Loading...
HomeMy WebLinkAboutPermit Sidewalk 2014-09-18SPRINGFIELD 3 Com+ _- OREGON w .springfield-or.gov CITY OF SPRINGFIELD Building / Public Works Permit PERMIT NO: 811-PW2014-00151 225 Fifth St Springfield,OR 97477 Phone: 541-726-3753 Inspection Phone: 541-726-3769 Fax: 541-726-3676 permitmnter@spdngfield-ocgov PROJECT STATUS: Issued ISSUED: 09/18/2014 EXPIRES: 03/17/2015 STATUS DATE: 09/18/2014 APPLIED: 09/18/2014 SITE ADDRESS: 6449 A ST, Springfield, OR 97478 SCOPE: ASSESOR'S PARCEL NO: 1702344204201 TYPE OF STRUCTURE: PROJECT DESCRIPTION: Repair of sidewalk OWNER: MINIERJAMES Phone Number: ADDRESS: 6447 A ST SPRINGFIELD OR 97478 OWNER: TRAVESS GEORGE T Phone Number: ADDRESS: 1495 CHEEK ST SPRINGFIELD OR 97477 OWNER: WOODALL BARBARA ANN Phone Number: ADDRESS: 6449 N A ST SPRINGFIELD OR 97478 CONTRACTOR INFORMATION Contractor Type Contractor Name Lie Type Lie No Lie Exp Phone INSPECTIONS REQUIRED Inspections 9506 Sidewalk - Setback Sidewalk - Setback: After forms are erected but prior to placement of concrete. By signature, I stale and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State or Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located al,the front of the property, and the approved set of plans will remain on the site at all times during Owner 4 Contractor Signature 'iflS ITS IIAU EXPIRE IFTHE WORK " ' 1 HORIZED UNDER I -HIS PE_RN41T IS NOT " HCH) OR IS ABANDONED FOR 0 I)AY HIJOD. Springfield Building Permit 'rTPPI1*IG) .,. wl I requires you to t$3tgow 1`14108 adopted by the Oregon Utility Notification Center. Thoso rules are se( forth in OAR 952-001-0010 through OAF; 952-001- 0090. You Inay obtain copies of the rules by calling the center, (Note: the telephone number for the Oregon Utility Notification Center is 1-800-332-234,1). 9/18/2014 8:33:12AM Page 1 of 1 225 Fifth Street, Springfield, Oregon 97477 Transportation & Engineering Section, Public Works Department Phone: 541 726-3753 SITE INFORMATION Location of Work:�9S Applicant: /A. G& vt,✓VS f- S O 1-5 CG NS % Phone: f_ `I S � 8�0 Address: PC). Ox �tai! City: r^— � State: Ole ZIP: �(? y % % Tax Map Tax Lot Subdivision Owner: Phone: Address: City: State: ZIP: REQUESTED PERMITS: Sidewalk Amount of sidewalk in excess of 90 feet ❑ Sidewalk Repair ❑ Curb Cut/Driveway: Number of Driveways ❑ Multiple Permit Discount each: (Maximum 2) Multi permit discount good for one site and one site inspection only applies to 2nd and 3rd permits only. Not sidewalk repairs ❑ 5%Technologyfee ❑ Proof of Insurance: $500,000 Minimum if work is done by property owner CONTRACTOR'S INFORMATION Name: GL/1J rt Address: 104.00 19.00 $104.00 1st Cut due with permit $ City: 5;-99 r r\ State:p Jam' _ ZIP: C( 2 y 7 Contractor Registration # L- 6j `} a r C p Expiration date: Project Supervisor 11011-19011110101K Fees @$0.09 SF X $67 2nd Cut Phone: �7—r/-! 53 6��- 9 Phone: An inspection request should be made prior to pouring concrete, after the proposed work has been formed and made ready to pour. Curb cut and sidewalk inspections call: 541 726-3769 (recording) State your designated Cityjob number/permit number,job address, type of inspection requested, and when you will be ready for inspection. Contractor's or Owner's name and phone number. Requested received before 7:00 am will be made the same day, requests after 7:00 am will be made the next working day. Inspections are to be called in after excavations are made and form work is in place, but prior to pouring concrete. are required to SIGNATURE: 48 hours before before digging.