Describe Worklioe..
Family ~esidence Hith ,I'I.ttached Ga-raqe) ~
:iJc ~ ~
U
Build Single
~
B
~
E;""'
~
Legal Description
~
Owner
Address
Ut~lliN TtAt'l
(name)
Phone
(address)
(1 ics. no.)
(exni res)
(ohone no.l
Primary
Electrical
c,~'"}
",1.,/,\/\
Structural
-
Mechanical
CONTRACTORS
(namel
(addrpc;c;)
(l ice;, no,)
(pxnirps)
(ohnnp no,)
General
Plumbina
~~ 1\ .A"6
Electrical
~lechani ca 1
~
PLUIIBING
ELECTRICAL
MECHANICAL
NO,
FEE r.HARr,F NO
~~~ r~ARr,~ NO,
~~~ r~AQr,~
Each single fixture
Residence of
So' FT,
furnace/burner to
BTU's
Relocated building
(new fix. additional)
S.F. Residence
(1 bath]
Duplex (1 bath) each
New circuits alts.
or extensions
Floor furnace
and vent
SERVICES
Recessed wall
Sn~r~ np~tpr ~nrl vpnt
Storm Sewer
Of
amps.1
I
Appliance vent
seoaratp
I Stationary evap.
cooler
I Vent fan with
sinole duct
I Vent system apart
heatino or A.C.
I Mechanical exhaust
hood and duct
from
Additional bath
Sewer
Temporary Construction
Change in existing
rpsJ df.nC':P
multifamily, comm. Or
Tnduc;.trial
\<Jater servi ce
?~
COMM,/INO, FEEDERS
Install/alter/relocate
dic;.trib. fpprlprs
10f
I
I
I
Wood stove/heater
amps.
0/-fIMdl-lciA / s
d{)
,
b(('
7S
ISSUANCE OF PFRmT
TOTAL CHARGES
WHERE STATE L'W REQUIRES
shall not be valiJ until the
I TOTAl CHARGES I TOTAL CHARGES
that the Electrical work be done by an .Electrical Contrac.tor. the electrical portion of this pernit
label has been signed by an Electrical Supervisor and returned to the Building Division
I HAVE CAREFULLY EXMlINED the completed aprlication for permit, and do hereby certify that all information hereon is true
and correct. and I further certify that any and all work Derformed shall be done in accordance with the Ordinances of the City
of Spri ngfi e 1 d and the laws of the Sta te of Oregon pertai n i ng to the work descri bed herei n. and that 1m OCCUPArKY will be made
of any structure without the permission of the Building Division. I further certify that my registration with the Builder's
Board is in full force and effect as required by ons 701.055, that if exempt the basis for exemption is noted hereon, and that
only subcontractors and employees who are in compliance with OP.S 701.055 will be used on this project.
Zone
Fire Zone
Flood Plain
Tvpe/Const,
Bedrooms
Stories
WI LLJ 19M:> SIGN^TURi3.fftJ~
FOr. OFFICE USE mIL v
Sq, Ftg, Ilain
Sq. Ftn. Access
Sq, Ftg, Other
OATE
f~h%
NAI'IE(please print)
(JOILJN (E
Units
Occy Load
Occy Group
x
Va1ue
Value
Value
x
x
TOTAL VALUATION
BUILOING PERMIT
Charges and
Surcharges
, Plan Ck, Comm/lnd
____________...Q2!/Bldo Per Fpp
Plan Ck. R'es
30%/Bl do Per Fee
Fence
'Systems Development
Cha rpe (1. 5%) ,
PLUIIBING PERMIT
Charges and~.."'"
Surcharges .
06mo
ELECTRICAL PERIHT
Cha rges and
Surcharges
.Sldewalk
MECHANICAL PERMIT
Charges and 'a
Surcharges VI
AlC Paving
15.00 I Curb Cut
--------7-~1
Total Comb. Permit
I
I TOTAL
j 15-7~ I
.
.
COMBINATION APPLICATION/PERMIT (CAP)
PERMIT VALIDATION
I. Applicant to furnish
A. Job Address
B. Legal Description
1. example- Tax Lot 100, Lane County Map Reference
II uj 43
2. exam~le- Lot 1. Block 3, 2nd Addition to
~pringt;eld Estates
C. Name, etc. of owner and construction lender
D. Energy Sources
1. example- heat/electrical ceilin~/or forced air Qas
2. examole- waterheater/electrlcal/or solar
E. Square footage or valuation, etc. -
1. examole- 1250 sq. foot house. 500 sq. foot garage
2. example- if new project. check-new - if addition,
check add. etc.
F. Building permit information:
1. examole - construct single family house with an
attached garage
2. examole - remodel existing garage into family room
3. examole - convert single family residence into
restaurant (change of use)
G. Value of work as defined in Section 303 (a) of the
Structural Specialty Code
H, OESIGN TEAM ANO CONTRACTORS
To avoid design or construction delays, Building
Division Staff must be able to contact appropriate
persons regarding design information or job site
corrections. etc.
II. Abbreviated Plumbing, Mechanical, &. Electrical Schedules
A. Except where blank spaces occur in the description
portion of the Mechanical and Electrical Schedules,
the applicant need fill-in only the No. Boxes adjacent
to the appropriate item(s) to be installed
B. Full Plumbing. Mechanical, and Electrical Schedules
are available at the Building Division
1. To conserve space on the permit form the schedules
have been abbreviated
2. If the item(s) to be installed are not covered on
the abbreviated schedules you should consult the
full schedules
C, BUILDING DIVISION STAFF WILL FILL OUT ALL FEES AND
CHARGES ON THE SCHEDULES
D. As noted on the CAP. the label must be- del ;vered to the
electrical contractor for signature by his electrical
supervisor. The general contractor is_not authorized
to sign the electrical label.
III. Applicant to sign and date
Whenever possible, the initial application will be used as
a worksheet only. Where possible. Building Division Staff
will prepare a type written copy and return it to the
applicant at the time the actual permit is issued for his
signature.
IV. Fees and Charges
Plan check fees are due and payable at the time of the
application. and no plans will be processed until these
fees are paid. All other fees and charges are due and
payable when the permit is issued.
\WC6~~
~,.-\\-
V, FOR OFFICE USE ONLY
Permit Clerk
~
PROJECT CONDITIONS TO BE SATISFIEO BEFORE OCCUPANCY:
Permit applicant exempt from registration with the Builder's Board because:
Additional Project Information:
'. ....
.
PLANS REVIEWED BY:
name
signature
date
.
.